10000203 - Consultancy on Drainage Water Reuse

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

Iraq is facing an intensifying water crisis, driven by a combination of environmental and human-induced factors. Climate change impacts led to strain on water availability. A significant decline in Euphrates and Tigris Rivers discharge is further exacerbated by the transboundary water flow control by neighbouring countries, which severely restrict the volume of water reaching Iraq. Beyond water scarcity, inadequate and fragmented water resources management further aggravates the situation. Inefficient allocation practices, limited monitoring and planning capacities, and weak coordination between institutions contribute to unsustainable use of available water resources. In response to these pressing challenges, the Government of Iraq has initiated efforts to strengthen climate resilience and promote sustainable water resources management. However, it faces challenges in prioritizing and mobilizing the investments. In recognition of the urgent need for a climate-resilient approach to managing water resources in Iraq, the implementation of a new project has been agreed between the Federal Governments of Iraq and Germany. The German Federal Ministry for Economic Cooperation and Development (BMZ) commissioned GIZ to implement the "Climate-Resilient Water Resources Management (CWRM) project. CWRM started its activities in April 2025 and will probably end in September 2026. The project aims to strengthen the technical and institutional capacity of the Ministry of Water Resources for the climate-resilient management of the Hillah River. This project is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH with the Ministry of Water Resources (MoWR). Hillah River System has been designated as a pilot region for enhancing climate-resilient water resources management in Iraq. This vital watercourse, branches off from the Euphrates River, traverses the provinces of Babylon, Diwaniyah, and Muthanna, and is confronted with considerable challenges related to water allocation and distribution. Project approach: The project supports the ministry in the following areas: - Improvement of the Water Resources Information Systems (Output 1): Upgrading monitoring infrastructure, improving data management and sharing, and water quality and distribution tracking along the Hillah River. - Strengthening Methodological and Technical Capacities for Climate-Resilient Planning and Water Allocation (Output 2): Developing water accounting tool, and calibrated model to inform provincial water resources allocation. This also involves scenario modeling, artificial intellegence (AI) integration, and establishing governance frameworks for strategic decision-making. The project also supports planning, adaptation strategies, and long-term planning in response to climate change. - Capacity Development (Output 3): This cross-cutting theme focuses on building the capacity of the MoWR staff. It includes upgrading the MoWR training center, delivering trainings on climate-resilient water resources management, and facilitating participation in international conferences. Special emphasis is placed on promoting female specialists and managers within the ministry. - Reuse of Drainage Water (Output 4): Feasible options for reusing drainage water as an unconventional water resource will be identified through analysis of international, regional, and local experiences. The MoWR will be supported in assessing and prioritizing potential uses, and a bankable project proposal for a demonstration plant will be developed.

Deadline

Deadline 2026-06-09

Wer? Wie? Wo?
Geschichte der Beschaffung
Datum Dokument
2026-05-07 Auftragsbekanntmachung
Auftragsbekanntmachung (2026-05-07)
Objekt
Umfang der Beschaffung
Titel: 10000203 - Consultancy on Drainage Water Reuse
Referenznummer: 10000203
Kurze Beschreibung:
Iraq is facing an intensifying water crisis, driven by a combination of environmental and human-induced factors. Climate change impacts led to strain on water availability. A significant decline in Euphrates and Tigris Rivers discharge is further exacerbated by the transboundary water flow control by neighbouring countries, which severely restrict the volume of water reaching Iraq. Beyond water scarcity, inadequate and fragmented water resources management further aggravates the situation. Inefficient allocation practices, limited monitoring and planning capacities, and weak coordination between institutions contribute to unsustainable use of available water resources. In response to these pressing challenges, the Government of Iraq has initiated efforts to strengthen climate resilience and promote sustainable water resources management. However, it faces challenges in prioritizing and mobilizing the investments. In recognition of the urgent need for a climate-resilient approach to managing water resources in Iraq, the implementation of a new project has been agreed between the Federal Governments of Iraq and Germany. The German Federal Ministry for Economic Cooperation and Development (BMZ) commissioned GIZ to implement the "Climate-Resilient Water Resources Management (CWRM) project. CWRM started its activities in April 2025 and will probably end in September 2026. The project aims to strengthen the technical and institutional capacity of the Ministry of Water Resources for the climate-resilient management of the Hillah River. This project is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH with the Ministry of Water Resources (MoWR). Hillah River System has been designated as a pilot region for enhancing climate-resilient water resources management in Iraq. This vital watercourse, branches off from the Euphrates River, traverses the provinces of Babylon, Diwaniyah, and Muthanna, and is confronted with considerable challenges related to water allocation and distribution. Project approach: The project supports the ministry in the following areas: - Improvement of the Water Resources Information Systems (Output 1): Upgrading monitoring infrastructure, improving data management and sharing, and water quality and distribution tracking along the Hillah River. - Strengthening Methodological and Technical Capacities for Climate-Resilient Planning and Water Allocation (Output 2): Developing water accounting tool, and calibrated model to inform provincial water resources allocation. This also involves scenario modeling, artificial intellegence (AI) integration, and establishing governance frameworks for strategic decision-making. The project also supports planning, adaptation strategies, and long-term planning in response to climate change. - Capacity Development (Output 3): This cross-cutting theme focuses on building the capacity of the MoWR staff. It includes upgrading the MoWR training center, delivering trainings on climate-resilient water resources management, and facilitating participation in international conferences. Special emphasis is placed on promoting female specialists and managers within the ministry. - Reuse of Drainage Water (Output 4): Feasible options for reusing drainage water as an unconventional water resource will be identified through analysis of international, regional, and local experiences. The MoWR will be supported in assessing and prioritizing potential uses, and a bankable project proposal for a demonstration plant will be developed.
Mehr anzeigen
Art des Vertrags: Dienstleistungen
Produkte/Dienstleistungen: Wirtschaftshilfe an das Ausland 📦
Beschreibung
Interne Kennung: 10000203
Diese Auftragsvergabe ist auch für kleine und mittlere Unternehmen (KMU) geeignet
Beschreibung der Beschaffung:
The objective of this assignment is to support the Ministry of Water Resources in identifying and prioritising technically, environmentally, and economically feasible options for the reuse of drainage water in the Hillah River System and to prepare a concept for two pilot projects that can serve as a demonstration for future replication. The contractor is responsible for providing the following work packages and for achieving the corresponding milestones: Work package 1: Assessment of irrigation practices and drainage-water generation The contractor is responsible for conducting a comprehensive assessment of current irrigation systems and their relationship to drainage-water generation in the Hillah River System. This includes reviewing existing irrigation methods such as surface, sprinkler, and drip irrigation including the (efficient) use of fertilizer; quantifying irrigation efficiency and related drainage-water volumes and qualities; and analysing the institutional management of irrigation operations. The contractor shall perform a scenario analysis comparing current and improved irrigation and fertilizing practices and quantify how increased irrigation efficiency and better use of fertilizer would affect the volume and quality of drainage water. The analysis shall include different scenarios for climate adaptation measures. The results shall be visualised in maps and datasets to be included in the (designed) Information System with the Hillah River Information System (Outcome Indicator). Work package 2: Identification and prioritisation of reuse options and treatment technologies GIZ shall provide the contractor with a baseline assessment identifying feasible end-uses for treated drainage water, including agricultural reuse, aquaculture, industrial applications, landscape irrigation, and groundwater recharge. The baseline assessment will also include a review of relevant international and regional experiences (e.g. Jordan, Egypt, Iran, and FAO"s WaPOR programme) and initial lessons learned applicable to the Iraqi context. The contractor shall build upon and complete the baseline assessment provided by GIZ by validating and further developing the identified drainage water reuse options relevant to the Iraqi context. This includes assessing a range of conventional treatment technologies as well as nature-based solutions (NbS) suitable for high-salinity and contaminated drainage water in arid environments, using a multi-criteria approach that considers technical feasibility, operational requirements, costs, environmental risks, and institutional capacities. Different potential options (managerial, biological, physical, non-physical) should be discussed and presented in an "option report". The contractor shall ensure that MoWR and key institutions are engaged throughout the assessment process as part of a structured capacity development approach. As part of this process, the contractor shall facilitate targeted learning and exchange activities. These include the organisation of a study tour for MoWR to visit relevant international or regional good practices, as well as an international seminar or conference in Baghdad in which international and regional actors present their experiences and discuss their applicability to the Iraqi context. The contractor shall prepare a bilingual publication summarising these experiences and the insights obtained. In addition, the contractor shall design and deliver two training courses in close cooperation with the MoWR Training Center: (i) a foundational training course on treatment technologies for drainage water reuse, covering technical principles, performance, and operational aspects; and (ii) an advanced training course focusing specifically on drainage water reuse concepts and Nature-based Solutions (NbS), including design considerations, applicability in arid environments, and integration into water management planning. The consultant together with the GIZ team will support the MoWR in identifying 2 pilot projects to be implemented in the Hilla River area. Work package 3: Preparation of pilot project concepts Building on the findings of the previous work packages, the contractor shall support the development of a pre-fesibility (PFS) and a definitive feasibility study (DFS) for two pilot demonstration solutions. This task includes together with the GIZ team and the counterpart identifying suitable pilot locations based on hydrological, land-use, and environmental criteria; proposing a treatment and reuse scheme; and estimating costs and requirements, and potential financing options. The contractor shall analyze the financing criteria, eligibility requirements, and procedural steps of BMZ and EU co-financing instruments relevant to the implementation of pilot projects on drainage water reuse. Based on this analysis, the contractor shall develop and assess two distinct pilot project options: - a small-scale pilot project designed to comply with BMZ funding criteria, with an indicative financing volume of up to EUR 1 million (up to feasibility level); and - a larger-scale pilot project designed to comply with EU financing criteria, with an indicative financing volume of up to EUR 25 million (up to pre-feasibility level). For the implementation of these tasks, the tenderer is required to provide 4 core experts (1 team leader and 3 technical experts with a total of 330 expert days).
Mehr anzeigen
Zusätzliche Informationen: #Besonders auch geeignet für:other-sme#
Zusätzliche Produkte/Dienstleistungen: Ziel der strategischen Auftragsvergabe: Verringerung der Auswirkungen auf die Umwelt
See section 2.5 of the ToR.
Konzept zur Verringerung der Umweltauswirkungen: Klimaschutz
Gefördertes soziales Ziel: Gleichstellung der Geschlechter
Hauptstandort oder Erfüllungsort: Baghdad-Harlow, Baghdad Dist. 925
Postanschrift: Baghdad-Harlow
Postleitzahl: Baghdad Dist. 925
Stadt: Baghdad
Land: Irak 🇮🇶
Dauer: 12 Monate
Maximale Verlängerungen: 2
Weitere Informationen zur Verlängerung:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference. GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see section 7 of the terms of reference.
Mehr anzeigen
Informationen über Optionen
Optionen
Beschreibung der Optionen:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference. GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see section 7 of the terms of reference.
Mehr anzeigen
Vergabekriterien
Preis
Preis (Gewichtung): 30.00
Qualitätskriterium (Bezeichnung): Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.)
Qualitätskriterium (Gewichtung): 70.0000
500.00000000
Titel
Los-Identifikationsnummer: LOT-0001

Verfahren
Art des Verfahrens
Offenes Verfahren
Rechtsgrundlage: Richtlinie 2014/24/EU
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2026-06-09 12:00:00 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 113 Tage
Bedingungen für die Einreichung eines Angebots
Die Bieter können mehrere Angebote einreichen
Die Namen und beruflichen Qualifikationen des zur Auftragsausführung eingesetzten Personals sind anzugeben
Elektronische Rechnungsstellung: Erforderlich
Die elektronische Bestellung wird verwendet
Elektronische Zahlung wird verwendet
Frist für die Anforderung zusätzlicher Informationen: 2026-06-01 23:59:59 📅
Zusätzliche Informationen:
GIZ asks the applicant or bidder to submit, complete or correct documents, within the framework laid down by law.
Vergabekriterien
Gewichtungsart: Gewichtung (Punkte, genau)
Bedingungen für die Einreichung eines Angebots
Der Vertrag enthält Bedingungen zur Vertragsausführung

Rechtliche, wirtschaftliche, finanzielle und technische Informationen
Bedingungen für die Teilnahme
Eignungskriterium: Andere wirtschaftliche oder finanzielle Anforderungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligbility criteria are not from the same category as stipulated above, as there is no suitable category. 1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin. 2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG, EU-Russia sanctions 3. Declaration of bidding consortium and/or declaration of eligibility based on the capacities of other entities (if applicable)
Mehr anzeigen
Eignungskriterium: Referenzen zu bestimmten Dienstleistungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-B1: Technical and professional ability (Mit dem Angebot; Mittels Eigenerklärung): 1. The technical assessment is only based on reference projects with a minimum commission value of 150,000.00 EUR (net). 2. At least 1 reference project in the technical field of "Agriculture drainage water reuse" in the last 36 months and at least 1 reference project in the MENA Region from the technical field "Water resources management" in the last 36 months.
Mehr anzeigen
Eignungskriterium: Durchschnittlicher Jahresumsatz
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-C1: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 500,000.00 EUR (net).
Mehr anzeigen
EN-C2: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average number of employees and managers in the last three calendar years, at least 7 persons.
Bedingungen für den Vertrag
Bedingungen für die Vertragserfüllung:
The execution conditions result from the information given in the contract notice and the tender documents.
Bedingungen für die Teilnahme
Ausschlussgrund:
Beteiligung an einer kriminellen Vereinigung
Betrug
Der Zahlungsunfähigkeit vergleichbare Lage gemäß nationaler Rechtsvorschriften
+ 19 weitere
Direkte oder indirekte Beteiligung an der Vorbereitung des Vergabeverfahrens
Einstellung der gewerblichen Tätigkeit
Geldwäsche oder Terrorismusfinanzierung
Interessenkonflikt aufgrund seiner Teilnahme an dem Vergabeverfahren
Kinderarbeit und andere Formen des Menschenhandels
Korruption
Schwerwiegendes berufliches Fehlverhalten
Terroristische Straftaten oder Straftaten im Zusammenhang mit terroristischen Aktivitäten
Täuschung, Zurückhaltung von Informationen, Unfähigkeit zur Vorlage erforderlicher Unterlagen oder Erlangung vertraulicher Informationen zu dem Verfahren
Vereinbarungen mit anderen Wirtschaftsteilnehmern zur Verzerrung des Wettbewerbs
Verstoß gegen arbeitsrechtliche Verpflichtungen
Verstoß gegen die in den rein innerstaatlichen Ausschlussgründen verankerten Verpflichtungen
Verstoß gegen die Verpflichtung zur Entrichtung von Sozialversicherungsbeiträgen
Verstoß gegen die Verpflichtung zur Entrichtung von Steuern
Verstoß gegen sozialrechtliche Verpflichtungen
Verstoß gegen umweltrechtliche Verpflichtungen
Verwaltung der Vermögenswerte durch einen Insolvenzverwalter
Vorzeitige Beendigung, Schadensersatz oder andere vergleichbare Sanktionen
Zahlungsunfähigkeit
Beschreibung der Ausschlussgründe: In accordance with §§ 123,124 GWB, § 22 LkSG

Öffentlicher Auftraggeber
Name und Adressen
Name: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Nationale Registrierungsnummer: 993-80072-52
Postanschrift: Dag-Hammarskjöld-Weg 1 - 5
Postleitzahl: 65760
Postort: Eschborn
Region: Main-Taunus-Kreis 🏙️
Land: Deutschland 🇩🇪
E-Mail: vahram.hovhannisyan@giz.de 📧
Telefon: +49 6196792710 📞
Fax: +49 6196791115 📠
URL: https://www.giz.de 🌏
Art des öffentlichen Auftraggebers
Einrichtung des öffentlichen Rechts
Haupttätigkeit
Allgemeine öffentliche Verwaltung
Kommunikation
Dokumente URL: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTVYDAW8S/documents 🌏
Teilnahme-URL: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTVYDAW8S 🌏
URL des Beschaffungsinstruments: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTVYDAW8S 🌏
Elektronische Einreichung: Erforderlich

Ergänzende Informationen
Zusätzliche Informationen
#Bekanntmachungs-ID: CXTRYY6YTVYDAW8S# All communication takes place in English via communication tool in the project area of the procurement portal.
Körper überprüfen
Name: Vergabekammern des Bundes
Nationale Registrierungsnummer: 022894990
Postanschrift: Kaiser-Friedrich-Straße 16
Postleitzahl: 53113
Postort: Bonn
Region: Bonn, Kreisfreie Stadt 🏙️
Land: Deutschland 🇩🇪
E-Mail: vk@bundeskartellamt.bund.de 📧
Telefon: +49 2289499-0 📞
Fax: +49 2289499-163 📠
URL: https://www.bundeskartellamt.de 🌏
Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as 1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected, 2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice. 3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids, 4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint. Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Mehr anzeigen
Informationen über elektronische Arbeitsabläufe
Die elektronische Rechnungsstellung wird akzeptiert
Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2026-05-07+02:00 📅
Quelle: OJS 2026/S 090-321894 (2026-05-07)