The project Mobilité Verte au Sénégal (MoVe Senegal) is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, in partnership with the Senegalese Ministry of Land and Air Transports, (MiTTA) which is the political counterpart, and the Executive Council for Sustainable Urban Transportation (CETUD) being the implementing partner. MoVe Senegal is commissioned by the German Federal Ministry for Economic Cooperation and Development (BMZ). The project is part of the development cooperation programme "Sustainable Energy Supply and Urban Development in Senegal", which aims to make cities sustainable, climate-neutral, resilient and liveable. MoVe Senegal is in line with Senegal National Development Strategy 2025-2029, which is a strategy for implementing its Vision 2050. Senegal's climate protection targets, set out in the Nationally Determined Contributions (NDCs), provide for a reduction in greenhouse gas emissions by 23% and 29% (subject to external support) by 2030. In Senegal, the transport sector accounts for 64% of fossil fuel consumption and thus also the largest share of the associated greenhouse gas emissions. The majority of transport demand is generated in the Dakar metropolitan area with 3.9 million inhabitants. According to forecasts from the city"s Sustainable Urban Mobility Plan (Plan de Mobilité Urbaine Durable, PMUD), transport demand in the centre of Dakar will increase by 40% by 2035. On the outskirts, demand is expected to increase fivefold compared to 2019. In Dakar, 69% of journeys are made on foot. However, pedestrians face considerable dangers because sidewalks and crossings are often poorly planned, dilapidated, or non-existent. Over 60% of road users complain about the lack of sidewalks or their obstruction by parked cars, mobile traders, shops, and informal public transport stops. Only around 1% of journeys in Dakar are made by bicycle, despite its widespread use in other cities in the country. The lack of infrastructure, disregard for traffic rules by motorists, high risk of bicycle theft, and obstructions caused by parking and stalls make cycling extremely dangerous in Dakar. 90% of men, but only 36% of women, can ride a bicycle and only 15% of the residents have a bicycle. Overall, the city lacks a coherent strategy for active modes of transport that aims to integrate walking and cycling into the urban transport system. Therefore, project"s primary objective is to anchor active mobility as an integral component of transport planning in the Dakar metropolitan region. It is structured in 3 outputs: - Output 1 focuses on strategies and coordination. Within this output a Steering Committee for Active Mobility will be supported, a strategy for walking and cycling will be prepared and action plans for the improvement of active mobility in the Dakar Metropolitan Region will be developed. - Output 2 aims to strengthen the technical competences of technical experts to improve pedestrian access to public transport in the Dakar metropolitan region. In this output a Green Corridor to improve pedestrian access to public transport will be prepared with the public administrations of the Dakar metropolitan region, based on a participation process. - Output 3 focuses on increasing the use of bicycles among pupils and students in the Dakar metropolitan region. To this end, a bike sharing system will be developed on the campus of the Université Cheikh Anta Diop de Dakar (UCAD) together with CETUD and the university administration. This includes the identification of a suitable business model, the implementing of the bike sharing system and the development of plans to connect the campus to the public transport system using active modes.
Auftragsbekanntmachung (2026-07-21) Objekt Umfang der Beschaffung
Titel: 10015490-Development of a green corridor project and street design training in Dakar
Referenznummer: 10015490
Kurze Beschreibung:
The project Mobilité Verte au Sénégal (MoVe Senegal) is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, in partnership with the Senegalese Ministry of Land and Air Transports, (MiTTA) which is the political counterpart, and the Executive Council for Sustainable Urban Transportation (CETUD) being the implementing partner. MoVe Senegal is commissioned by the German Federal Ministry for Economic Cooperation and Development (BMZ). The project is part of the development cooperation programme "Sustainable Energy Supply and Urban Development in Senegal", which aims to make cities sustainable, climate-neutral, resilient and liveable.
MoVe Senegal is in line with Senegal National Development Strategy 2025-2029, which is a strategy for implementing its Vision 2050. Senegal's climate protection targets, set out in the Nationally Determined Contributions (NDCs), provide for a reduction in greenhouse gas emissions by 23% and 29% (subject to external support) by 2030.
In Senegal, the transport sector accounts for 64% of fossil fuel consumption and thus also the largest share of the associated greenhouse gas emissions. The majority of transport demand is generated in the Dakar metropolitan area with 3.9 million inhabitants. According to forecasts from the city"s Sustainable Urban Mobility Plan (Plan de Mobilité Urbaine Durable, PMUD), transport demand in the centre of Dakar will increase by 40% by 2035. On the outskirts, demand is expected to increase fivefold compared to 2019.
In Dakar, 69% of journeys are made on foot. However, pedestrians face considerable dangers because sidewalks and crossings are often poorly planned, dilapidated, or non-existent. Over 60% of road users complain about the lack of sidewalks or their obstruction by parked cars, mobile traders, shops, and informal public transport stops.
Only around 1% of journeys in Dakar are made by bicycle, despite its widespread use in other cities in the country. The lack of infrastructure, disregard for traffic rules by motorists, high risk of bicycle theft, and obstructions caused by parking and stalls make cycling extremely dangerous in Dakar. 90% of men, but only 36% of women, can ride a bicycle and only 15% of the residents have a bicycle.
Overall, the city lacks a coherent strategy for active modes of transport that aims to integrate walking and cycling into the urban transport system. Therefore, project"s primary objective is to anchor active mobility as an integral component of transport planning in the Dakar metropolitan region. It is structured in 3 outputs:
- Output 1 focuses on strategies and coordination. Within this output a Steering Committee for Active Mobility will be supported, a strategy for walking and cycling will be prepared and action plans for the improvement of active mobility in the Dakar Metropolitan Region will be developed.
- Output 2 aims to strengthen the technical competences of technical experts to improve pedestrian access to public transport in the Dakar metropolitan region. In this output a Green Corridor to improve pedestrian access to public transport will be prepared with the public administrations of the Dakar metropolitan region, based on a participation process.
- Output 3 focuses on increasing the use of bicycles among pupils and students in the Dakar metropolitan region. To this end, a bike sharing system will be developed on the campus of the Université Cheikh Anta Diop de Dakar (UCAD) together with CETUD and the university administration. This includes the identification of a suitable business model, the implementing of the bike sharing system and the development of plans to connect the campus to the public transport system using active modes.
The project Mobilité Verte au Sénégal (MoVe Senegal) is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, in partnership with the Senegalese Ministry of Land and Air Transports, (MiTTA) which is the political counterpart, and the Executive Council for Sustainable Urban Transportation (CETUD) being the implementing partner. MoVe Senegal is commissioned by the German Federal Ministry for Economic Cooperation and Development (BMZ). The project is part of the development cooperation programme "Sustainable Energy Supply and Urban Development in Senegal", which aims to make cities sustainable, climate-neutral, resilient and liveable.
MoVe Senegal is in line with Senegal National Development Strategy 2025-2029, which is a strategy for implementing its Vision 2050. Senegal's climate protection targets, set out in the Nationally Determined Contributions (NDCs), provide for a reduction in greenhouse gas emissions by 23% and 29% (subject to external support) by 2030.
In Senegal, the transport sector accounts for 64% of fossil fuel consumption and thus also the largest share of the associated greenhouse gas emissions. The majority of transport demand is generated in the Dakar metropolitan area with 3.9 million inhabitants. According to forecasts from the city"s Sustainable Urban Mobility Plan (Plan de Mobilité Urbaine Durable, PMUD), transport demand in the centre of Dakar will increase by 40% by 2035. On the outskirts, demand is expected to increase fivefold compared to 2019.
In Dakar, 69% of journeys are made on foot. However, pedestrians face considerable dangers because sidewalks and crossings are often poorly planned, dilapidated, or non-existent. Over 60% of road users complain about the lack of sidewalks or their obstruction by parked cars, mobile traders, shops, and informal public transport stops.
Only around 1% of journeys in Dakar are made by bicycle, despite its widespread use in other cities in the country. The lack of infrastructure, disregard for traffic rules by motorists, high risk of bicycle theft, and obstructions caused by parking and stalls make cycling extremely dangerous in Dakar. 90% of men, but only 36% of women, can ride a bicycle and only 15% of the residents have a bicycle.
Overall, the city lacks a coherent strategy for active modes of transport that aims to integrate walking and cycling into the urban transport system. Therefore, project"s primary objective is to anchor active mobility as an integral component of transport planning in the Dakar metropolitan region. It is structured in 3 outputs:
- Output 1 focuses on strategies and coordination. Within this output a Steering Committee for Active Mobility will be supported, a strategy for walking and cycling will be prepared and action plans for the improvement of active mobility in the Dakar Metropolitan Region will be developed.
- Output 2 aims to strengthen the technical competences of technical experts to improve pedestrian access to public transport in the Dakar metropolitan region. In this output a Green Corridor to improve pedestrian access to public transport will be prepared with the public administrations of the Dakar metropolitan region, based on a participation process.
- Output 3 focuses on increasing the use of bicycles among pupils and students in the Dakar metropolitan region. To this end, a bike sharing system will be developed on the campus of the Université Cheikh Anta Diop de Dakar (UCAD) together with CETUD and the university administration. This includes the identification of a suitable business model, the implementing of the bike sharing system and the development of plans to connect the campus to the public transport system using active modes.
Art des Vertrags: Dienstleistungen
Produkte/Dienstleistungen: Umweltplanung📦 Beschreibung
Interne Kennung: 10015490
Diese Auftragsvergabe ist auch für kleine und mittlere Unternehmen (KMU) geeignet ✅
Beschreibung der Beschaffung:
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar.
WP1 Baseline study
- Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements).
- Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples).
- Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media.
WP2 Participation process
- Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities).
- Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results.
- Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication.
WP3 Pre-feasibility Study (PFS) Green Corridor
- Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations.
- Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes).
- Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources.
- Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck.
- Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted).
- Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan.
WP4 Training conceptualisation and implementation
- Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements.
- Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot.
- Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned.
- Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report.
Governance and cooperation
- Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment.
- Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days).
- Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness.
Reporting and languages
- Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified.
Indicative duration and milestones (from contract start)
- WP1: D1.1 at 1 month; D1.2-1.4 at 3 months.
- WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months.
- WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months.
- WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar.
WP1 Baseline study
- Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements).
- Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples).
- Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media.
WP2 Participation process
- Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities).
- Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results.
- Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication.
WP3 Pre-feasibility Study (PFS) Green Corridor
- Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations.
- Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes).
- Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources.
- Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck.
- Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted).
- Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan.
WP4 Training conceptualisation and implementation
- Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements.
- Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot.
- Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned.
- Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report.
Governance and cooperation
- Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment.
- Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days).
- Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness.
Reporting and languages
- Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified.
Indicative duration and milestones (from contract start)
- WP1: D1.1 at 1 month; D1.2-1.4 at 3 months.
- WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months.
- WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months.
- WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.
Zusätzliche Informationen:
#Besonders auch geeignet für:selbst#, #Besonders auch geeignet für:startup#, #Besonders auch geeignet für:other-sme#
Ziel der strategischen Auftragsvergabe: Verringerung der Auswirkungen auf die Umwelt
see tender documents
Konzept zur Verringerung der Umweltauswirkungen: Der Schutz und Wiederherstellung der Biodiversität und der Ökosysteme
Gefördertes soziales Ziel: Gleichstellung von ethnischen Gruppen
Hauptstandort oder Erfüllungsort: see tender documents
Land: Senegal 🇸🇳
Dauer: 12 Monate
Maximale Verlängerungen: 2
Weitere Informationen zur Verlängerung:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Titel
Los-Identifikationsnummer: LOT-0001
Verfahren Art des Verfahrens
Offenes Verfahren ✅
Rechtsgrundlage: Richtlinie 2014/24/EU
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2026-08-21 12:00:00 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 131 Tage Bedingungen für die Einreichung eines Angebots
Die Bieter können mehrere Angebote einreichen
Elektronische Rechnungsstellung: Erforderlich
Die elektronische Bestellung wird verwendet ✅
Elektronische Zahlung wird verwendet ✅
Frist für die Anforderung zusätzlicher Informationen: 2026-08-13 23:59:59 📅
Zusätzliche Informationen:
GIZ asks the applicant or bidder to submit, complete or correct documents, within the framework laid down by law.
Der Vertrag enthält Bedingungen zur Vertragsausführung ✅
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Eignungskriterium: Andere wirtschaftliche oder finanzielle Anforderungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligbility criteria are not from the same category as stipulated above, as there is no suitable category.
1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin.
2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG, EU-Russia sanctions
3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Liste und kurze Beschreibung der Regeln und Kriterien
EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligbility criteria are not from the same category as stipulated above, as there is no suitable category.
1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin.
2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG, EU-Russia sanctions
3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Eignungskriterium: Referenzen zu bestimmten Dienstleistungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-B1: Technical and professional ability (Mit dem Angebot; Mittels Eigenerklärung): 1. The technical assessment is only based on reference projects with a minimum commission value of EUR 150,000.00 (net).
2.
At least 3 references in the technical field of technical and economic (pre-)feasibility studies of street & urban space design projects in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
At least 2 references in the technical field of participatory processes in the context of urban mobility or urban development planning (comprising citizen involvement / comprehensive stakeholder engagement and management in urban planning processes or infrastructure project development) in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
At least 2 references in the technical field of training course development in urban mobility or urban development in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
Of all those references, at least 3 references adressing significantly one or more of the following aspects: 1) gender-sensitive planning, 2) inclusion of people with disabilities, 3) climate resilience in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
Of all those references, at least 2 references in Western or Middle Africa (According to UN-DESA Statistics Division standard country or area codes for statistical use (M49)) in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
Liste und kurze Beschreibung der Regeln und Kriterien
EN-B1: Technical and professional ability (Mit dem Angebot; Mittels Eigenerklärung): 1. The technical assessment is only based on reference projects with a minimum commission value of EUR 150,000.00 (net).
2.
At least 3 references in the technical field of technical and economic (pre-)feasibility studies of street & urban space design projects in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
At least 2 references in the technical field of participatory processes in the context of urban mobility or urban development planning (comprising citizen involvement / comprehensive stakeholder engagement and management in urban planning processes or infrastructure project development) in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
At least 2 references in the technical field of training course development in urban mobility or urban development in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
Of all those references, at least 3 references adressing significantly one or more of the following aspects: 1) gender-sensitive planning, 2) inclusion of people with disabilities, 3) climate resilience in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
Of all those references, at least 2 references in Western or Middle Africa (According to UN-DESA Statistics Division standard country or area codes for statistical use (M49)) in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 150,000.00 (net) (exclusion criterion).
Eignungskriterium: Durchschnittlicher Jahresumsatz
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-C1: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: EUR 900,000.00 (net).
Liste und kurze Beschreibung der Regeln und Kriterien
EN-C1: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: EUR 900,000.00 (net).
EN-C2: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average number of employees and managers in the last three calendar years, at least 10 persons.
Bedingungen für den Vertrag
Bedingungen für die Vertragserfüllung:
The execution conditions result from the information given in the contract notice and the tender documents.
Bedingungen für die Teilnahme
Ausschlussgrund:
Beteiligung an einer kriminellen Vereinigung
Betrug
Der Zahlungsunfähigkeit vergleichbare Lage gemäß nationaler Rechtsvorschriften
+ 19 weitere
Direkte oder indirekte Beteiligung an der Vorbereitung des Vergabeverfahrens
Einstellung der gewerblichen Tätigkeit
Geldwäsche oder Terrorismusfinanzierung
Interessenkonflikt aufgrund seiner Teilnahme an dem Vergabeverfahren
Kinderarbeit und andere Formen des Menschenhandels
Korruption
Schwerwiegendes berufliches Fehlverhalten
Terroristische Straftaten oder Straftaten im Zusammenhang mit terroristischen Aktivitäten
Täuschung, Zurückhaltung von Informationen, Unfähigkeit zur Vorlage erforderlicher Unterlagen oder Erlangung vertraulicher Informationen zu dem Verfahren
Vereinbarungen mit anderen Wirtschaftsteilnehmern zur Verzerrung des Wettbewerbs
Verstoß gegen arbeitsrechtliche Verpflichtungen
Verstoß gegen die in den rein innerstaatlichen Ausschlussgründen verankerten Verpflichtungen
Verstoß gegen die Verpflichtung zur Entrichtung von Sozialversicherungsbeiträgen
Verstoß gegen die Verpflichtung zur Entrichtung von Steuern
Verstoß gegen sozialrechtliche Verpflichtungen
Verstoß gegen umweltrechtliche Verpflichtungen
Verwaltung der Vermögenswerte durch einen Insolvenzverwalter
Vorzeitige Beendigung, Schadensersatz oder andere vergleichbare Sanktionen
Zahlungsunfähigkeit
Beschreibung der Ausschlussgründe: In accordance with §§ 123,124 GWB, § 22 LkSG
#Bekanntmachungs-ID: CXTRYY6YTTY3D4ZM#
All communication takes place in English via communication tool in the project area of the procurement portal.
Körper überprüfen
Name: Vergabekammern des Bundes
Nationale Registrierungsnummer: 022894990
Postanschrift: Kaiser-Friedrich-Straße 16
Postleitzahl: 53113
Postort: Bonn
Region: Bonn, Kreisfreie Stadt
🏙️
Land: Deutschland 🇩🇪
E-Mail: vk@bundeskartellamt.bund.de📧
Telefon: +49 2289499-0📞
Fax: +49 2289499-163 📠
URL: https://www.bundeskartellamt.de🌏 Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Informationen über elektronische Arbeitsabläufe
Die elektronische Rechnungsstellung wird akzeptiert
Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2026-07-21+02:00 📅
Quelle: OJS 2026/S 139-507269 (2026-07-21)