Description of project: Lesotho faces significant socio-economic challenges, including poverty, unemployment, food insecurity, and high HIV/AIDS prevalence. Thanks to its geographical location, Lesotho - the "Water Tower" of Southern Africa - plays a critical role in regional water security, supplying water to South Africa, with additional regional transfer schemes under consideration. Protecting and sustainably managing Lesotho"s water resources is therefore a national and regional priority. However, Lesotho"s catchments have been heavily degraded due to settlement in sensitive areas, overgrazing and unsustainable land use, causing erosion, soil fertility loss, sedimentation and hydrological instability. Climate change intensifies these impacts with erratic rainfall, floods and droughts. Despite numerous sustainable natural resource management efforts over the past 50 years, impacts and sustainability have often fallen short, largely due to insufficient coordination among ministries and institutions. Strengthened cooperation, knowledge and data sharing, and aligned action among key actors at national, river basin, and SADC levels are essential. Against this backdrop, the Government of Lesotho, supported by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ), has launched ReNOKA, a national Integrated Catchment Management (ICM) programme. ReNOKA aims to restore and sustainably manage Lesotho"s catchments-critical for water, land, energy, and food security across the Orange-Senqu basin and the Gauteng economic hub. For the continued support to ReNOKA, GIZ has been commissioned to implement the "Support to ReNOKA" joint action funded under the EU Multi-Donor Action "Metsi a Lesotho" and the BMZ-funded "Transboundary Water Management in the SADC Region" (TWM) project. The overall objective of "Metsi a Lesotho" is to "ensure access to sustainable water and sanitation for all as a means for green and resilient growth and promoting peace and security in Lesotho and the region". The specific objectives are: - Specific Objective 2: "Lesotho sustainably manages its water and land resources comprising the water-energy-natural resources nexus and advances its climate resilience with an inclusive approach" - Specific Objective 3: "Capacities of national water institutions to improve services and cooperation at community, catchment and transboundary levels are strengthened". To achieve these objectives, the Action will deliver five interlinked outputs, with the following output being relevant to this service: - Output 3.1: Enhancement of capacities of government staff for sustainable water management. Despite earlier support that improved technical water management, coordination and communication across key institutions-from the Prime Minister"s Office to community authorities-remain weak. To address this, GIZ intends to contract a service provider to implement Output 3.1 by applying the Problem-Driven Iterative Adaptation (PDIA) approach in the water sector in Lesotho to address the underlying complex challenges and bottlenecks that hinder effective cooperation.
Auftragsbekanntmachung (2026-08-03) Objekt Umfang der Beschaffung
Titel: 10025199-Applying the Problem-Driven Iterative Adaptation approach to strenghten governance in the water sector in Lesotho
Referenznummer: 10025199
Kurze Beschreibung:
Description of project:
Lesotho faces significant socio-economic challenges, including poverty, unemployment, food insecurity, and high HIV/AIDS prevalence. Thanks to its geographical location, Lesotho - the "Water Tower" of Southern Africa - plays a critical role in regional water security, supplying water to South Africa, with additional regional transfer schemes under consideration. Protecting and sustainably managing Lesotho"s water resources is therefore a national and regional priority.
However, Lesotho"s catchments have been heavily degraded due to settlement in sensitive areas, overgrazing and unsustainable land use, causing erosion, soil fertility loss, sedimentation and hydrological instability. Climate change intensifies these impacts with erratic rainfall, floods and droughts. Despite numerous sustainable natural resource management efforts over the past 50 years, impacts and sustainability have often fallen short, largely due to insufficient coordination among ministries and institutions. Strengthened cooperation, knowledge and data sharing, and aligned action among key actors at national, river basin, and SADC levels are essential.
Against this backdrop, the Government of Lesotho, supported by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ), has launched ReNOKA, a national Integrated Catchment Management (ICM) programme. ReNOKA aims to restore and sustainably manage Lesotho"s catchments-critical for water, land, energy, and food security across the Orange-Senqu basin and the Gauteng economic hub. For the continued support to ReNOKA, GIZ has been commissioned to implement the "Support to ReNOKA" joint action funded under the EU Multi-Donor Action "Metsi a Lesotho" and the BMZ-funded "Transboundary Water Management in the SADC Region" (TWM) project.
The overall objective of "Metsi a Lesotho" is to "ensure access to sustainable water and sanitation for all as a means for green and resilient growth and promoting peace and security in Lesotho and the region". The specific objectives are:
- Specific Objective 2: "Lesotho sustainably manages its water and land resources comprising the water-energy-natural resources nexus and advances its climate resilience with an inclusive approach"
- Specific Objective 3: "Capacities of national water institutions to improve services and cooperation at community, catchment and transboundary levels are strengthened".
To achieve these objectives, the Action will deliver five interlinked outputs, with the following output being relevant to this service:
- Output 3.1: Enhancement of capacities of government staff for sustainable water management.
Despite earlier support that improved technical water management, coordination and communication across key institutions-from the Prime Minister"s Office to community authorities-remain weak. To address this, GIZ intends to contract a service provider to implement Output 3.1 by applying the Problem-Driven Iterative Adaptation (PDIA) approach in the water sector in Lesotho to address the underlying complex challenges and bottlenecks that hinder effective cooperation.
Description of project:
Lesotho faces significant socio-economic challenges, including poverty, unemployment, food insecurity, and high HIV/AIDS prevalence. Thanks to its geographical location, Lesotho - the "Water Tower" of Southern Africa - plays a critical role in regional water security, supplying water to South Africa, with additional regional transfer schemes under consideration. Protecting and sustainably managing Lesotho"s water resources is therefore a national and regional priority.
However, Lesotho"s catchments have been heavily degraded due to settlement in sensitive areas, overgrazing and unsustainable land use, causing erosion, soil fertility loss, sedimentation and hydrological instability. Climate change intensifies these impacts with erratic rainfall, floods and droughts. Despite numerous sustainable natural resource management efforts over the past 50 years, impacts and sustainability have often fallen short, largely due to insufficient coordination among ministries and institutions. Strengthened cooperation, knowledge and data sharing, and aligned action among key actors at national, river basin, and SADC levels are essential.
Against this backdrop, the Government of Lesotho, supported by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ), has launched ReNOKA, a national Integrated Catchment Management (ICM) programme. ReNOKA aims to restore and sustainably manage Lesotho"s catchments-critical for water, land, energy, and food security across the Orange-Senqu basin and the Gauteng economic hub. For the continued support to ReNOKA, GIZ has been commissioned to implement the "Support to ReNOKA" joint action funded under the EU Multi-Donor Action "Metsi a Lesotho" and the BMZ-funded "Transboundary Water Management in the SADC Region" (TWM) project.
The overall objective of "Metsi a Lesotho" is to "ensure access to sustainable water and sanitation for all as a means for green and resilient growth and promoting peace and security in Lesotho and the region". The specific objectives are:
- Specific Objective 2: "Lesotho sustainably manages its water and land resources comprising the water-energy-natural resources nexus and advances its climate resilience with an inclusive approach"
- Specific Objective 3: "Capacities of national water institutions to improve services and cooperation at community, catchment and transboundary levels are strengthened".
To achieve these objectives, the Action will deliver five interlinked outputs, with the following output being relevant to this service:
- Output 3.1: Enhancement of capacities of government staff for sustainable water management.
Despite earlier support that improved technical water management, coordination and communication across key institutions-from the Prime Minister"s Office to community authorities-remain weak. To address this, GIZ intends to contract a service provider to implement Output 3.1 by applying the Problem-Driven Iterative Adaptation (PDIA) approach in the water sector in Lesotho to address the underlying complex challenges and bottlenecks that hinder effective cooperation.
Art des Vertrags: Dienstleistungen
Produkte/Dienstleistungen: Wirtschaftshilfe an das Ausland📦 Beschreibung
Interne Kennung: 10025199
Diese Auftragsvergabe ist auch für kleine und mittlere Unternehmen (KMU) geeignet ✅
Beschreibung der Beschaffung:
Desription of required services:
This tendered assignment contributes to BMZ-funded TWM"s overall objective of improving transboundary, climate-resilient water management in Southern Africa, with a focus on sustainable, high-performing governance structures. It also supports the specific objective of the "Support to ReNOKA" joint action to strengthen national water sector capacities to improve services and cooperation at community, catchment, and transboundary levels-specifically Output 3.1.
The contractor shall be responsible for achieving the expected results of Output 3.1. of the "Support to ReNOKA".
Output 3.1. Enhancement of capacities of government staff for sustainable water management.
The objective focuses on strengthening individual and institutional capacities and collaboration for more sustainable water management in Lesotho. Using participatory methods, cooperation among Output 3.1 implementing partners, the Commission of Water as the lead implementing partner for Output 3, key institutions (e.g., the National ICM Coordination Unit) and stakeholders at national, River Basin Organisations, and SADC levels, is enhanced.
Key activities for Output 3.1.
- Develop a PDIA implementation plan and identify the core team.
- Identify and analyse core problems in the water sector.
- Conduct root cause analysis for selected problems.
- Identify entry points and define the sequencing to tackle various causes.
- Design and implement iterative "small bets", including structured learning cycles after each iteration.
- Document quick wins and lessons learned, including closure notes where problems are resolved.
- Implement an exit and handover process to responsible institutions to ensure sustainability.
Most of the assignment will be carried out in Maseru, Lesotho, with only a small portion of services by the team leader delivered from their home bases. Only a limited number of trips by the core experts within Lesotho will be required.
Desription of required services:
This tendered assignment contributes to BMZ-funded TWM"s overall objective of improving transboundary, climate-resilient water management in Southern Africa, with a focus on sustainable, high-performing governance structures. It also supports the specific objective of the "Support to ReNOKA" joint action to strengthen national water sector capacities to improve services and cooperation at community, catchment, and transboundary levels-specifically Output 3.1.
The contractor shall be responsible for achieving the expected results of Output 3.1. of the "Support to ReNOKA".
Output 3.1. Enhancement of capacities of government staff for sustainable water management.
The objective focuses on strengthening individual and institutional capacities and collaboration for more sustainable water management in Lesotho. Using participatory methods, cooperation among Output 3.1 implementing partners, the Commission of Water as the lead implementing partner for Output 3, key institutions (e.g., the National ICM Coordination Unit) and stakeholders at national, River Basin Organisations, and SADC levels, is enhanced.
Key activities for Output 3.1.
- Develop a PDIA implementation plan and identify the core team.
- Identify and analyse core problems in the water sector.
- Conduct root cause analysis for selected problems.
- Identify entry points and define the sequencing to tackle various causes.
- Design and implement iterative "small bets", including structured learning cycles after each iteration.
- Document quick wins and lessons learned, including closure notes where problems are resolved.
- Implement an exit and handover process to responsible institutions to ensure sustainability.
Most of the assignment will be carried out in Maseru, Lesotho, with only a small portion of services by the team leader delivered from their home bases. Only a limited number of trips by the core experts within Lesotho will be required.
Zusätzliche Informationen: #Besonders auch geeignet für:other-sme#
Zusätzliche Produkte/Dienstleistungen: Beratungsdienste im Bereich Wirtschaftsförderung📦
Ziel der strategischen Auftragsvergabe: Verringerung der Auswirkungen auf die Umwelt
refer to tender documents
Konzept zur Verringerung der Umweltauswirkungen: Der Übergang zu einer Kreislaufwirtschaft
Gefördertes soziales Ziel: Gleichstellung von ethnischen Gruppen
Hauptstandort oder Erfüllungsort: See tender documents
Land: Lesotho 🇱🇸
Dauer: 36 Monate
Maximale Verlängerungen: 2
Weitere Informationen zur Verlängerung:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Informationen über Optionen
Optionen ✅
Beschreibung der Optionen:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Titel
Los-Identifikationsnummer: LOT-0001
Verfahren Art des Verfahrens
Offenes Verfahren ✅
Rechtsgrundlage: Richtlinie 2014/24/EU
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2026-09-07 12:00:00 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 115 Tage Bedingungen für die Einreichung eines Angebots
Die Bieter können mehrere Angebote einreichen
Elektronische Rechnungsstellung: Erforderlich
Die elektronische Bestellung wird verwendet ✅
Elektronische Zahlung wird verwendet ✅
Frist für die Anforderung zusätzlicher Informationen: 2026-08-26 23:59:59 📅
Zusätzliche Informationen:
GIZ asks the applicant or bidder to submit, complete or correct documents, within the framework laid down by law.
Der Vertrag enthält Bedingungen zur Vertragsausführung ✅
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Eignungskriterium: Andere wirtschaftliche oder finanzielle Anforderungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligbility criteria are not from the same category as stipulated above, as there is no suitable category.
1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin.
2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG, EU-Russia sanctions
3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Liste und kurze Beschreibung der Regeln und Kriterien
EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligbility criteria are not from the same category as stipulated above, as there is no suitable category.
1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin.
2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG, EU-Russia sanctions
3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Eignungskriterium: Referenzen zu bestimmten Dienstleistungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-B1: Technical and professional ability (Mit dem Angebot; Mittels Eigenerklärung): 1. The technical assessment is only based on reference projects with a minimum commission value of 50,000 EUR (net, in words: fifty thousand euros).
2. At least 2 reference projects in the technical field "using participatory governance approaches in the water sector" and at least 1 reference project in any of the following countries: Angola, Botswana, Comoros, Democratic Republic of the Congo, Eswatini, Lesotho, Madagascar, Malawi, Mauritius, Mozambique, Namibia, Seychelles, South Africa, Tanzania, Zambia, Zimbabwe;
all of which in the last 36 months
Liste und kurze Beschreibung der Regeln und Kriterien
EN-B1: Technical and professional ability (Mit dem Angebot; Mittels Eigenerklärung): 1. The technical assessment is only based on reference projects with a minimum commission value of 50,000 EUR (net, in words: fifty thousand euros).
2. At least 2 reference projects in the technical field "using participatory governance approaches in the water sector" and at least 1 reference project in any of the following countries: Angola, Botswana, Comoros, Democratic Republic of the Congo, Eswatini, Lesotho, Madagascar, Malawi, Mauritius, Mozambique, Namibia, Seychelles, South Africa, Tanzania, Zambia, Zimbabwe;
all of which in the last 36 months
Eignungskriterium: Durchschnittlicher Jahresumsatz
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-C1: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 1,3 million EUR (net, in words: one point three million euros).
Liste und kurze Beschreibung der Regeln und Kriterien
EN-C1: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 1,3 million EUR (net, in words: one point three million euros).
EN-C2: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average number of employees and managers in the last three calendar years, at least 30 persons.
Bedingungen für den Vertrag
Bedingungen für die Vertragserfüllung:
The execution conditions result from the information given in the contract notice and the tender documents.
Bedingungen für die Teilnahme
Ausschlussgrund:
Beteiligung an einer kriminellen Vereinigung
Betrug
Der Zahlungsunfähigkeit vergleichbare Lage gemäß nationaler Rechtsvorschriften
+ 19 weitere
Direkte oder indirekte Beteiligung an der Vorbereitung des Vergabeverfahrens
Einstellung der gewerblichen Tätigkeit
Geldwäsche oder Terrorismusfinanzierung
Interessenkonflikt aufgrund seiner Teilnahme an dem Vergabeverfahren
Kinderarbeit und andere Formen des Menschenhandels
Korruption
Schwerwiegendes berufliches Fehlverhalten
Terroristische Straftaten oder Straftaten im Zusammenhang mit terroristischen Aktivitäten
Täuschung, Zurückhaltung von Informationen, Unfähigkeit zur Vorlage erforderlicher Unterlagen oder Erlangung vertraulicher Informationen zu dem Verfahren
Vereinbarungen mit anderen Wirtschaftsteilnehmern zur Verzerrung des Wettbewerbs
Verstoß gegen arbeitsrechtliche Verpflichtungen
Verstoß gegen die in den rein innerstaatlichen Ausschlussgründen verankerten Verpflichtungen
Verstoß gegen die Verpflichtung zur Entrichtung von Sozialversicherungsbeiträgen
Verstoß gegen die Verpflichtung zur Entrichtung von Steuern
Verstoß gegen sozialrechtliche Verpflichtungen
Verstoß gegen umweltrechtliche Verpflichtungen
Verwaltung der Vermögenswerte durch einen Insolvenzverwalter
Vorzeitige Beendigung, Schadensersatz oder andere vergleichbare Sanktionen
Zahlungsunfähigkeit
Beschreibung der Ausschlussgründe: In accordance with §§ 123,124 GWB, § 22 LkSG
#Bekanntmachungs-ID: CXTRYY6YTTB43JSW#
All communication takes place in English via communication tool in the project area of the procurement portal.
Körper überprüfen
Name: Vergabekammern des Bundes
Nationale Registrierungsnummer: 022894990
Postanschrift: Kaiser-Friedrich-Straße 16
Postleitzahl: 53113
Postort: Bonn
Region: Bonn, Kreisfreie Stadt
🏙️
Land: Deutschland 🇩🇪
E-Mail: vk@bundeskartellamt.bund.de📧
Telefon: +49 2289499-0📞
Fax: +49 2289499-163 📠
URL: https://www.bundeskartellamt.de🌏 Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Informationen über elektronische Arbeitsabläufe
Die elektronische Rechnungsstellung wird akzeptiert
Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2026-08-03+02:00 📅