Design, engineering, supply, construction, installation and commissioning of an offshore accommodation platform (OAP)

DanTysk Offshore Wind GmbH

Design, engineering, supply, construction, installation and commissioning of an offshore accommodation platform (OAP) in the area of the Dan Tysk Offshore Wind Farm situated approx. 70 km west of the Island of Sylt, German exclusive economic zone.
The OAP shall be built to be the offshore base for servicing the wind generator turbines (WTG) and other installations in the wind farm area and therefore to accommodate approx. 40 technicians and platform crew members throughout the whole year (24/365).
The OAP shall be built in close proximity (approx 20 m distance) of the high-voltage offshore substation platform (OSS), which is been contracted already. Both platforms will be built separately. The OSS will be built earlier. Both of them shall be designed to operate independent from each other in case of emergency. An interconnection between the 2 platforms by a bridge is foreseen, which is part of the scope of work for this contract.
The work scope includes design, engineering, supply, construction, installation and commissioning of an offshore accommodation platform (OAP) as well as the necessary engineering.
All engineering and design works are to be based on German legal and HSE requirements and German codes and standards.

Deadline
Die Frist für den Eingang der Angebote war 2011-06-20. Die Ausschreibung wurde veröffentlicht am 2011-05-19.

Anbieter
Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:
Wer?

Wie?

Wo?

Geschichte der Beschaffung
Datum Dokument
2011-05-19 Auftragsbekanntmachung
2012-10-29 Bekanntmachung über vergebene Aufträge