Design, engineering, supply, construction, installation and commissioning of an Offshore Accommodation Platform (OAP) in the area of the Dan Tysk Offshore Wind Farm situated approx. 70 km west of the Island of Sylt, German Exclusive Economic Zone. The OAP shall be built to be the offshore base for servicing the Wind Generator Turbines (WTG) and other installations in the wind farm area and therefore to accommodate approx. 40 Technicians and Platform Crew Members throughout the whole year (24/365). The OAP shall be built in close proximity (approx 20 m distance) of the high-voltage Offshore Substation Platform (OSS), which is been contracted already. Both platforms will be built separately. The OSS will be built earlier. Both of them shall be designed to operate independent from each other in case of emergency. An interconnection between the two platforms by a bridge is foreseen, which is part of the scope of work for this contract. The work scope includes design, engineering, supply, construction, installation and commissioning of an Offshore Accommodation Platform (OAP) as well as the necessary engineering. All engineering and design works are to be based on German legal and HSE requirements and German codes and standards.
Deadline
Die Frist für den Eingang der Angebote war 2011-06-20.
Die Ausschreibung wurde veröffentlicht am 2011-05-16.
Auftragsbekanntmachung (2011-05-16) Objekt Umfang der Beschaffung
Titel: Tankschiffe
Menge oder Umfang:
Design, engineering, supply, construction, installation and commissioning of an Offshore Accommodation Platform (OAP).
Metadaten der Bekanntmachung
Originalsprache: Englisch 🗣️
Dokumenttyp: Auftragsbekanntmachung
Art des Auftrags: Bauleistung
Verordnung: Europäische Union
Gemeinsames Vokabular für öffentliche Aufträge (CPV)
Code: Tankschiffe📦
Verfahren
Verfahrensart: Verhandlungsverfahren
Angebotsart: Angebot für alle Lose
Vergabekriterien
Wirtschaftlichstes Angebot
Öffentlicher Auftraggeber Identität
Land: Deutschland 🇩🇪
Art des öffentlichen Auftraggebers: Versorgungsunternehmen
Postanschrift: Überseering 12
Postleitzahl: 22297
Postort: Hamburg
Kontakt
Internetadresse: http://www.Vattenfall.de🌏
E-Mail: procurement-fpor-oap@vattenfall.de📧
The application and tender procedure is conducted in accordance with the German Sektorenverordnung (SektVO). The contract will be based on FIDIC plant and design-built and the applicable law will be German law.
Pursuant to this regulation the following procedural guidelines have to be observed:
A. Formal.
1. The participation application and the corresponding confirmations/declarations/documentation must be made in writing and in English and additional electronic on a data carrier (CD) (submission to the specified point of contact by the closing date – submission by telefax or electronic form, e.g. by e-mail, is not sufficient).
2. All declarations and confirmations specified in the announcement must be submitted completely. The participation application, confirmations and declarations must be signed personally, original and as legally binding. Copies or Scans of signatures are not allowed.
3. The application documents must be structured according to No. III. 2) and have to contain the requested information in the respective category. Otherwise the awarding authority is not obliged to take such information into consideration. A reference to an earlier application is not sufficient.
4. The application must contain the applicant’s consent to the fact that the awarding authority may be exchanged with another entity. It might be necessary to change the awarding authority to a separate legal entity within the group of the awarding authority in the course of the tender procedure.
5. Applicants who are not seated in Germany shall submit their registry copies, confirmations, certifications and qualifications in accordance with the legal requirements of the seating country.
6. Applicants shall state in their application details of any service(s) / work for the supply of steel, logistics and the fabrication location are to be awarded to subcontractors. In such case, an index of subcontractors (“Nachunternehmerverzeichnis”) with corresponding service(s) / work and the necessary information/declarations/confirmations referred to the points III.2.1, III.2.2 and III.2.3 must be attached to the application.
7. The obligation of the submission of certificates is not applicable, if a comparable register does not exist or if a registration is not necessary in the particular country. In this case applicant has to give sufficient evidence that a comparable register does not exist or if a registration is not necessary.
8. The required information, declarations and confirmations do not constitute minimum conditions. Essential information, i.e. information which absolutely must be submitted by the end of the application period, is designated as „minimum conditions”. Delay or failure to submit information designated as “minimum conditions” will result in exclusion from the procedure. The awarding authority reserves the right to require further declarations and confirmations, but is not obliged to do so, neither are the applicants entitled to complete their documents.
9. The whole tender process will take into account the principles of transparency, equal access, publicity and equal treatment.
10. Queries to the awarding authority must be made exclusively by email, containing the supplement number, until the 7th of June. The awarding authority will try to reply as soon as possible. Queries made after the 7th of June will not be considered.
11. Regarding to the technical capacity (point III.2.3 of this publication) and deviant to the additional information (point VI.3 of this publication) the applicant has to be able to create necessary documents for permissions in German.
B. Selecting the applicants who will be invited to tender.
The awarding authority will examine the participation applications in a four-stage process:
1. Examination of the required confirmations and qualifications,
2. Examination of potential reasons for exclusion („minimum conditions“),
3. Examination of the suitability of the applicant in accordance with the published participation conditions which are not designated as minimum condition.
4. In case that as an result of the examination more than 5 applicants will meet the required demands, the awarding authority reserves the right to send out the Invitation To Tender (ITT) to the most suitable applicants in consideration of the following qualification criteria:
— all required information, declarations and confirmations designated as “other information” will be evaluated each with 1 point if submitted; otherwise with 0 points,
— all required information, declarations and confirmations designated as "weighted information" will be evaluated with in point III.2.2 and III.2.3 mentioned scores,
— information, declarations and confirmations regarding the personal, economic and financial capacity (point III.2.1 and III.2.2 of this publication) of the applicant will be evaluated in total with 14 points by the awarding authority,
— information, declarations and confirmations regarding the technical capacity (point III.2.3 of this publication) of the applicant will be evaluated in total with 12 points by the awarding authority.
The evaluation will follow in accordance with the valuation rules for the particulary qualification criteria.
The applicant selection will follow the rank as a summery of the awarded scores. The five best applicants will be selected. The higher rank, the better.
C. Conditions relating to the contract
1. The awarding of the contract is subject to approval by the corporate bodies of the awarding authority (i.e. Supervisory Board of Vattenfall Europe AG and Supervisory Board of Vattenfall AB and Stadtwerke München GmbH) (organ reservation).
2. The awarding of the contract is subject to the issuance of the necessary permits, approvals and regulatory licenses.
3. The awarding authority reserves the right to cancel the tender procedure in its entirety or in parts at any time.
4. The awarding authority is not liable for any costs incurred by the bidders nor shall it reimburse any expenses or losses which bidders incur or suffer in connection with the tender procedure, including in the event of a cancellation.
The application and tender procedure is conducted in accordance with the German Sektorenverordnung (SektVO). The contract will be based on FIDIC plant and design-built and the applicable law will be German law.
Pursuant to this regulation the following procedural guidelines have to be observed:
A. Formal.
1. The participation application and the corresponding confirmations/declarations/documentation must be made in writing and in English and additional electronic on a data carrier (CD) (submission to the specified point of contact by the closing date – submission by telefax or electronic form, e.g. by e-mail, is not sufficient).
2. All declarations and confirmations specified in the announcement must be submitted completely. The participation application, confirmations and declarations must be signed personally, original and as legally binding. Copies or Scans of signatures are not allowed.
3. The application documents must be structured according to No. III. 2) and have to contain the requested information in the respective category. Otherwise the awarding authority is not obliged to take such information into consideration. A reference to an earlier application is not sufficient.
4. The application must contain the applicant’s consent to the fact that the awarding authority may be exchanged with another entity. It might be necessary to change the awarding authority to a separate legal entity within the group of the awarding authority in the course of the tender procedure.
5. Applicants who are not seated in Germany shall submit their registry copies, confirmations, certifications and qualifications in accordance with the legal requirements of the seating country.
6. Applicants shall state in their application details of any service(s) / work for the supply of steel, logistics and the fabrication location are to be awarded to subcontractors. In such case, an index of subcontractors (“Nachunternehmerverzeichnis”) with corresponding service(s) / work and the necessary information/declarations/confirmations referred to the points III.2.1, III.2.2 and III.2.3 must be attached to the application.
7. The obligation of the submission of certificates is not applicable, if a comparable register does not exist or if a registration is not necessary in the particular country. In this case applicant has to give sufficient evidence that a comparable register does not exist or if a registration is not necessary.
8. The required information, declarations and confirmations do not constitute minimum conditions. Essential information, i.e. information which absolutely must be submitted by the end of the application period, is designated as „minimum conditions”. Delay or failure to submit information designated as “minimum conditions” will result in exclusion from the procedure. The awarding authority reserves the right to require further declarations and confirmations, but is not obliged to do so, neither are the applicants entitled to complete their documents.
9. The whole tender process will take into account the principles of transparency, equal access, publicity and equal treatment.
10. Queries to the awarding authority must be made exclusively by email, containing the supplement number, until the 7th of June. The awarding authority will try to reply as soon as possible. Queries made after the 7th of June will not be considered.
11. Regarding to the technical capacity (point III.2.3 of this publication) and deviant to the additional information (point VI.3 of this publication) the applicant has to be able to create necessary documents for permissions in German.
B. Selecting the applicants who will be invited to tender.
The awarding authority will examine the participation applications in a four-stage process:
1. Examination of the required confirmations and qualifications,
2. Examination of potential reasons for exclusion („minimum conditions“),
3. Examination of the suitability of the applicant in accordance with the published participation conditions which are not designated as minimum condition.
4. In case that as an result of the examination more than 5 applicants will meet the required demands, the awarding authority reserves the right to send out the Invitation To Tender (ITT) to the most suitable applicants in consideration of the following qualification criteria:
— all required information, declarations and confirmations designated as “other information” will be evaluated each with 1 point if submitted; otherwise with 0 points,
— all required information, declarations and confirmations designated as "weighted information" will be evaluated with in point III.2.2 and III.2.3 mentioned scores,
— information, declarations and confirmations regarding the personal, economic and financial capacity (point III.2.1 and III.2.2 of this publication) of the applicant will be evaluated in total with 14 points by the awarding authority,
— information, declarations and confirmations regarding the technical capacity (point III.2.3 of this publication) of the applicant will be evaluated in total with 12 points by the awarding authority.
The evaluation will follow in accordance with the valuation rules for the particulary qualification criteria.
The applicant selection will follow the rank as a summery of the awarded scores. The five best applicants will be selected. The higher rank, the better.
C. Conditions relating to the contract
1. The awarding of the contract is subject to approval by the corporate bodies of the awarding authority (i.e. Supervisory Board of Vattenfall Europe AG and Supervisory Board of Vattenfall AB and Stadtwerke München GmbH) (organ reservation).
2. The awarding of the contract is subject to the issuance of the necessary permits, approvals and regulatory licenses.
3. The awarding authority reserves the right to cancel the tender procedure in its entirety or in parts at any time.
4. The awarding authority is not liable for any costs incurred by the bidders nor shall it reimburse any expenses or losses which bidders incur or suffer in connection with the tender procedure, including in the event of a cancellation.
Objekt Umfang der Beschaffung
Die Bekanntmachung betrifft: Public_contract
Kurze Beschreibung:
Design, engineering, supply, construction, installation and commissioning of an Offshore Accommodation Platform (OAP) in the area of the Dan Tysk Offshore Wind Farm situated approx. 70 km west of the Island of Sylt, German Exclusive Economic Zone.
The OAP shall be built to be the offshore base for servicing the Wind Generator Turbines (WTG) and other installations in the wind farm area and therefore to accommodate approx. 40 Technicians and Platform Crew Members throughout the whole year (24/365).
The OAP shall be built to be the offshore base for servicing the Wind Generator Turbines (WTG) and other installations in the wind farm area and therefore to accommodate approx. 40 Technicians and Platform Crew Members throughout the whole year (24/365).
The OAP shall be built in close proximity (approx 20 m distance) of the high-voltage Offshore Substation Platform (OSS), which is been contracted already. Both platforms will be built separately. The OSS will be built earlier. Both of them shall be designed to operate independent from each other in case of emergency. An interconnection between the two platforms by a bridge is foreseen, which is part of the scope of work for this contract.
The OAP shall be built in close proximity (approx 20 m distance) of the high-voltage Offshore Substation Platform (OSS), which is been contracted already. Both platforms will be built separately. The OSS will be built earlier. Both of them shall be designed to operate independent from each other in case of emergency. An interconnection between the two platforms by a bridge is foreseen, which is part of the scope of work for this contract.
The work scope includes design, engineering, supply, construction, installation and commissioning of an Offshore Accommodation Platform (OAP) as well as the necessary engineering.
All engineering and design works are to be based on German legal and HSE requirements and German codes and standards.
Gemeinsames Vokabular für öffentliche Aufträge (CPV)
Zusätzlicher CPV-Code: IA21
Ort der Leistung
Hauptstandort oder Erfüllungsort: Exclusive Economic Zone (EEZ) of Germany.
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Befähigung zur Berufsausübung:
1) Other information.
Cover letter with information about the applicant’s business case and the structure of applicant’s entity.
2) Minimum condition.
Copy of an up to date registry entry in the companies or professional register (or similar) of the country in which the applicant is seated, issued by the responsible authority.
3) Other information.
Confirmation of current membership of a professional association (e.g. Chamber of Engineers or similar organization) of the country in which the applicant is seated, issued by the responsible authority.
4) Minimum condition.
Current confirmation of payment of taxes and social security contributions in the country in which the applicant is seated, issued by the responsible authority.
5) Minimum condition.
Declaration that no legally binding judgement has been passed relating to offences in the sence of § 21 Abs. 1+ 2 SektVO.
6) Minimum condition.
Declaration about the absence of the following circumstances:
a) any preconditions which could lead to bankruptcy or any similar financial situation;
b) convictions for an offence committed by applicant or applicant’s management in connection with professional conduct;
c) any circumstances with regard to grave professional misconduct committed by applicant or applicant’s management;
d) the fact that the applicant has not been charged by a court to be in serious breach of a contract;
e) any conflict of interest;
f) any misrepresentation in supplying the information required by awarding authority of contacts with other applicants or bidders with the purpose of restraining competition (e.g. due to lack of funds).
For further information please check No. VI.3) of this notice.
Wirtschaftliche und finanzielle Leistungsfähigkeit:
1a) Weighted information.
Credit rating information by.
1a) Bank reference/confirmation (in the event of several bank accounts, two qualified bank confirmations will be required) containing the information duration of the business relationship and credit ranking by the bank.
2 or more complete Bank References will be evaluated with 2 points, 1 complete Bank Reference will be evaluated with 1 point; otherwise 0 point.
1b) Other information.
1b) Current Credit information (D&B, Coface, Moody’s, S&P, Creditreform or similar).
2) Weighted information.
The three latest audited annual reports of the bidder and its credit support provide (if applicable), including notes to the financials, business review / outlook and audit opinion (if applicable).
Audited annual reports for the last 3 years with information on:
2a) Profit and loss.
The Average of the last three annual reports of funds from operation (FFO) divided by total debt in (%). This business ratio will be calculated as follows: Net income from continuing operations, depreciation and amortization, deferred income taxes, and other non-cash items divided by long-term debts plus current maturities plus commercial paper and other short-term borrowings.
Wirtschaftliche und finanzielle Leistungsfähigkeit
The Average of the last three annual reports of funds from operation (FFO) divided by total debt in (%). This business ratio will be calculated as follows: Net income from continuing operations, depreciation and amortization, deferred income taxes, and other non-cash items divided by long-term debts plus current maturities plus commercial paper and other short-term borrowings.
A result of at least 55 % will be evaluated with 3 points, a result less than 55 % and greater or equal than 45 % will be evaluated with 2 points and a result less than 45 % and greater or equal than 35 % will be evaluated with 1 point, a result of less then 35 % will be evaluated with 0 points.
Wirtschaftliche und finanzielle Leistungsfähigkeit
A result of at least 55 % will be evaluated with 3 points, a result less than 55 % and greater or equal than 45 % will be evaluated with 2 points and a result less than 45 % and greater or equal than 35 % will be evaluated with 1 point, a result of less then 35 % will be evaluated with 0 points.
2b) balance sheet.
An average equity ratio of the last 3 audited annual reports greater or equal than 35 % will be evaluated with 3 points, an equity ratio less than 35 % and greater or equal than 25 % will be evaluated with 2 points and an equity ratio less than 25 %, and greater or equal than 15 % will be evaluated with 1 point, an equity ratio of less than 15 % will be evaluated with 0 points.
Wirtschaftliche und finanzielle Leistungsfähigkeit
An average equity ratio of the last 3 audited annual reports greater or equal than 35 % will be evaluated with 3 points, an equity ratio less than 35 % and greater or equal than 25 % will be evaluated with 2 points and an equity ratio less than 25 %, and greater or equal than 15 % will be evaluated with 1 point, an equity ratio of less than 15 % will be evaluated with 0 points.
2c) cash flow.
The Average if the last three annual reports of free operating cash flow divided by total debt in (%). This business ratio will be calculated as follows: Funds from operation minus capital expenditures minus (plus) increase (decrease) in working capital (excluding changes in cash, marketable securities and short-term debt) divided by long-term debts plus current maturities, commercial paper and other short-term borrowings.
Wirtschaftliche und finanzielle Leistungsfähigkeit
The Average if the last three annual reports of free operating cash flow divided by total debt in (%). This business ratio will be calculated as follows: Funds from operation minus capital expenditures minus (plus) increase (decrease) in working capital (excluding changes in cash, marketable securities and short-term debt) divided by long-term debts plus current maturities, commercial paper and other short-term borrowings.
A result of at least 35 % will be evaluated with 3 points, a result less than 35 % and greater or equal than 25 % will be evaluated with 2 points and a result less than 25 % and greater or equal than 15 % will be evaluated with 1 point, a result of less then 15 % will be evaluated with 0 points.
Wirtschaftliche und finanzielle Leistungsfähigkeit
A result of at least 35 % will be evaluated with 3 points, a result less than 35 % and greater or equal than 25 % will be evaluated with 2 points and a result less than 25 % and greater or equal than 15 % will be evaluated with 1 point, a result of less then 15 % will be evaluated with 0 points.
The aforementioned information have to be marked in the audited annual reports or have to be submitted separately to the audited annual reports. The awarding authority reserves the right to verify these information.
Technische und berufliche Fähigkeiten:
1) Weighted information.
References, taking into account:
1a) the comparability with regard to (minimum condition: Description of 1 reference);
1aa) platform dedicated for offshore application, preferable for offshore living purposes;
1ab) other sophisticated civil engineering structures offshore;
1ac) nomination of contact partners with contact in the reference project services, provided by the bidder or by sub-contractors;
1b) the number of comparable references in accordance with 1a);
3 or more references will be evaluated with 6 points, 2 references will be evaluated with 4 points and 1 reference will be evaluated with 2 point. If minimum 1 reference is for offshore living purposes it will be evaluated with a maximum of 1 extra point.
3 or more references will be evaluated with 6 points, 2 references will be evaluated with 4 points and 1 reference will be evaluated with 2 point. If minimum 1 reference is for offshore living purposes it will be evaluated with a maximum of 1 extra point.
1c) the actuality of the comparable references in accordance with 1a) (reference date is the publication date of this order announcement and the Final Taking Over of the reference):
An actuality of 3 ore more references less than 3 years will be evaluated with 3 points. An actuality of 2 references less than 3 years will be evaluated with 2 points. An actuality of 1 reference less than 3 years will be evaluated with 1 point.
2) Minimum condition.
Confirmation that the applicant, in the event of contract award, is able to fulfil the contract in accordance with the applicable EN or DIN standards, BSH rules, permissions and other German rules, the applicable technical rules and regulations and the latest state of the technology.
Confirmation that the applicant, in the event of contract award, is able to fulfil the contract in accordance with the applicable EN or DIN standards, BSH rules, permissions and other German rules, the applicable technical rules and regulations and the latest state of the technology.
3) Minimum condition.
The applicant has been certified in accordance with ISO 9001:2000 and VCA (Contractor Safety Certificate) / SCC (Safety Checklist Contractor) / OHSAS 18001 or equal.
4) Other information.
Information on the safety, health and environmental management system of the applicant (including statistics about accidents or lost time accidents for a period of the last 10 years).
5) Other information.
The applicant has to provide information regarding the use of the resources of sub-contractors for the supply of steel, logistics and the fabrication location.
Auftragsausführung
Geforderte Kautionen und Garantien:
In case that the bidder is no Ultimate Parent Company, the bidder has to provide an Ultimate Parent Company Guarantee in addition to other Guarantees. Details will be provided in the invitation to tender (ITT).
Wichtigste Finanzierungsbedingungen und Zahlungsmodalitäten und/oder Verweis auf die einschlägigen Bestimmungen, die sie regeln: Details will be provided in the invitation to tender (ITT).
Rechtsform der Gruppe von Wirtschaftsteilnehmern, an die der Auftrag vergeben werden soll:
Two or more applicants may also form a grouping in the form of an application consortium in order to obtain an ITT. No specific legal form is required but the individual members of such a consortium shall be jointly and severally liable. The application and later bidder consortium shall remain unchanged throughout the whole procedure for the settlement of contract. If unforeseen circumstances require a change in the composition of such consortium, the awarding authority may allow such change at its sole discretion provided that the change does not distort competition amongst the applicants.
Rechtsform der Gruppe von Wirtschaftsteilnehmern, an die der Auftrag vergeben werden soll
Two or more applicants may also form a grouping in the form of an application consortium in order to obtain an ITT. No specific legal form is required but the individual members of such a consortium shall be jointly and severally liable. The application and later bidder consortium shall remain unchanged throughout the whole procedure for the settlement of contract. If unforeseen circumstances require a change in the composition of such consortium, the awarding authority may allow such change at its sole discretion provided that the change does not distort competition amongst the applicants.
Verfahren Sprachen
Sprache: Englisch 🗣️
Öffentlicher Auftraggeber Identität
Name des öffentlichen Auftraggebers: DanTysk Offshore Wind GmbH
Haupttätigkeit: Electricity
Kontakt
Kontaktperson: Frau Krüger
Internetadresse: www.Vattenfall.de🌏
Name: DanTysk Offshore Wind GmbH c/o Vattenfall Europe Business Services GmbH
Kontaktperson: Angebotseingangsstelle der Vattenfall Europe AG
URL der Teilnahme: www.Vattenfall.de🌏
Referenz Daten
Datum des Beginns: 2012-01-01 📅
Datum des Endes: 2014-04-01 📅
Ergänzende Informationen Körper überprüfen
Name: Vergabekammer bei der Behörde für Stadtentwicklung und Umwelt Hamburg
Postort: Hamburg
Postleitzahl: 20354
Land: Deutschland 🇩🇪
Quelle: OJS 2011/S 096-158051 (2011-05-16)
Ergänzende Angaben (2011-05-19) Objekt Metadaten der Bekanntmachung
Dokumenttyp: Ergänzende Angaben