Planning, construction and commissioning of three combined-cycle gas and steam turbine power plants (CCGTs) in Berlin

Vattenfall Europe Wärme AG

The existing power plants will be replaced by new combined-cycle gas and steam turbine –thermal- power plants (‘CCGT’ in the remainder of this document). During winter times, these new power plants will primarily be operated on a heat-controlled basis. They will simultaneously offer additional grid services and thus also enable pure condensation operation. This tender procedure covers both the construction of the power plants as well as the long therm service agreements (LTSAs) for the gas turbines involved. Further details can be derived from the lot descriptions.
Even though the (combined) contractual objects are divided into “construction“ and “LTSA“ it is common practice in the industry sector to consider the economic efficiency as a whole. Therefore, the decision about the economically most advantageous solution in the tendering procedure will be based on the overall economic efficiency of a tender on both “construction” and “LTSA”). Thus, a division into single lots would make no economic sense. Tender documents will provide further details on this.
In order to display the accountability for each contractual part clearly, each contractual part, “construction” on the one hand and “LTSA” on the other, shall be subject to one separate agreement as is common practice in the industry sector. It is possible to enter into two separate agreements with one company who offers both contractual parts in one. Likewise, it is possible, that in case of an applicant consortium, one or more members of the consortium assume the “construction” whereas one or more members of the consortium assume the “LTSA”. The offering of both contractual parts in one agreement by one applicant shall be excluded. Likewise, the offering of merely one contractual part (e.g. “construction”) while using a subcontractor for the other part (e.g. “LTSA”) shall also be excluded. The employer desires to select the responsible party directly and to enter into an agreement with such party by himself.

Deadline
Die Frist für den Eingang der Angebote war 2011-08-16. Die Ausschreibung wurde veröffentlicht am 2011-06-24.

Anbieter
Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:
Wer?

Wie?

Wo?

Geschichte der Beschaffung
Datum Dokument
2011-06-24 Auftragsbekanntmachung
2012-12-31 Ergänzende Angaben
2013-04-09 Bekanntmachung über vergebene Aufträge