Support for the physical and thermohydraulic design of reactor cores and core components and for operational support for the Brunsbüttel and Krümmel nuclear power plants

Vattenfall Europe Nuclear Energy GmbH

The tasks comprise:
— Inspection of the design of reactor cores as part of cycle planning, with the tools provided by the client,
— Inspection of the design of fuel elements,
— Analysis of the stationary and transient behaviour of the reactor core,
— Development and optimisation of control rod movement and step sequences,
— Analysis and evaluation of operating data,
— Preparation of zero-power measurements through predictive calculation and creation of the test program, followed by evaluation of measurement results and documentation in report form,
— Preparation of stability measurements through predictive calculation, creation of the test program, followed by evaluation of measurement results and documentation in report form,
— Evaluation of design reports for core components (fuel elements, control elements).
Performance of the above tasks requires a very good knowledge of nuclear technology in general.

Deadline
Die Frist für den Eingang der Angebote war 2011-03-08. Die Ausschreibung wurde veröffentlicht am 2011-02-01.

Wer?

Wie?

Wo?

Geschichte der Beschaffung
Datum Dokument
2011-02-01 Auftragsbekanntmachung