Data centre infrastructure management (DCIM) system, out-of-band management devices and related centralised management software
In order to efficiently and effectively manage its distributed data centres, the ECB is looking at the acquisition of a modular data centre infrastructure management system (DCIM system). The system is primarily required, to deal, in a holistic manner, with space and rack management, power monitoring and management, cabling documentation — management, activity planning (add, move and changes, what if simulation, activity lists), capacity planning, reporting and statistics.
Furthermore, the ECB needs to equip its data centres and technical rooms with a set of devices commonly used to access IT components for out-of-band management/administration purposes. These devices are expected to be managed by a common platform management tool which must permit centralised management and offer a central point of access.
Deadline
Die Frist für den Eingang der Angebote war 2012-07-20.
Die Ausschreibung wurde veröffentlicht am 2012-05-31.
Anbieter
Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:
Wer?
Wie?
Wo?
Geschichte der Beschaffung
Datum |
Dokument |
2012-05-31
|
Auftragsbekanntmachung
|
2013-06-24
|
Bekanntmachung über vergebene Aufträge
|