CIV 1: WTG Foundation Manufacturing Package

Sandbank Offshore Wind GmbH

The whole project consists of 96 WTGs, WTG Foundations, Inter Array Cables and an Offshore Substation (OSS). The wind farm is located in the German Bight, 90 km west of the island of Sylt, in the German Exclusive Economic Zone (EEZ). The location provides water depths between 25 and 34 meters. The Sandbank project is equipped with an irrevocable permit. In a first construction phase 288 MW will be realized.
The total scope of work of this tender includes the manufacturing, fabrication, procurement of steel, transportation to the base harbour of the monopiles and transition pieces for the wind turbines. Again, this total scope of work for this tender will be divided into 2 similar lots, each containing the same scope of work. The separate contract value of these lots is foreseen to be comparable to each other. Further details will be provided in the ITT. The time limit for the completion of the total scope of work will be early 2016.

Deadline
Die Frist für den Eingang der Angebote war 2013-03-11. Die Ausschreibung wurde veröffentlicht am 2013-02-08.

Wer?

Wie?

Geschichte der Beschaffung
Datum Dokument
2013-02-08 Auftragsbekanntmachung