a. Sandbank Offshore Wind GmbH, Hamburg, intends to build an offshore wind farm in the North Sea. In the first construction phase it is planned to build 72 wind turbines with a total output of 288 MW, inter array cables and an offshore substation. The project is located in the German Bight area, around 90 km to the west of the Island of Sylt, directly on the border between Germany and Denmark. The water depth is between 24 and 35 m. b. The project is fully permitted and has received the first BSH release in November 2009. c. The project is in the design phase and current certification tasks are conducted by Germanischer Lloyd Industrial Services. d. For further BSH releases the project certification is split into four lots:
- design phase wind turbine generator and foundation (Lot 1);
- design phase offshore substation and inter array cables (Lot 2);
- implementation phase wind turbine generator and foundation (Lot 3);
- implementation phase offshore substation and inter array cables (Lot 4);
e. Timeline
- submission of documents for 2nd BSH release mid of 2014;
- submission of documents for 3rd BSH release end of 2014;
- construction start 2015;
- comissioning 2016.
Deadline
Die Frist für den Eingang der Angebote war 2013-07-04.
Die Ausschreibung wurde veröffentlicht am 2013-06-03.
Anbieter
Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:
Wer?
Wie?
Wo?
Geschichte der Beschaffung
Datum |
Dokument |
2013-06-03
|
Auftragsbekanntmachung
|
2013-06-05
|
Ergänzende Angaben
|
2014-09-19
|
Bekanntmachung über vergebene Aufträge
|