Project certification of the offshore wind farm Sandbank

Sandbank Offshore Wind GmbH

a. Sandbank Offshore Wind GmbH, Hamburg, intends to build an offshore wind farm in the North Sea. In the first construction phase it is planned to build 72 wind turbines with a total output of 288 MW, inter array cables and an offshore substation. The project is located in the German Bight area, around 90 km to the west of the Island of Sylt, directly on the border between Germany and Denmark. The water depth is between 24 and 35 m. b. The project is fully permitted and has received the first BSH release in November 2009. c. The project is in the design phase and current certification tasks are conducted by Germanischer Lloyd Industrial Services. d. For further BSH releases the project certification is split into four lots:
- design phase wind turbine generator and foundation (Lot 1);
- design phase offshore substation and inter array cables (Lot 2);
- implementation phase wind turbine generator and foundation (Lot 3);
- implementation phase offshore substation and inter array cables (Lot 4);
e. Timeline
- submission of documents for 2nd BSH release mid of 2014;
- submission of documents for 3rd BSH release end of 2014;
- construction start 2015;
- comissioning 2016.

Deadline

Die Frist für den Eingang der Angebote war 2013-07-04. Die Ausschreibung wurde veröffentlicht am 2013-06-03.

Anbieter

Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:

Wer? Wie? Wo?
Geschichte der Beschaffung
Datum Dokument
2013-06-03 Auftragsbekanntmachung
2013-06-05 Ergänzende Angaben
2014-09-19 Bekanntmachung über vergebene Aufträge
Auftragsbekanntmachung (2013-06-03)
Objekt
Umfang der Beschaffung
Titel: Beratungsdienste von Ingenieurbüros
Menge oder Umfang:
a. The scope of work covers the project certification in accordance with BSH regulations for all components of the wind farm starting after the first BSH release and results of interims certification.b. All the work shall be executed in accordance with the permit, the BSH standards and the first release.c. Lot 1 covers wind turbine and foundation design phase certification.i. 72 Wind turbine generator including tower and blades, SWT 4.3-130;ii. 72 Monopile/Transition Piece foundations for the WTG.Lot 2 covers offshore substation and inter array cabling design phase certification.iii. Offshore substation on a jacket foundation;iv. Inter array cabling.Lot 3 covers wind turbine and foundation implementation phase certification.i. 72 Wind turbine generator including tower and blades, SWT 4.3-130;ii. 72 Monopile/Transition Piece foundations for the WTG.Lot 4 covers offshore substation and inter array cabling implementation phase certification.iii. Offshore substation on a jacket foundation;iv. Inter array cabling.
Mehr anzeigen
Metadaten der Bekanntmachung
Originalsprache: Englisch 🗣️
Dokumenttyp: Auftragsbekanntmachung
Art des Auftrags: Dienstleistungen
Verordnung: Europäische Union
Gemeinsames Vokabular für öffentliche Aufträge (CPV)
Code: Beratungsdienste von Ingenieurbüros 📦

Verfahren
Verfahrensart: Verhandlungsverfahren
Angebotsart: Angebot für ein oder mehrere Los(e)
Vergabekriterien
Wirtschaftlichstes Angebot

Öffentlicher Auftraggeber
Identität
Land: Deutschland 🇩🇪
Art des öffentlichen Auftraggebers: Versorgungsunternehmen
Name des öffentlichen Auftraggebers: Sandbank Offshore Wind GmbH
Postanschrift: Überseering 12
Postleitzahl: 22297
Postort: Hamburg
Kontakt
Internetadresse: http://www.vattenfall.de 🌏
E-Mail: thomas.voigt@vattenfall.de 📧
Telefon: +49 4063962587 📞
Fax: +49 4063962620 📠

Referenz
Daten
Absendedatum: 2013-06-03 📅
Einreichungsfrist: 2013-07-04 📅
Veröffentlichungsdatum: 2013-06-05 📅
Kennungen
Bekanntmachungsnummer: 2013/S 107-183779
ABl. S-Ausgabe: 107
Zusätzliche Informationen
The application and tender procedure is conducted in accordance with the German law. Pursuant to this regulation the following procedural guidelines have to be observed: A. Formal 1. The participation application and the corresponding confirmations/declarations/documentation must be made in writing and in English and additional electronic on a data carrier (CD) (submission to the specified point of contact by the closing date – submission by telefax or electronic form, e.g. by e-mail, is not sufficient). 2. All declarations and confirmations specified in the announcement must be submitted completely. The participation application, confirmations and declarations must be signed personally, original and as legally binding. Copies or Scans of signatures are not allowed. 3. The application documents must be structured according to No. III. 2) and have to contain the requested information in the respective category. Otherwise the awarding authority is not obliged to take such information into consideration. A reference to an earlier application is not sufficient. 4. The application must contain the applicant's consent to the fact that the awarding authority may be exchanged with another entity. It might be necessary to change the awarding authority to a separate legal entity within the group of the awarding authority in the course of the tender procedure. 5. Applicants who are not seated in Germany shall submit their registry copies, confirmations, certifications and qualifications in accordance with the legal requirements of the seating country. 6. Applicants shall state in their application details of any service(s) / work for execution of services, are to be awarded to third parties as subcontractors. In such case, an index of subcontractors with corresponding service(s) / work and the necessary information/declarations/confirmations must be attached to the application. 7. The obligation of the submission of certificates is not applicable, if a comparable register does not exist or if a registration is not necessary in the particular country. In this case applicant has to give sufficient evidence that a comparable register does not exist or if a registration is not necessary. 8. The required information, declarations and confirmations do not constitute minimum conditions. Essential information, i.e. information which absolutely must be submitted by the end of the application period, is designated as „minimum conditions”. Delay or failure to submit information designated as “minimum conditions” will result in exclusion from the procedure. The awarding authority reserves the right to require further declarations and confirmations, but is not obliged to do so, neither are the applicants entitled to complete their documents. 9. The decision on the invitation to tender will take into account the principles of transparency, equal access, publicity and equal treatment. 10. Regarding to the technical capacity (point III.2.3 of this publication) and deviant to the additional information (point VI.3 of this publication) the bidder has to be able to create necessary documents for permissions in German. 11. The awarding authority is not liable for any costs incurred by the applicants nor shall it reimburse any expenses or losses which applicants incur or suffer in connection with the application procedure, including in the event of a cancellation. B. Selecting the operators who will be invited to tender. The awarding authority will examine the participation applications in a four-stage process: 1. Examination of the required confirmations and qualifications, 2. Examination of potential reasons for exclusion („minimum conditions“), 3. Examination of the suitability of the applicant in accordance with the published participation conditions which are not designated as minimum condition. 4. In case that as an result of the examination more than 5 applicants will meet the required demands, the awarding authority reserves the right to send out the invitation to tender (ITT) to the most suitable applicants in consideration of the following qualification criteria: -All required information, declarations and confirmations designated as “other information” will be evaluated each with 1 point if submitted; otherwise with 0 points. -Information, declarations and confirmations regarding applicant will be evaluated in total with 2 points by the awarding authority. - Information, declarations and confirmations regarding the technical capacity (point III.2.3 of this publication) of the applicant will be evaluated in total with 15 points by the awarding authority. The evaluation will follow in accordance with the valuation rules for the particularly qualification criteria. The applicants selection will follow the rank as a summery of the awarded scores. The Awarding Authority reserves the right in the case that more then 5 applicants fulfil the requirements to select the five best applicants based on the rank list. The higher rank, the better. C. Conditions relating to the contract. 1. The awarding of the contract is subject to approval by the corporate bodies of the awarding authority (i.e. Board of Directors of Vattenfall AB) (organ reservation). 2. The awarding of the contract is subject to the confirmation by the awarding authority that the work described in this announcement will be carried out with commercial reasonableness. 3. The awarding of the contract is subject to the issuance of the necessary permits, approvals and regulatory licenses. 4. The awarding authority reserves the right to cancel the tender procedure in its entirety or in parts at any time. 5. The awarding authority is not liable for any costs incurred by the bidders nor shall it reimburse any expenses or losses which bidders incur or suffer in connection with the tender procedure, including in the event of a cancellation.
Mehr anzeigen

Objekt
Umfang der Beschaffung
Dienstleistungskategorie: 27
Kurze Beschreibung:
a. Sandbank Offshore Wind GmbH, Hamburg, intends to build an offshore wind farm in the North Sea. In the first construction phase it is planned to build 72 wind turbines with a total output of 288 MW, inter array cables and an offshore substation. The project is located in the German Bight area, around 90 km to the west of the Island of Sylt, directly on the border between Germany and Denmark. The water depth is between 24 and 35 m. b. The project is fully permitted and has received the first BSH release in November 2009. c. The project is in the design phase and current certification tasks are conducted by Germanischer Lloyd Industrial Services. d. For further BSH releases the project certification is split into four lots:
Mehr anzeigen
- design phase wind turbine generator and foundation (Lot 1);
- design phase offshore substation and inter array cables (Lot 2);
- implementation phase wind turbine generator and foundation (Lot 3);
- implementation phase offshore substation and inter array cables (Lot 4);
e. Timeline
- submission of documents for 2nd BSH release mid of 2014;
- submission of documents for 3rd BSH release end of 2014;
- construction start 2015;
- comissioning 2016.
Losnummer: 1
Bezeichnung des Loses: Lot 1: design phase wind turbine generator and foundation
Kurze Beschreibung: Lot 1 covers wind turbine and foundation design phase certification.
Losnummer: 2
Bezeichnung des Loses: Lot 2: design phase offshore substation and inter array cables
Kurze Beschreibung:
Lot 2 covers offshore substation and inter array cabling design phase certification.
Losnummer: 3
Bezeichnung des Loses: Lot 3: implementation phase wind turbine generator and foundation
Kurze Beschreibung: Lot 3 covers wind turbine and foundation implementation phase certification.
Losnummer: 4
Bezeichnung des Loses: Lot 4: implementation phase offshore substation and inter array cables.
Kurze Beschreibung:
Lot 4 covers offshore substation and inter array cabling implementation phase certification.
Menge oder Umfang:
a. The scope of work covers the project certification in accordance with BSH regulations for all components of the wind farm starting after the first BSH release and results of interims certification.
b. All the work shall be executed in accordance with the permit, the BSH standards and the first release.
c. Lot 1 covers wind turbine and foundation design phase certification.
i. 72 Wind turbine generator including tower and blades, SWT 4.3-130;
ii. 72 Monopile/Transition Piece foundations for the WTG.
Lot 2 covers offshore substation and inter array cabling design phase certification.
iii. Offshore substation on a jacket foundation;
iv. Inter array cabling.
Lot 3 covers wind turbine and foundation implementation phase certification.
Lot 4 covers offshore substation and inter array cabling implementation phase certification.
Ort der Leistung
Hauptstandort oder Erfüllungsort: Hamburg and EEZ Germany.

Rechtliche, wirtschaftliche, finanzielle und technische Informationen
Bedingungen für die Teilnahme
Befähigung zur Berufsausübung:
1. Cover letter with information about the applicant's business case and the structure of applicant's entity. (other information).
2. Copy of an up to (not older than 6 months since announcement date) date registry entry in the companies or professional register (or similar) of the country in which the applicant is seated, issued by the responsible authority. (minimum condition).
Mehr anzeigen
3. Confirmation of current membership of a professional association (e.g. Chamber of Engineers or similar organization) of the country in which the applicant is seated, issued by the responsible authority. (other information)
4. Current confirmation of payment of taxes and social security contributions in the country in which the applicant is seated, issued by the responsible authority (e. g. Germany: Finanzamt and Krankenkasse; UK: HM revenue and customs; The Netherlands: Belastingdienst; Denmark: Erhvervs- og Selbskabsstyrelsen) (minimum condition).
Mehr anzeigen
5. Self-declaration that no legally binding judgement has been passed relating to offences in the sence of § 21 Abs. 1 and 2 SektVO. (minimum condition).
6. Self-declaration about the absence of the following circumstances (minimum conditions):
a) any preconditions which could lead to bankruptcy or any similar financial situation,
b) convictions for an offence committed by applicant or applicant's management in connection with professional conduct,
c) any circumstances with regard to grave professional misconduct committed by applicant or applicant's management,
d) of the fact that the applicant has not been charged by a court to be in serious breach of a contract,
e) of any conflict of interest,
f) of any misrepresentation in supplying the information required by awarding authority of contacts with other applicants or bidders with the purpose of restraining competition (e.g. due to lack of funds).
For further information please check No. VI.3) of this notice.
The lack of confirmations/declarations/documentation designated as "minimum condition" information/formalities will result in exclusion from the further award procedure.
If the bidder or bidder consortium, if this is applicable for the scope of work, intends to make use of the resources of third parties/sub-contractors for confirmation of the performance capability in the course of the participation competition, the above declarations and confirmations regarding to the proportional scope of work must also be submitted with regard to the third parties/sub-contractors.
Mehr anzeigen
Wirtschaftliche und finanzielle Leistungsfähigkeit:
1. Information and formalities necessary for evaluating if the requirements are met: i. Respondent or, if applicable its parents, shall have the reputable and healthy financial standing necessary to execute the announced Contract with the corresponding risk profile. The yearly turnover average over the last three years will be minimal 1 times the Estimated Contract value.
Mehr anzeigen
2. Information part of the Respondents Application: Full audited, consolidated annual reports, including management report and explanatory notes and with a non-qualified auditor opinion, for the most recent three years for the Respondent and, if applicable its parents. In case of a Joint Venture, please include this information for each partner. Additional financial information must be provided that relates specifically to the field of business related to the scope of the announced contract.
Mehr anzeigen
3. At contract award, Respondent is willing to issue performance bonds of approx. 15% of the annual contract amount, valid for the contract duration, in a form and amount acceptable to Vattenfall and by an independent, third party bank with a minimum A-/A3 (rating by Standard Poor's and/or Moody's).
Mehr anzeigen
4. Information part of the Respondents Application: Duly signed declaration from the Respondent stating its unconditional willingness to issue such guarantee at contract award or as stated in the Contract.
5. Information required at conditional contract award: Duly signed Performance Guarantee part of the Contract and according to the format included in the ITT.
6. At contract award, Respondent is willing to issue security for any advance payments with advance payment bonds in a form and amount acceptable to Vattenfall and by an independent, third party bank with a minimum rating of A-/A3 (rating by Standard Poor's and/or Moody's).
Mehr anzeigen
7. Information part of the Respondents Application: Duly signed declaration from the Respondent stating its unconditional willingness to issue such guarantee at contract award or as stated in the Contract.
8. Information required at conditional contract award: Duly signed Advance Payment Guarantee part of the Contract and according to the format included in the ITT.
9. Respondent shall provide an overview of the corporate legal structure of Respondents or its parent (if applicable).
10. Information part of the Respondents Application: Overview of corporate legal ownership structure of Respondent or, if applicable, its parents.
11. A full credit check and financial assessment will be part of the evaluation procedure.
All these informations are minimum conditions.
Technische und berufliche Fähigkeiten:
Applicable for Lot 1, Lot 2, Lot 3 and Lot 4:
1. Confirmation of acceptance by BSH for project certification. (minimum conditions).
2. Self-declaration that the applicant will accept all certified documents from any other certification body. An insight of all documents for first BSH release can be provided after prequalification and after receiving of the tender documents (minimum conditions).
Mehr anzeigen
3. The bidder needs to prove references in the following: (minimum conditions).
- Acting as a certifying body in offshore wind projects in the German EEZ in accordance with the BSH requirements,
Applicable for Lot 1:
4. The bidder needs to prove references in the following: (minimum conditions);
- having issued a certificate of conformity for turbines and foundations for the basic design (2nd BSH release).
Applicable for Lot 2:
5. The bidder needs to prove references in the following: (minimum conditions):
- having issued a certificate of conformity for a offshore substation or converter platform for the basic design (2nd BSH release).
Applicable for Lot 3 and Lot 4:
6. The bidder needs to prove experience / references in the following:
a. Construction surveillance during manufacturing and installation / commissioning (> 100 Mio Euro investment volume);
b. Project management:
These experiences / references are to be described especially with regard to scope of work of the bidder, time schedule and the involved personnel.
The references must show the experience of the applicant in the following parts (if applicable for the lots 3 and 4):
a) Wind Turbine Generator (WTG) Offshore (Blades, Gearboxes, Generators, Hub, Shafts, Main Bearings, Tower, Nacelle Casing);
b) Steel work for Supporting Structures/ Foundations Offshore (Monopiles, Transition pieces, Platform for Substation, Accommodation Platform);
c) Electrical System Offshore (Converter, HV-, LV-Switchgears);
d) Cables Offshore;
e) Information & Control/ Function Safety Offshore (Wind Park Management System, SCADA).
7. Confirmation that the applicant, in the event of contract award, is able to fulfil the contract in accordance with the applicable BSH rules, permissions and other German rules (other information).
8. The applicant has to provide information regarding the use of the resources of third parties/sub-contractors to comply with requirements under II.1.5.) of this Contract Notice (other information).
9. The bidder has to describe how the project team will be set-up. The involved (key) persons / subcontractors are to mention. Further it has to be shown how the project management will look like and how it will be implemented. The responsible project manager has to be appointed. (other information).
Mehr anzeigen
Score scheme for references under Section III.2.3) 1) – 4).
Scores for 6a):
— 4 or more accepted references will be evaluated with 8 points,
— 3 accepted references will be evaluated with 6 points,
— 2 accepted references will be evaluated with 3 points,
— 1 accepted reference will be evaluated with 1 point.
Scores for bb):
— 4 or more accepted references will be evaluated with 4 points,
— 3 accepted references will be evaluated with 3 points,
— 2 accepted references will be evaluated with 2 points,
The actuality of the comparable references in accordance with 3a -3c) (reference date is the publication date of this order announcement and the Final Taking Over of the reference):
— An actuality of 3 references less than 3 years will be evaluated with 3 points,
— An actuality of 2 references less than 3 years will be evaluated with 2 points,
— An actuality of 1 reference less than 3 years will be evaluated with 1 point.).
If the bidder or bidder consortium, if this is applicable for the scope of work, intends to make use of the resources of third parties/sub-contractors for confirmation of the performance capability in the course of the participation competition, the above declarations and confirmations regarding to the proportional scope of work must also be submitted with regard to the third parties/sub-contractors.
Mehr anzeigen
Auftragsausführung
Geforderte Kautionen und Garantien:
In case that the bidder is no Ultimate Parent Company the bidder has to provide a Parent Company Guarantee in addition to other Guarantees. Details will be provided in the invitation to tender (ITT).
Wichtigste Finanzierungsbedingungen und Zahlungsmodalitäten und/oder Verweis auf die einschlägigen Bestimmungen, die sie regeln: Details will be provided in the invitation to tender (ITT).
Rechtsform der Gruppe von Wirtschaftsteilnehmern, an die der Auftrag vergeben werden soll:
Two or more applicants may also form a grouping in the form of an application consortium in order to obtain an ITT. No specific legal form is required but the individual members of such a consortium should be jointly and separately liable for performance of the contract. The application and later bidder consortium shall remain unchanged throughout the whole procedure until the works have been completed. If unforeseen circumstances require a change in the composition of such consortium, the awarding authority may allow such change at its sole discretion provided that the change does not distort competition amongst the applicants.
Mehr anzeigen

Verfahren
Sprachen
Sprache: Deutsch 🗣️
Englisch 🗣️

Öffentlicher Auftraggeber
Kontakt
Kontaktperson: Herrn Voigt
Internetadresse: www.vattenfall.de 🌏
Name: DanTysk Offshore Wind GmbH c/o Vattenfall Europe AG
Kontaktperson: Angebotseingangsstelle
URL der Teilnahme: www.vattenfall.de 🌏

Referenz
Daten
Datum des Beginns: 2013-10-01 📅
Datum des Endes: 2017-12-31 📅

Ergänzende Informationen
Körper überprüfen
Name: Vergabekammer bei der Finanzbehörde Hamburg
Postanschrift: Gänsemarkt 36
Postort: Hamburg
Postleitzahl: 20354
Land: Deutschland 🇩🇪
Informationen zu Fristen für Nachprüfungsverfahren:
Appeals have to be done immediately; the undefined term “immediately” is hereby fixed on 5 calendar days. In accordance with § 107 Abs 3 S. 1 Nr 2, 3 and 4 GWB (Gesetz gegen Wettbewerbbeschränkungen; German Competition Act), a “Nachprüfungsantrag” (formal review proceedings) is inadmissible:
Mehr anzeigen
a) if violations of tender regulations that can be recognized in the announcement have not been complained against towards the tendering authority before the date referred to in the announcement for the submission of bids or applications (§ 107 Abs 3 S. 1 Nr 2 GWB).
Mehr anzeigen
b) if violations of tender regulations that can only be recognized in the tender documents have not been complained against towards the tendering authority before the date referred to in the announcement / the invitation to tender or applications (§ 107 Abs 3 S. 1 Nr 3 GWB).
Mehr anzeigen
c) if more than 15 calendar days have passed since the reply by the tendering authority that he will not remedy a complaint.
Quelle: OJS 2013/S 107-183779 (2013-06-03)
Ergänzende Angaben (2013-06-05)
Objekt
Metadaten der Bekanntmachung
Dokumenttyp: Ergänzende Angaben

Referenz
Daten
Absendedatum: 2013-06-05 📅
Veröffentlichungsdatum: 2013-06-07 📅
Kennungen
Bekanntmachungsnummer: 2013/S 109-186404
Verweist auf Bekanntmachung: 2013/S 107-183779
ABl. S-Ausgabe: 109
Quelle: OJS 2013/S 109-186404 (2013-06-05)
Bekanntmachung über vergebene Aufträge (2014-09-19)
Objekt
Metadaten der Bekanntmachung
Dokumenttyp: Bekanntmachung über vergebene Aufträge

Verfahren
Angebotsart: Entfällt

Öffentlicher Auftraggeber
Kontakt
Telefon: +49 40790222587 📞
Fax: +49 40790222504 📠

Referenz
Daten
Absendedatum: 2014-09-19 📅
Veröffentlichungsdatum: 2014-09-24 📅
Kennungen
Bekanntmachungsnummer: 2014/S 183-323991
ABl. S-Ausgabe: 183

Öffentlicher Auftraggeber
Kontakt
Kontaktperson: Herr Voigt
Quelle: OJS 2014/S 183-323991 (2014-09-19)