Collimators for X-ray Beamlines
The scope of work is to design, manufacture, test and deliver 16 collimators (5x ColA and 11x ColB) for the beam transport system of the European XFEL. For further details please refer to sec. 2 ‘Scope of work’ in the Specifications. Conceptual design review (CDR) and final design review (FDR) are required.
Collimators in beam transport system in European XFEL are the fixed apertures that define possible beam paths and protect downstream components. They cannot be moved remotely, some collimators are part of the personnel safety system.
The complete design should be finished in one month after signing the contract. Six months after the contract is awarded, the collimators should be ready for delivery.
Deadline
Die Frist für den Eingang der Angebote war 2016-02-16.
Die Ausschreibung wurde veröffentlicht am 2015-12-30.
Anbieter
Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:
Wer?
Wie?
Wo?
Geschichte der Beschaffung
Datum |
Dokument |
2015-12-30
|
Auftragsbekanntmachung
|
2016-03-17
|
Bekanntmachung über vergebene Aufträge
|