Offshore Wind Policy to cover the construction phase of the Offshore Windfarm Project ‘Trianel Windpark Borkum (Phase II)’ including the first operation phase
Subject matter of this tender is the insurance coverage for the construction of the Offshore Wind Farm Project ‘Trianel Windpark Borkum (Phase II)’ including coverage for the first operational phase (insurance lines as detailed below). The ‘Trianel Windpark Borkum (Phase II)’ Offshore Wind Farm Project comprises (including but not limited to)
— 32 wind turbines generators (Senvion 6.2M152 Power Upgrade, Nominal capacity 6.330 kW each) complete including but not limited to nacelles, blades, towers and foundations;
— Inter-Array cables/ Internal wind farm cabling;
— Connection to the existing Trianel Windkraftwerk Borkum Substation (owned by ‘Infrastruktur Windkraftwerk Borkum GmbH & Co. KG’)
(The existing OSS and TWB1 offshore wind farm is not part of this tender.).
Deadline
Die Frist für den Eingang der Angebote war 2016-11-28.
Die Ausschreibung wurde veröffentlicht am 2016-10-28.
Wer?
Wie?
Wo?
Geschichte der Beschaffung
Datum |
Dokument |
2016-10-28
|
Auftragsbekanntmachung
|