Wind Turbine Generator Project Engineering, Project Management, and Interface Management

Vattenfall Europe Windkraft GmbH

This tender concerns the provision of:
A. Electrical/Project Engineers and
B. Infrastructure Specialists (HVAC systems, helicopters, fueling, cranes, diesel generators and firefighting).
Typical tasks and responsibilities for both roles may include the provision of technical expertise on specific topics and/or portion(s) of offshore wind projects as defined by the Employer in the area of Grid Connections, Offshore Substations (OSS), Inner Array Cabling (IAC) and Infrastructure. Assignments will have a technical or technical/commercial focus and may take place at any point within the life of a project: development, procurement, design, manufacturing, construction, handover as a generating asset.
— Support of Electrical package manager or Technical Project Manager in technical contract handling from tendering till close-out of variations and claims.
— Administrative tasks within Electrical package e.g. document handling, taking minutes, action list etc. and act as deputy at times.
— Monitoring deliveries of supplier along time schedule and engage to support successful progress (for their relevant discipline).
— Ensure contractors are acting in accordance to expected HSE practice.
— Combine technical matters with contractual and commercial relevance.
— Preparation of project specific Employer Requirements and ITT documents including alignment with requirement owners. Take part in OSS or IAC procurement process including evaluation and negotiation of bids and final selection.
— Ensure that works are carried out in accordance with scope of supply and the Employers Requirements while meeting requirements of O&M.
— Conduct technical analysis of emerging matters e.g. involving internal and external experts.
— Take on handling of interfaces of Electrical package towards other project areas, e.g.
o Steer relevant input and ensure design optimization between Grid Connection Point, OSS, IAC, Foundation and WTG.
o Manage proper design and installation of electrical and/or infrastructure components between WTG and Grid Connection Point.
o Coordination of tasks related to grid code compliance and SCADA implementation.
o Exchange and solve all relevant matters towards OSS and IAC installation vessel.
— Prepare and align (with Quality Management and technical experts) program for supply chain review and quality surveillance activities for manufacturing phase and up to commissioning for Electrical package. Set and operate reporting and documentation flow, coordinate planning and activities of site inspectors and handle close-out of Non-conformities with components supplier.
— Implement aligned (with Certification Engineer) Certification requirements towards OSS and IAC supplier. Secure deliverables are technical conform and documents in expected quality to fulfill Certification requirements.
— Working as Electrical Project Engineer / Manager /Infrastructure within a team of other specialists in UK, Denmark and Germany.
Assignments will be based mainly in Vattenfall's London (UK), Kolding (DK) or Hamburg (GER) offices and potentially in Amsterdam (NL) and Solna (SE). Travel between offices and to other locations within Northern Europe will also be required.

Deadline

Die Frist für den Eingang der Angebote war 2017-03-20. Die Ausschreibung wurde veröffentlicht am 2017-02-17.

Anbieter

Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:

Wer? Wie? Wo?
  • • Danmark
  • Deutschland
  • • Nederland
  • • Sverige
  • • United Kingdom
Geschichte der Beschaffung
Datum Dokument
2017-02-17 Auftragsbekanntmachung
2018-03-05 Bekanntmachung über vergebene Aufträge
Auftragsbekanntmachung (2017-02-17)
Objekt
Umfang der Beschaffung
Titel: Projektmanagement im Bauwesen
Metadaten der Bekanntmachung
Originalsprache: Englisch 🗣️
Dokumenttyp: Auftragsbekanntmachung
Art des Auftrags: Dienstleistungen
Verordnung: Europäische Union
Gemeinsames Vokabular für öffentliche Aufträge (CPV)
Code: Projektmanagement im Bauwesen 📦

Verfahren
Verfahrensart: Verhandlungsverfahren
Angebotsart: Angebot für alle Lose
Vergabekriterien
Wirtschaftlichstes Angebot

Öffentlicher Auftraggeber
Identität
Land: Deutschland 🇩🇪
Art des öffentlichen Auftraggebers: Versorgungsunternehmen
Name des öffentlichen Auftraggebers: Vattenfall Europe Windkraft GmbH
Postanschrift: Überseering 12
Postleitzahl: 22297
Postort: Hamburg
Kontakt
E-Mail: ron.sperber@vattenfall.com 📧
Telefon: +31 655697751 📞

Referenz
Daten
Absendedatum: 2017-02-17 📅
Einreichungsfrist: 2017-03-20 📅
Veröffentlichungsdatum: 2017-02-21 📅
Kennungen
Bekanntmachungsnummer: 2017/S 036-066235
ABl. S-Ausgabe: 36
Zusätzliche Informationen

Objekt
Umfang der Beschaffung
Dienstleistungskategorie: 12
Geschätzter Wert ohne MwSt: 5 750 000 💰
6 250 000 💰
Kurze Beschreibung:
This tender concerns the provision of:
A. Electrical/Project Engineers and
B. Infrastructure Specialists (HVAC systems, helicopters, fueling, cranes, diesel generators and firefighting).
Typical tasks and responsibilities for both roles may include the provision of technical expertise on specific topics and/or portion(s) of offshore wind projects as defined by the Employer in the area of Grid Connections, Offshore Substations (OSS), Inner Array Cabling (IAC) and Infrastructure. Assignments will have a technical or technical/commercial focus and may take place at any point within the life of a project: development, procurement, design, manufacturing, construction, handover as a generating asset.
Mehr anzeigen
— Support of Electrical package manager or Technical Project Manager in technical contract handling from tendering till close-out of variations and claims.
— Administrative tasks within Electrical package e.g. document handling, taking minutes, action list etc. and act as deputy at times.
— Monitoring deliveries of supplier along time schedule and engage to support successful progress (for their relevant discipline).
— Ensure contractors are acting in accordance to expected HSE practice.
— Combine technical matters with contractual and commercial relevance.
— Preparation of project specific Employer Requirements and ITT documents including alignment with requirement owners. Take part in OSS or IAC procurement process including evaluation and negotiation of bids and final selection.
— Ensure that works are carried out in accordance with scope of supply and the Employers Requirements while meeting requirements of O&M.
— Conduct technical analysis of emerging matters e.g. involving internal and external experts.
— Take on handling of interfaces of Electrical package towards other project areas, e.g.
o Steer relevant input and ensure design optimization between Grid Connection Point, OSS, IAC, Foundation and WTG.
o Manage proper design and installation of electrical and/or infrastructure components between WTG and Grid Connection Point.
o Coordination of tasks related to grid code compliance and SCADA implementation.
o Exchange and solve all relevant matters towards OSS and IAC installation vessel.
— Prepare and align (with Quality Management and technical experts) program for supply chain review and quality surveillance activities for manufacturing phase and up to commissioning for Electrical package. Set and operate reporting and documentation flow, coordinate planning and activities of site inspectors and handle close-out of Non-conformities with components supplier.
Mehr anzeigen
— Implement aligned (with Certification Engineer) Certification requirements towards OSS and IAC supplier. Secure deliverables are technical conform and documents in expected quality to fulfill Certification requirements.
— Working as Electrical Project Engineer / Manager /Infrastructure within a team of other specialists in UK, Denmark and Germany.
Assignments will be based mainly in Vattenfall's London (UK), Kolding (DK) or Hamburg (GER) offices and potentially in Amsterdam (NL) and Solna (SE). Travel between offices and to other locations within Northern Europe will also be required.
Zahl der möglichen Verlängerungen: 2
Zeitlicher Rahmen für nachfolgende Aufträge: 24 Monate
Referenznummer: Wind Turbine Generator Project Engineering, Project Management, and Interface Management
Ort der Leistung
Hauptstandort oder Erfüllungsort: DE, DK, NL, SE, UK.

Rechtliche, wirtschaftliche, finanzielle und technische Informationen
Bedingungen für die Teilnahme
Wirtschaftliche und finanzielle Leistungsfähigkeit:
Your company must have taken out liability insurance that at the time of application is valid for at least 6 more months, with a minimum cover of 1 million EUR per event or you must provide for such insurance in case of contract award.
Technische und berufliche Fähigkeiten:
Requirements will vary depending on specific tasks/responsibilities but in order to fulfill the works candidates must at least have:
A. WTG Project Manager.
University degree in mechanical or electrical engineering or other relevant discipline.
Min 7 years of broad technical experience within the wind turbine industry.
Min 3 years experience in offshore wind farm development and construction.
Good understanding of WTG technology and main components e.g. drivetrains, blades and electrical generation.
Background within a complex multidisciplinary project environment.
Motivated to work in a multinational working environment.
High degree of self-motivation with a flexible approach to work.
B. WTG Project Engineer.
Degree-qualified mechanical or electrical engineer or other relevant discipline.
Min 3 years of broad technical experience within the wind turbine industry.
Understanding of WTG technology and main components e.g. drivetrains, blades and electrical generation.
Experience within a complex multidisciplinary project environment
C. Interface Manager.
University degree in engineering or other relevant discipline.
Min 5 years of broad technical experience within the wind turbine.
industry or very closely related industry.
Minimum 2 years experience in offshore wind farm development and construction.
Strong communication skills and flexible approach to work.
Auftragsausführung
Geforderte Kautionen und Garantien: None.
Wichtigste Finanzierungsbedingungen und Zahlungsmodalitäten und/oder Verweis auf die einschlägigen Bestimmungen, die sie regeln: Detailed information in the Selection Guide on the Commerce-Hub website.
Rechtsform der Gruppe von Wirtschaftsteilnehmern, an die der Auftrag vergeben werden soll: Detailed information in the Selection Guide on the Commerce-Hub website.
Sonstige besondere Bedingungen:
Detailed information in the Selection Guide on the Commerce-Hub website.
Your organisation must have a back office with key personnel in North/West Europe from which knowledge and lessons learned are transferred, and where there shall be a single point of contact for Vattenfall.
There must be minimum 3 consultants directly employed (on your own payroll) in each role mentioned in III.2.3 of this contract notice.

Verfahren
Höchstzahl der Wirtschaftsteilnehmer der Rahmenvereinbarung: 4
Laufzeit der Rahmenvereinbarung in Jahren: 4
Sprachen
Sprache: Englisch 🗣️

Öffentlicher Auftraggeber
Kontakt
Kontaktperson: Ron Sperber
Name: Vattenfall Europe Windkraft GmbH
https://portal.commerce-hub.com/index.cfm?action=sourcing:__requestform.subscribe&document=F2C71EDB-FAEA-FD64-B94845C1EB39989D
Postanschrift: Hoekenrode 8, Amsterdam
Postort: Amsterdam
Postleitzahl: 1102 BR
Land: Niederlande 🇳🇱
URL der Dokumente: www.commerce-hub.com 🌏
Postanschrift: Hoekenrode 8
URL der Teilnahme: https://portal.commerce-hub.com/index.cfm?action=sourcing:__requestform.subscribe&document=F2C71EDB-FAEA-FD64-B94845C1EB39989D 🌏

Ergänzende Informationen
Körper überprüfen
Name: Vergabekammer Hamburg, Finanzbehörde für die Vergabe von Lieferungen und Dienstleistungen
Postanschrift: Große Bleichen 27
Postort: Hamburg
Postleitzahl: 20354
Land: Deutschland 🇩🇪
Telefon: +49 40428231448 📞
Fax: +49 40428232020 📠
Informationen zu Fristen für Nachprüfungsverfahren:
According to § 160 III s. 1 no. 1 — 4 German Competition Act (GWB) an appeal is inadmissible,
a) if the appellant has recognised the breach of tender rules prior to filing the appeal and did not claim this towards the contracting entity within 10 calendar days; the expiry of the deadline according to § 134 II remains unaffected (§ 160 III s. 1 no. 1 GWB);
Mehr anzeigen
b) as far as breaches of tender rules, recognisable based on the tender notice, has not been claimed towards the contracting entity at the latest by the expiry of the deadline for filing the bid or for the request for participating notified in the notice (§ 160 III s. 1 no. 2 GWB);
Mehr anzeigen
c) as far as breaches of tender rules which are recognisable only within the specifications / request for quotation have not been claimed towards the contracting entity at the latest by the expiry of the deadline notified in the tender notice / request for quotation for filing the bid or for filing the request for participating (§160 III s. 1 no. 3 GWB);
Mehr anzeigen
d) as far as more than 15 calendar days following the contracting entity's notice not to remedy the complaint have passed (§160 III s. 1 no. 4 GWB).
Dienststelle, bei der Informationen über das Überprüfungsverfahren eingeholt werden können
Wie: Körper überprüfen
Quelle: OJS 2017/S 036-066235 (2017-02-17)
Bekanntmachung über vergebene Aufträge (2018-03-05)
Objekt
Metadaten der Bekanntmachung
Dokumenttyp: Bekanntmachung über vergebene Aufträge

Verfahren
Verfahrensart: Nicht offenes Verfahren
Angebotsart: Entfällt

Referenz
Daten
Absendedatum: 2018-03-05 📅
Veröffentlichungsdatum: 2018-03-08 📅
Kennungen
Bekanntmachungsnummer: 2018/S 047-104450
Verweist auf Bekanntmachung: 2017/S 036-066235
ABl. S-Ausgabe: 47

Objekt
Umfang der Beschaffung
Geschätzter Wert ohne MwSt: 5 750 000,00 💰
6 250 000,00 💰
Ort der Leistung
Hauptstandort oder Erfüllungsort: DK, DE, NL, SE, UK
Quelle: OJS 2018/S 047-104450 (2018-03-05)