The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2,7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW. N1 wants to enter into a Service- and maintenance agreement (SMA) with a long-term full-scope service for the 54 WTGs, starting from 7.12.2020 until 6.12.2027. The main tasks of the scope will be maintenance (scheduled and unscheduled), inspection and repair of components including major components, management of spare parts, documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the wind farm running safe and sustainable, including full logistics, base infrastructure, spare part procurement, monitoring and control.
Deadline
Die Frist für den Eingang der Angebote war 2020-01-17.
Die Ausschreibung wurde veröffentlicht am 2019-11-22.
Auftragsbekanntmachung (2019-11-22) Objekt Umfang der Beschaffung
Titel: Windenergieanlagen
Referenznummer: 5940/2019
Kurze Beschreibung:
The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2,7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW.
N1 wants to enter into a Service- and maintenance agreement (SMA) with a long-term full-scope service for the 54 WTGs, starting from 7.12.2020 until 6.12.2027. The main tasks of the scope will be maintenance (scheduled and unscheduled), inspection and repair of components including major components, management of spare parts, documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the wind farm running safe and sustainable, including full logistics, base infrastructure, spare part procurement, monitoring and control.
The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2,7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW.
N1 wants to enter into a Service- and maintenance agreement (SMA) with a long-term full-scope service for the 54 WTGs, starting from 7.12.2020 until 6.12.2027. The main tasks of the scope will be maintenance (scheduled and unscheduled), inspection and repair of components including major components, management of spare parts, documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the wind farm running safe and sustainable, including full logistics, base infrastructure, spare part procurement, monitoring and control.
Metadaten der Bekanntmachung
Originalsprache: Englisch 🗣️
Dokumenttyp: Auftragsbekanntmachung
Art des Auftrags: Dienstleistungen
Verordnung: Europäische Union, mit GPA-Beteiligung
Gemeinsames Vokabular für öffentliche Aufträge (CPV)
Code: Windenergieanlagen📦
Zusätzlicher CPV-Code: Offshore-Dienste📦 Ort der Leistung
NUTS-Region: Aurich
🏙️
Verfahren
Verfahrensart: Verhandlungsverfahren
Angebotsart: Angebot für alle Lose
Vergabekriterien
Wirtschaftlichstes Angebot
Referenz Daten
Absendedatum: 2019-11-22 📅
Einreichungsfrist: 2020-01-17 📅
Veröffentlichungsdatum: 2019-11-26 📅
Datum des Beginns: 2020-12-07 📅
Datum des Endes: 2027-12-06 📅
Kennungen
Bekanntmachungsnummer: 2019/S 228-560804
ABl. S-Ausgabe: 228
Zusätzliche Informationen
Notices-ID: CXP4YYVD5QA
Objekt Umfang der Beschaffung
Kurze Beschreibung:
The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2,7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW.
The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2,7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW.
N1 wants to enter into a Service- and maintenance agreement (SMA) with a long-term full-scope service for the 54 WTGs, starting from 7.12.2020 until 6.12.2027. The main tasks of the scope will be maintenance (scheduled and unscheduled), inspection and repair of components including major components, management of spare parts, documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the wind farm running safe and sustainable, including full logistics, base infrastructure, spare part procurement, monitoring and control.
N1 wants to enter into a Service- and maintenance agreement (SMA) with a long-term full-scope service for the 54 WTGs, starting from 7.12.2020 until 6.12.2027. The main tasks of the scope will be maintenance (scheduled and unscheduled), inspection and repair of components including major components, management of spare parts, documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the wind farm running safe and sustainable, including full logistics, base infrastructure, spare part procurement, monitoring and control.
See above and the call for competition (CfC).
Beschreibung der Verlängerungen: Subject to negotiations.
Beschreibung der Optionen: Subject to negotiations.
Bezeichnung des von der EU finanzierten Projekts oder Programms: NER 300
Ort der Leistung
Hauptstandort oder Erfüllungsort: Offshore Wind Farm Nordsee One.
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Befähigung zur Berufsausübung:
1) Extract from the commercial register (or comparable document) if registration in such a register is required by law according to the candidates' or the members of the consortium's country of origin.
Wirtschaftliche und finanzielle Leistungsfähigkeit:
1) Description of the candidate's or the members' of the consortium's legal structure and liability;
2) Candidate's or members' of the consortium turnover during the last 3 financial years;
3) Annual financial statement, financial reports or balance sheet of the last 3 financial years;
4) Commitment to provide parental company guarantees during the bidding phase or comparable collateral.
Technische und berufliche Fähigkeiten:
1) Company presentation (qualified personnel, relevant technical equipment etc.);
2) Presentation of references for comparable services;
3) HSE statistics for the last 3 years including LTI (lost time injuries, in relation to the total number of hours worked);
4) Information on the management systems for QHSE, together with proof for the relevant certification. If no certification might be available, the candidate shall provide a presentation and/or general information on the status of the management systems and (if planned) a milestone schedule for the certification process.
4) Information on the management systems for QHSE, together with proof for the relevant certification. If no certification might be available, the candidate shall provide a presentation and/or general information on the status of the management systems and (if planned) a milestone schedule for the certification process.
Liste und kurze Beschreibung der Regeln und Kriterien: See call for competition (CfC).
Auftragsausführung
Geforderte Kautionen und Garantien: See call for competition (CfC).
Wichtigste Finanzierungsbedingungen und Zahlungsmodalitäten und/oder Verweis auf die einschlägigen Bestimmungen, die sie regeln: See call for competition (CfC).
Verfahren
Rechtsgrundlage: 32014L0025
Mindestzahl der Bewerber: 3
Höchstzahl der Bewerber: 5
Objektive Kriterien für die Auswahl der begrenzten Anzahl von Bewerbern: See the call for competition (CfC).
Zeitpunkt des Eingangs der Angebote: 11:00
Datum der Absendung der Aufforderungen: 2020-02-14 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Deutsch 🗣️
Englisch 🗣️
Gültigkeitsdauer des Angebots: 2 Monate