On behalf of the Indonesian Government and the German Federal Ministry of Economic Cooperation and Development (BMZ), the Indonesian Ministry of National Development Planning (Bappenas), together with GIZ as implementing agency, set up a joint project that works at the national level and sub national level.
The objective:
Strengthen the capacities and collaboration of state and non-state actors for implementing Agenda 2030 in Indonesia and in Indonesian South-South and Triangular Cooperation.
The project has 2 outputs, namely:
1) The implementation of the sustainable development goals in Indonesia has been strengthened;
2) Indonesian capacities for the engagement of SDGs in the global context through South-South and Triangular Cooperation are strengthened political partner of the project is the Indonesian Ministry of National Development Planning (Bappenas) in coordination with the National Coordination Team of South-South Cooperation Indonesia (NCT SSC) and or the Task Force for Indonesian AID which is chaired by Ministry of Foreign Affairs.
Deadline
Die Frist für den Eingang der Angebote war 2020-12-10.
Die Ausschreibung wurde veröffentlicht am 2020-11-09.
Anbieter
Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:
Objekt Umfang der Beschaffung
Titel:
“81262831-Strengthening Monitoring, Reporting and Implementation of SDGs in Indonesia
81262831”
Produkte/Dienstleistungen: Mit Entwicklungsprojekten verbundene Verwaltungsdienstleistungen📦
Kurze Beschreibung:
“On behalf of the Indonesian Government and the German Federal Ministry of Economic Cooperation and Development (BMZ), the Indonesian Ministry of National...”
Kurze Beschreibung
On behalf of the Indonesian Government and the German Federal Ministry of Economic Cooperation and Development (BMZ), the Indonesian Ministry of National Development Planning (Bappenas), together with GIZ as implementing agency, set up a joint project that works at the national level and sub national level.
The objective:
Strengthen the capacities and collaboration of state and non-state actors for implementing Agenda 2030 in Indonesia and in Indonesian South-South and Triangular Cooperation.
The project has 2 outputs, namely:
1) The implementation of the sustainable development goals in Indonesia has been strengthened;
2) Indonesian capacities for the engagement of SDGs in the global context through South-South and Triangular Cooperation are strengthened political partner of the project is the Indonesian Ministry of National Development Planning (Bappenas) in coordination with the National Coordination Team of South-South Cooperation Indonesia (NCT SSC) and or the Task Force for Indonesian AID which is chaired by Ministry of Foreign Affairs.
Mehr anzeigen
Geschätzter Wert ohne MwSt: EUR 455 800 💰
1️⃣
Zusätzliche Produkte/Dienstleistungen: Beratung in Sachen Evaluierung📦
Ort der Leistung: 00 🏙️
Hauptstandort oder Erfüllungsort: Indonesia.
Beschreibung der Beschaffung:
“The contractor is asked to provide short term expertise for consulting services for different fields of actions to contribute to the achievement of the...”
Beschreibung der Beschaffung
The contractor is asked to provide short term expertise for consulting services for different fields of actions to contribute to the achievement of the module goal indicator 1 and 3, in specifically to the achievement of Output 1 below:
Modul goal indicator 1: a new procedure for monitoring and reporting on the implementation of 2030 Agenda in Indonesia, which includes new guidelines and implementation at the national and sub-national level, has been applied.
Baseline value: no new method for monitoring and reporting on the implementation of the 2030 Agenda
Target value: 1 new procedure for monitoring and Reporting on the implementation of the agenda Applied in 2030
Modul goal indicator 3: Indonesia and Germany have jointly presented the results of their cooperation on the 2030 Agenda at 2 International events between 2020 and 2023
Baseline value: 3 joint presentations
Target value: 5 joint presentations
Output 1: The Implementation of the Sustainable Development Goals in Indonesia has been strengthened.
Output indicator 1.1: A new standard procedure or similar document on topics such as setting up and work in multi-actor partnerships or mobilizing additional resources for implementation of the sustainable development goals especially at the provincial level is approved by Bappenas.
Base value: no standard procedure
Target value: 1 standard procedure
Output indicator 1.2: Bappenas has approved 8 annual monitoring reports from 4 formally established multi-actor provincial partnerships.
Base value: no annual monitoring reports approved
Target value: 8 annual monitoring reports approved
The contractor is responsible for providing the following work package and the accompanying milestones:
Output 1 advises the National SDG Secretariat on the development of a standard process for the formal establishment of multi-stakeholder partnerships at provincial level. On the basis of this advice, the National Secretariat prepares a draft of the relevant regulation and adopts it in consultation with other national actors in the implementation of the 2030 Agenda. Subsequently, the project accompanies the application of these rules in the provinces, in which the creation of a total of four institutionalized multi-stakeholder partnerships in the environmental field. In particular, account will be taken of the requirements for capacity development in provincial governments and the different needs and interests of different non-state actors. The formalized multi-stakeholder partners hips in the provinces evaluate their experiences in joint monitoring reports. These will then be discussed and accepted at national level.
Mehr anzeigen Vergabekriterien
Der Preis ist nicht das einzige Zuschlagskriterium, und alle Kriterien werden nur in den Auftragsunterlagen genannt
Umfang der Beschaffung
Geschätzter Gesamtwert ohne MwSt: EUR 455 800 💰
Dauer
Datum des Beginns: 2021-03-01 📅
Datum des Endes: 2023-03-31 📅
Laufzeit des Vertrags, der Rahmenvereinbarung oder des dynamischen Beschaffungssystems
Dieser Vertrag ist verlängerbar ✅ Beschreibung
Beschreibung der Verlängerungen:
“GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender....”
Beschreibung der Verlängerungen
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Mehr anzeigen Informationen über Optionen
Optionen ✅
Beschreibung der Optionen:
“GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender....”
Beschreibung der Optionen
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Liste und kurze Beschreibung der Bedingungen:
“1) Trading name and address, commercial register number.
2) Eligibility declaration that no grounds for exclusion in Section 123, 124 of the German Act...”
Liste und kurze Beschreibung der Bedingungen
1) Trading name and address, commercial register number.
2) Eligibility declaration that no grounds for exclusion in Section 123, 124 of the German Act Against Restraints of Competition (GWB) apply.
3) Eligibility declaration subcontractors if applicable.
4) Association clause if applicable.
Mehr anzeigen Wirtschaftliche und finanzielle Leistungsfähigkeit
Liste und kurze Beschreibung der Auswahlkriterien:
“1) Average annual turnover for the last 3 years: at least EUR 300 000.00.
2) Number of employees as at 31.12 of the previous year: at least 5 persons.” Bedingungen für die Teilnahme
“1) Average annual turnover for the last 3 years: at least EUR 300 000.00.
2) Number of employees as at 31.12 of the previous year: at least 5 persons.” Technische und berufliche Fähigkeiten
Liste und kurze Beschreibung der Auswahlkriterien:
“1) At least 3 reference projects in the technical field of development monitoring and reporting and at least 3 reference projects in Indonesia in the last 3...”
Liste und kurze Beschreibung der Auswahlkriterien
1) At least 3 reference projects in the technical field of development monitoring and reporting and at least 3 reference projects in Indonesia in the last 3 years.
2) The technical assessment is only based on reference projects with a minimum commission value of EUR 50 000.00 EUR.
Mehr anzeigen Bedingungen für die Teilnahme
Bedingungen für die Teilnahme (technische und berufliche Fähigkeiten):
“1) At least 3 reference projects in the technical field of development monitoring and reporting and at least 3 reference projects in Indonesia in the last 3...”
Bedingungen für die Teilnahme (technische und berufliche Fähigkeiten)
1) At least 3 reference projects in the technical field of development monitoring and reporting and at least 3 reference projects in Indonesia in the last 3 years.
2) The technical assessment is only based on reference projects with a minimum commission value of EUR 50 000.00.
Verfahren Art des Verfahrens
Offenes Verfahren
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2020-12-10
12:00 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Das Angebot muss gültig sein bis: 2021-03-31 📅
Bedingungen für die Öffnung der Angebote: 2020-12-10
12:00 📅
Ergänzende Informationen Informationen über elektronische Arbeitsabläufe
Die elektronische Bestellung wird verwendet
Zusätzliche Informationen
“Communication/questions can only be submitted using GIZ4s eProcurement Tender Platform for the award of contracts.
Notice-ID: CXTRYY6YBPX” Körper überprüfen
Name: Die Vergabekammern des Bundes
Postanschrift: Villemombler Straße 76
Postort: Bonn
Postleitzahl: 53123
Land: Deutschland 🇩🇪
Telefon: +49 2289499-0📞
E-Mail: vk@bundeskartellamt.bund.de📧
Fax: +49 2289499-163 📠
URL: https://www.bundeskartellamt.de🌏 Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
“According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as:
1) The...”
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as:
1) The applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected.
2) Complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3) Complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4) More than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Mehr anzeigen
Quelle: OJS 2020/S 222-544727 (2020-11-09)
Bekanntmachung über vergebene Aufträge (2021-03-09) Objekt Umfang der Beschaffung
Kurze Beschreibung:
“On behalf of the Indonesian Government and the German Federal Ministry of Economic Cooperation and Development (BMZ), the Indonesian Ministry of National...”
Kurze Beschreibung
On behalf of the Indonesian Government and the German Federal Ministry of Economic Cooperation and Development (BMZ), the Indonesian Ministry of National Development Planning (Bappenas), together with GIZ as implementing agency, set up a joint project that works at the national level and sub national level.
The objective:
Strengthen the capacities and collaboration of state and non-state actors for implementing Agenda 2030 in Indonesia and in Indonesian South-South and Triangular Cooperation.
The project has 2 outputs, namely:
1) The implementation of the Sustainable Development Goals in Indonesia has been strengthened;
2) Indonesian capacities for the engagement of SDGs in the global context through South-South and Triangular Cooperation are strengthened.
Political partner of the project is the Indonesian Ministry of National Development Planning (Bappenas) in coordination with the National Coordination Team of South-South Cooperation Indonesia (NCT SSC) and or the Task Force for Indonesian AID which is chaired by Ministry of Foreign Affairs.
Mehr anzeigen
Gesamtwert der Beschaffung (ohne MwSt.): EUR 505 600 💰
Beschreibung
Ort der Leistung: id 🏙️
Hauptstandort oder Erfüllungsort: 00000 Indonesia.
Beschreibung der Beschaffung:
“The contractor is asked to provide short term expertise for consulting services for different fields of actions to contribute to the achievement of the...”
Beschreibung der Beschaffung
The contractor is asked to provide short term expertise for consulting services for different fields of actions to contribute to the achievement of the module goal indicator 1 and 3, in specifically to the achievement of Output 1 below:
Module goal indicator 1: A new procedure for monitoring and reporting on the implementation of 2030 Agenda in Indonesia, which includes new guidelines and implementation at the national and sub-national level, has been applied.
Baseline value: no new method for monitoring and reporting on the implementation of the 2030 Agenda
Target value: 1 new procedure for monitoring and Reporting on the implementation of the agenda Applied in 2030.
Module goal indicator 3: Indonesia and Germany have jointly presented the results of their cooperation on the 2030 Agenda at 2 International events between 2020 and 2023.
Baseline value: 3 joint presentations.
Target value: 5 joint presentations.
Output 1: The implementation of the sustainable development goals in Indonesia has been strengthened.
Output indicator 1.1: A new standard procedure or similar document on topics such as setting up and work in multi-actor partnerships or mobilizing additional resources for implementation of the sustainable development goals especially at the provincial level is approved by Bappenas.
Base value: no standard procedure.
Target value: 1 standard procedure.
Output indicator 1.2: Bappenas has approved 8 annual monitoring reports from 4 formally established multi-actor provincial partnerships.
Base value: no annual monitoring reports approved.
Target value: 8 annual monitoring reports approved.
The contractor is responsible for providing the following work package and the accompanying milestones:
Output 1 advises the National SDG Secretariat on the development of a standard process for the formal establishment of multi-stakeholder partnerships at provincial level. On the basis of this advice, the National Secretariat prepares a draft of the relevant regulation and adopts it in consultation with other national actors in the implementation of the 2030 Agenda. Subsequently, the project accompanies the application of these rules in the provinces, in which the creation of a total of four institutionalized multi-stakeholder partnerships in the environmental field. In particular, account will be taken of the requirements for capacity development in provincial governments and the different needs and interests of different non-state actors. The formalized multi-stakeholder partners hips in the provinces evaluate their experiences in joint monitoring reports. These will then be discussed and accepted at national level.
Verfahren Administrative Informationen
Frühere Veröffentlichungen zu diesem Verfahren: 2020/S 222-544727
Auftragsvergabe
1️⃣
Vertragsnummer: 1
Titel:
“Auftragsvergabe Consortium of GFA Consulting Group GmbH — PT ANDALAS MITRA CAGAR (AMC)”
Datum des Vertragsabschlusses: 2021-03-09 📅
Informationen über Ausschreibungen
Anzahl der eingegangenen Angebote: 2
Anzahl der eingegangenen Angebote von KMU: 0
Anzahl der eingegangenen Angebote von Bietern aus anderen EU-Mitgliedstaaten: 0
Anzahl der eingegangenen Angebote von Bietern aus Nicht-EU-Mitgliedstaaten: 0
Anzahl der auf elektronischem Wege eingegangenen Angebote: 2
Der Auftrag wurde an eine Gruppe von Wirtschaftsteilnehmern vergeben ✅ Name und Anschrift des Auftragnehmers
Name: GFA Consulting Group GmbH
Postort: Hamburg
Land: Deutschland 🇩🇪
Region: Hamburg🏙️
Der Auftragnehmer ist ein KMU
Name: Pt andalas mitra cagar (amc)
Postort: Jakarta
Land: Indonesien 🇮🇩
Region: id 🏙️
Der Auftragnehmer ist ein KMU ✅ Angaben zum Wert des Auftrags/der Partie (ohne MwSt.)
Gesamtwert des Auftrags/Loses: EUR 505.60 💰
Ergänzende Informationen Zusätzliche Informationen
Notices-ID: CXTRYY6Y038
Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
“According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1) The...”
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1) The applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected;
2) Complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice;
3) Complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids;
4) More than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Mehr anzeigen
Quelle: OJS 2021/S 050-125651 (2021-03-09)