The EnBW He Dreiht GmbH seeks to contract the scope of the inter array cables work package. This scope includes the engineering, procurement, installation and commissioning of the array cables.
Deadline
Die Frist für den Eingang der Angebote war 2021-01-08.
Die Ausschreibung wurde veröffentlicht am 2020-11-20.
Objekt Umfang der Beschaffung
Titel:
“Offshore Wind Farm (OWF) He Dreiht — Lot Inner Array Grid (IAG) EPCI
EnBW-2020-0089”
Produkte/Dienstleistungen: Installation von Elektrizitätsverteilungseinrichtungen📦
Kurze Beschreibung:
“The EnBW He Dreiht GmbH seeks to contract the scope of the inter array cables work package. This scope includes the engineering, procurement, installation...”
Kurze Beschreibung
The EnBW He Dreiht GmbH seeks to contract the scope of the inter array cables work package. This scope includes the engineering, procurement, installation and commissioning of the array cables.
1️⃣
Zusätzliche Produkte/Dienstleistungen: Einsatz von Kabellegerschiffen📦
Zusätzliche Produkte/Dienstleistungen: Seekabel📦
Zusätzliche Produkte/Dienstleistungen: Hochspannungskabel📦
Ort der Leistung: Hamburg🏙️
Ort der Leistung: 00 🏙️
Hauptstandort oder Erfüllungsort: German EEZ north sea cluster 7.
Beschreibung der Beschaffung:
“The assumed scope will comprises between 90 km and 120 km of array cable divided in up to 70 individual cable connections. The detailed scope is subject to...”
Beschreibung der Beschaffung
The assumed scope will comprises between 90 km and 120 km of array cable divided in up to 70 individual cable connections. The detailed scope is subject to change but will likely include the following works (including all associated (required) engineering works, studies, method statements, documentations, interface engineering etc.):
1) pre-lay geophysical route survey;
2) pre-lay geotechnical route survey;
3) procurement of array cables;
4) procurement of cable protection system (CPS);
5) procurement of accessories;
6) pre-lay grapnel run (PLGR);
7) salvage of out of service cable ODIN1 incl. detection survey;
8) onshore fitting-test trials;
9) cable loadout and transport to site;
10) CPS loading and transport to site;
11) installation of cable crossings at AC-1 cable (incl. procurement of required material);
12) cable Laying (incl. cable route design);
13) cable trenching (incl. burial assessment study (BAS) and in-/out-survey);
14) procurement and installation of messenger wires;
15) installation of CPS;
16) cable pull-in, routing, stripping and termination at foundations and converter;
17) cable testing;
18) fibre-optic routing, termination and testing;
19) as-built survey (video and depth of cover);
20) spare cable delivery to a Northern European seaport.
Mehr anzeigen Vergabekriterien
Der Preis ist nicht das einzige Zuschlagskriterium, und alle Kriterien werden nur in den Auftragsunterlagen genannt
Dauer
Datum des Beginns: 2022-01-03 📅
Datum des Endes: 2025-12-30 📅
Informationen über die Begrenzung der Zahl der einzuladenden Bewerber
Vorgesehene Mindestanzahl: 3
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Liste und kurze Beschreibung der Bedingungen: See qualification questionnaire and ‘Fragebogen zur Eignungsprüfung’.
Wirtschaftliche und finanzielle Leistungsfähigkeit
Liste und kurze Beschreibung der Auswahlkriterien:
“Data protection according to German Federal Data Protection Act (BDSG) and DSGVO
Is the Federal Data Protection Act (BDSG) in combination with the General...”
Liste und kurze Beschreibung der Auswahlkriterien
Data protection according to German Federal Data Protection Act (BDSG) and DSGVO
Is the Federal Data Protection Act (BDSG) in combination with the General Data Protection Regulation (DSGVO) in its most recent version applicable for your products and services?
— If yes, can you confirm to act according to the valid Federal Data Protection Act in the event of an order?
Legal Information/Insurance
Are there any judgments, claims, arbitration proceedings or other pending proceedings/claims against your company or, if professionally arranged, its employees or legal representatives?
Are your company shareholder of an utility?
Has your company taken out business liability insurance?
Is personal damage covered by the insurance?
— coverage (in Euro)
Is material damage covered by the insurance?
— coverage (in Euro)
Is property damage covered by the insurance?
— coverage (in Euro)
Has your company environmental protection insurance in place?
— coverage (in Euro)
Quality management
Is a quality management system in place in your company?
Is your QM certified?
Is there a quality management officer in your company?
Environmental management
Is an environmental management system in place in your company?
Is your environmental management system certified?
Is there an environmental management officer in your company?
Does your company document environmental protection measures and results?
Are there pending proceedings against your company for environmental violations?
Measures for climate protection and environmental sustainability must be specified or described by the applicant himself as well as by the reference.
Occupational health and safety
Is an occupational health and safety in place in your company?
Has your company implemented a system to monitor and/or reviewing compliance with Occupational health and safety standards?
Is the evaluation and selection of subcontractors based on occupational health and safety standards?
Corporate social responsibility
Social and ethical standards with regard to your suppliers/sub-suppliers
Do you require your sub-suppliers to commit to principles of internationally recognized social or ethical standards?
Can your company demonstrate that compliance with internationally accepted labour standards are taken into account when evaluating and selecting sub-suppliers?
“Missing evidence may lead to exclusion from further proceedings
See also ‘Fragebogen zur Eignungsprüfung’ and qualification questionnaire.” Technische und berufliche Fähigkeiten
Liste und kurze Beschreibung der Auswahlkriterien:
“Proof of project work during the last 4 years regarding planing, engineering and design, production (or procurement and control of production) and...”
Liste und kurze Beschreibung der Auswahlkriterien
Proof of project work during the last 4 years regarding planing, engineering and design, production (or procurement and control of production) and installation of submarine power cables (Inter Array Cables or Export Cables) with DP2 vessels for offshore wind parks
Proof of experience as EPCI contractor for array cable projects. Or as an alternative extensive experience as EPCI contractor for any type of submarine cable in combination with experience as installation contractor for array cable projects (minimum 2 projects during last 5 years — one of the 2 references shall be not older than 1 year).
Proof (self-declaration) of access to/and availability of:
— engineering/design capacities;
— production and storage capacities for minimum voltage 66 kV submarine array cable with a total windpark length > 100 km and a minimum production length without factory joints of 1500 m, possibility of fabrication in different cross-sections;
— production and storage capacities for adequate cable protections systems (CPS);
— installation tools and devices and sea going vessels;
— installation and commissioning capacities.
To be able to meet the given timeline assumptions
Proof of production of minimum of 100 km cable according to the following standards:
— DIN VDE 0276-620:2010-11,
— DIN VDE 0278-629-1:2009-07,
— DIN EN 61442; VDE 0278-442:2006-01,
— IEC 60502-2 Ed. 3.0,
— IEC 60502-4.
Alternatively, equivalent standards for high voltage cables maybe proposed for consideration if criterion cannot be met otherwise.
Proof (self -declaration) that cables will be manufactured and stored closer to the project site than 4 000 nautical miles of sea route distance.
Prove that the company has an appropriate number of qualified employees which are required to provide the required service, job profiles shall be attached as examples.
Presentation of the usual ordering, delivery, service and acceptance processes
Designation of any subcontractors, including their address.
Annual financial reports for the past 3 years.
Commercial register extract
Reference list with at least 5 reference customers, about the significant assignments that were comparable in terms of content and scope in the last 5 financial years and a brief description stating the client, the order content and the order volume, including a contact person and their contact details.
Mehr anzeigen Bedingungen für die Teilnahme
Bedingungen für die Teilnahme (technische und berufliche Fähigkeiten):
“Missing evidence may lead to exclusion from further proceedings
See also ‘Fragebogen zur Eignungsprüfung’ and qualification questionnaire.”
Liste und kurze Beschreibung der Regeln und Kriterien:
“The eligibility criteria differentiate between two categories elimination criteria’s and criteria for information. The respective achievement of a criterion...”
Liste und kurze Beschreibung der Regeln und Kriterien
The eligibility criteria differentiate between two categories elimination criteria’s and criteria for information. The respective achievement of a criterion of eligibility in the context of the evaluation is determined based on the attachments and documents submitted by the applicant or the information given therein.
See also tender guideline.
Mehr anzeigen
Geforderte Kautionen und Garantien: See tender guideline.
Wichtigste Finanzierungsbedingungen und Zahlungsmodalitäten und/oder Verweis auf die einschlägigen Bestimmungen, die sie regeln: See tender guideline.
Rechtsform der Gruppe von Wirtschaftsteilnehmern, an die der Auftrag vergeben werden soll:
“Bidder consortia are obliged under § 50 Abs. 3 SektVO to set up a joint company in the legal form of the GmbH or the GmbH & Co. KG (project company). The...”
Rechtsform der Gruppe von Wirtschaftsteilnehmern, an die der Auftrag vergeben werden soll
Bidder consortia are obliged under § 50 Abs. 3 SektVO to set up a joint company in the legal form of the GmbH or the GmbH & Co. KG (project company). The shareholder structure must be disclosed to the contracting company. The members of the consortium as shareholders must declare that they have provided the project company with the necessary funds for the performance of their contractual obligations for the duration of the contracts concluded. It must also be explained that the partner (s) in addition to the project company are jointly and severally liable for their obligations. It must also be stated that it is not intended to give up the participation (s) in the project company or to change their amount without first obtaining the written consent of the contracting company. In the case of a sale of the shares or measures having equivalent effect, a legally binding declaration of the new shareholder must be provided.
Verfahren Art des Verfahrens
Verhandlungsverfahren mit vorherigem Aufruf zum Wettbewerb
Informationen über die Reduzierung der Anzahl von Lösungen oder Angeboten während der Verhandlungen oder des Dialogs
Rückgriff auf ein gestaffeltes Verfahren, um die Zahl der zu erörternden Lösungen oder zu verhandelnden Angebote schrittweise zu verringern
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2021-01-08
13:00 📅
Voraussichtliches Datum der Versendung der Aufforderungen zur Angebotsabgabe oder zur Teilnahme an die ausgewählten Bewerber: 2021-01-18 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Deutsch 🗣️
Das Angebot muss gültig sein bis: 2021-12-21 📅
“The employer reserves its unilateral right to award a tenderer for contract based on initial or subsequent tenders received without requesting for best and...”
The employer reserves its unilateral right to award a tenderer for contract based on initial or subsequent tenders received without requesting for best and final offers (BAFO’s).
Mehr anzeigen Körper überprüfen
Name: Vergabekammer Baden-Württemberg
Postanschrift: Durlacher Allee 100
Postort: Karlsruhe
Postleitzahl: 76137
Land: Deutschland 🇩🇪
Telefon: +49 721-926-8730📞
Fax: +49 721-926-3985 📠 Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
“According to Section 160 (1) GWB, the public procurement chamber initiates a review only on request. An application may, inter alia, be inadmissible if the...”
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Section 160 (1) GWB, the public procurement chamber initiates a review only on request. An application may, inter alia, be inadmissible if the applicant has not complained in due time of the alleged infringement of public procurement rules. Infringements recognized in the award procedure must be notified to the tendering company within ten calendar days (§ 160 (3) No 1 GWB). Infringements of procurement rules, which are recognizable on the basis of the notice, must be notified at the latest by the end of the participation period (§ 160 (3) No 2 GWB). Infringements that can only be identified in the tender documents must be notified at the latest by the end of the offer period (§ 160 (3) No 3 GWB). Furthermore, the petition for review is inadmissible if more than 15 calendar days have elapsed after receipt of the notification of the issuing undertaking to refuse to remedy a complaint (sec. 160 (3) No 4 GWB).
Mehr anzeigen
Quelle: OJS 2020/S 230-568109 (2020-11-20)