Beschreibung der Beschaffung
The following tender contributes to achievement of Output 1, which supports four pilot municipalities with the development and implementation of their RE and EE action plans. It is intended to embed the action plans in the municipalities and to promote the participation of citizens in decentralized structures. Major milestones for Output 1 are the draft action plans that are based on energy audits, the realization of one RE and one EE measure for each pilot municipality, and the completion of two awareness-raising communication measures per pilot municipality.
To prepare this assignment, GIZ is currently supporting the 4 municipalities in auditing their assets, identifying their detailed energy consumption and energy saving potential. The audits are mainly walkthrough audits including data analysis of energy consumption (Electricity, gas and fuel) of the municipal structures (Schools, mosques, administrative building, street lighting etc.) with sample measurement that will be conducted in selected structures. It"s highly likely that street lighting will be the highest electricity consumer followed by AC for schools, mosques, and other municipal buildings.
The contractor for the assignment at hand will build on the deliverables of the audit missions (this will include audit reports of the 4 municipalities, and draft action plans (short term and long terms) with proposed RE and EE measures.
The contractor will have to:
- Identify 2 measures per municipality through comparative studies
- Conduct feasibility and execution studies for each measure.
- Provide technical support for the municipalities in preparing and conducting the bidding procedures.
- Follow up with local implementing companies to ensure quality control,
- Provide trainings and advisory services to the officers in charge at the municipalities, and to the local implementing companies.
- Verify and ensure that O&M procedures are set up and follow international standards
- Train local actors to ensure the sustainability of the installation and support the municipality to implement a monitoring procedure to monitor the impact of the measures.
- Assess the final impact during the project, of the different measures and provide detailed reports on implemented activities (energy savings, CO2 emission reduction, and cost savings), including knowledge transfer and impact of capacity building measures for municipal representatives taking part in the project.