The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements. Tender is split to 3 lots. Lot 1 Start 1/3-2022 for firm 5-6 months with options to extend by 4 times 15 days; Lot 2 Start 1/3-2023 or 1/4 2023 for firm 5-6 months with options to extend by 4 times 15 day; Optional Lot 3 Start 1/3 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year. Bidders can bid on any number of lots.
Deadline
Die Frist für den Eingang der Angebote war 2021-08-04.
Die Ausschreibung wurde veröffentlicht am 2021-06-25.
Anbieter
Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:
Auftragsbekanntmachung (2021-06-25) Objekt Umfang der Beschaffung
Titel: Vermietung von Wasserverkehrsmitteln mit Besatzung
Kurze Beschreibung:
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
Tender is split to 3 lots.
Lot 1 Start 1/3-2022 for firm 5-6 months with options to extend by 4 times 15 days;
Lot 2 Start 1/3-2023 or 1/4 2023 for firm 5-6 months with options to extend by 4 times 15 day;
Optional Lot 3 Start 1/3 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year.
Bidders can bid on any number of lots.
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
Tender is split to 3 lots.
Lot 1 Start 1/3-2022 for firm 5-6 months with options to extend by 4 times 15 days;
Lot 2 Start 1/3-2023 or 1/4 2023 for firm 5-6 months with options to extend by 4 times 15 day;
Optional Lot 3 Start 1/3 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year.
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
Tender is split to 3 lots.
Lot 1 Start 1/3-2022 for firm 5-6 months with options to extend by 4 times 15 days;
Lot 2 Start 1/3-2023 or 1/4 2023 for firm 5-6 months with options to extend by 4 times 15 day;
Optional Lot 3 Start 1/3 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year.
Bidders can bid on any number of lots.
Informationen über Lose: Any combination or even all lots might be awarded to one supplier.
Bezeichnung des Loses: DTSB SOV 2022
Losnummer: 1
Kurze Beschreibung:
Lot 1 charter of SOV (W2W vessel) service Start 1/3-2022 for firm 5-6 months with options to extend by 4 times 15 days.
Dauer: 6 Monate
Beschreibung der Verlängerungen: Options to extend by 4 times 15 days.
Bezeichnung des Loses: DTSB SOV 2023
Losnummer: 2
Kurze Beschreibung:
Lot 2 charter of SOV (W2W vessel) service Start 1/3-2023 or 1/4=2023 for firm 5-6 months with options to extend by 4 times 15 day.
Beschreibung der Verlängerungen: Options to extend by 4 times 15 day.
Beschreibung der Optionen:
Exact start date of the campaign in 2023 is not defined yet. Intention is to define it before ITT phase or if it is still not possible to define final date intention is to agree with Owner on reasonable notification period for exact start date.
Bezeichnung des Loses: DTSB SOV 2024-2026
Losnummer: 3
Kurze Beschreibung:
Optional Lot 3 charter of SOV (W2W vessel) service Start 1 March 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year.
Beschreibung der Verlängerungen: Options to extend by 4 times 15 day each year.
Beschreibung der Optionen:
As DanTysk Sandbank Operating model might change for 2024, intention of this Lot 3 would be to enter to agreement with one Owner on optional for Employer but binding for the Owner with 9 months’ notice (by 1/6 of the previous year) from Employer. If vessel is not called up one year options for any following years is cancelled.
As DanTysk Sandbank Operating model might change for 2024, intention of this Lot 3 would be to enter to agreement with one Owner on optional for Employer but binding for the Owner with 9 months’ notice (by 1/6 of the previous year) from Employer. If vessel is not called up one year options for any following years is cancelled.
Ort der Leistung
Hauptstandort oder Erfüllungsort: Port of Esbjerg DK and DanTysk Sandbank offshore Wind Farm.
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Liste und kurze Beschreibung der Regeln und Kriterien:
Experience in serving Wind industry
Meeting minimum HS and Environmental Requirements
Having Vessels in the fleet with following requirements:
Capacity 60 cabins available for Charters
Gangway Access: Must be able to operate on both: DanTysk: LAT 19.5 m Sand Bank: LAT 21.5 m
CTV boat landing: Min 1 boat landing capable to accommodate larger CTVs up to 2m Hs
Access performance: Min 2,0 m for PQQ that requirement could be raised before ITT to 2,3m (preferably 2.5 m) of Hs for sailing and transfer of goods and personnel to offshore structure warranted for operation in north sea conditions.
Verfahren
Rechtsgrundlage: 32014L0025
Datum der Absendung der Aufforderungen: 2021-08-23 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Gültigkeitsdauer des Angebots: 4 Monate
Ergänzende Informationen Körper überprüfen
Name: German Arbitration Institute (DIS)
Postanschrift: Neuenfelderstraße 19 `
Postort: Hamburg
Postleitzahl: 21109
Land: Deutschland 🇩🇪
Quelle: OJS 2021/S 124-329623 (2021-06-25)
Bekanntmachung über vergebene Aufträge (2022-03-29) Objekt Umfang der Beschaffung
Kurze Beschreibung:
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
Tender is split to 3 lots.
LOT 1 covers campaign 2022 for firm 5-6 months with options to extend by 4 times 15 days
LOT 2 covers campaign 2023 for firm 5-6 months with options to extend by 4 times 15 days
Optional LOT 3 covers campaign 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year
Bidders can bid on any number of lots.
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
Tender is split to 3 lots.
LOT 1 covers campaign 2022 for firm 5-6 months with options to extend by 4 times 15 days
LOT 2 covers campaign 2023 for firm 5-6 months with options to extend by 4 times 15 days
Optional LOT 3 covers campaign 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year
Bidders can bid on any number of lots.
Metadaten der Bekanntmachung
Dokumenttyp: Bekanntmachung über vergebene Aufträge
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
LOT 1 covers campaign 2022 for firm 5-6 months with options to extend by 4 times 15 days
LOT 2 covers campaign 2023 for firm 5-6 months with options to extend by 4 times 15 days
Optional LOT 3 covers campaign 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year
LOT 1 charter of SOV (W2W vessel) for campaign of 2022
Beschreibung der Optionen: extensions 6 times by 14 days
Ort der Leistung
Hauptstandort oder Erfüllungsort: Port of Esbjerg DK and DanTysk Sandbank offshore Wind Farm
Auftragsvergabe
Datum des Vertragsabschlusses: 2022-02-28 📅
Name: C-bed I Aps
Postort: Fredericia
Land: Dänemark 🇩🇰
Quelle: OJS 2022/S 065-172781 (2022-03-29)
Bekanntmachung über vergebene Aufträge (2022-09-06) Objekt Umfang der Beschaffung
Kurze Beschreibung:
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
Tender is split to 3 lots.
LOT 1 Start 1/3-2022 for firm 5-6 months with options to extend by 4 times 15 days
LOT 2 Start 1/3-2023 or 1/4 2023 for firm 5-6 months with options to extend by 4 times 15 day
Optional LOT 3 Start 1/3 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year
Bidders can bid on any number of lots.
The goal of this tender is to enter into a contract with one party providing suitable access and availability of the SOV to allow accommodation and transfer of the technician via suitable gangway solution to wind turbines for spring and summer service campaigns in 2022, 2023 and optionally for 2024-26 on DanTysk Sandbank Offshore Wind Farm. Employer will consider as SOV any DP2 (Dynamic Position Vessels) ship able to operations with gangway that meets all technical, HS and EnSu employers requirements.
Tender is split to 3 lots.
LOT 1 Start 1/3-2022 for firm 5-6 months with options to extend by 4 times 15 days
LOT 2 Start 1/3-2023 or 1/4 2023 for firm 5-6 months with options to extend by 4 times 15 day
Optional LOT 3 Start 1/3 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year
Optional LOT 3 charter of SOV (W2W vessel) service Start 1st of March 2024-2025-2026 for firm 5-6 months with options to extend by 4 times 15 day each year
Beschreibung der Optionen:
Each year charter to be called at least with 9 months’ notice from Employer for 6 months firm charter with options to extend each year 4 times 15 days. If vessel is not called up one year, options for any following years is cancelled.
Auftragsvergabe
Datum des Vertragsabschlusses: 2023-01-31 📅
Name: Acta Marine Offshore Services B.V.
Postort: Capelle aan den Ijssel
Land: Niederlande 🇳🇱
Ergänzende Informationen Körper überprüfen
Name: Vergabekammer des Landes Hamburg bei der Finanzbehörde
Postanschrift: Große Bleichen 27
Postleitzahl: 20354
Quelle: OJS 2023/S 028-081330 (2023-02-03)