IRDP/TRIGGER aims to boost added value of agricultural production in Tajikistan. It has five outputs through which it will i) improve the business enabling environment and policy dialogue; ii) increase productivity of agricultural value chains; iii) promote the access to export markets; iv) support business start-ups and promote entrepreneurship and v) improve the enabling environment in the Integrated Water Resource Management (IWRM). The strategy of IRDP is designed to increase the income of value chain actors through a market-oriented value chain approach. At the core of the strategy is the support of community-based extension services (village advisors) and the matchmaking between smallholder producer groups and lead companies with business relationships to domestic and export markets.
IRDP/TRIGGER, through its water component, supports the Ministry of Energy and Water Resources in the implementation of the Water Sector Reform Program (2016-2025). This Program was adopted based on the decision of the Government of the Republic of Tajikistan under No. 791 as of 30 December 2015 to achieve the objectives and principles of the Water Sector Reform. Basin management and IWRM are the main principles of the reform programme. The programme reflects matters in all water-related subsectors and includes an action plan for the implementation. The implementation plan consists of the following sections: "Legislative development and regulation", "Institutional development", "Infrastructural rehabilitation", "Auxiliary means of water sector reform" and includes 35 activities in these spheres. The reform assumes a transfer of water resources management functions from administrative boundaries to hydrological basins applying the principle of IWRM including the separation of functions between water policy and regulation and economic and operational water management aspects
GIZ supports the Water Sector Reform Programme under the Integrated Rural Development Project (IRDP) financed by the German Federal Ministry for Economic Cooperation and Development (BMZ) and co-financed by the European Union. Particularly, the water component of IRDP/TRIGGER aims to improve the enabling environment in the water sector in Tajikistan and introducing IWRM as an integral part of development planning. The water component support efforts at river basin level in the Zarafshon and Upper Vakhsh river basin to formulate, implement, monitor and evaluate two river basin management plans following IWRM and good water governance principles. To this purpose the role and institutional strengthening of corresponding River Basin Organizations and River Basin Councils is of utmost importance.
In this regard, the Project strengthens the enabling environment for the implementation of IWRM in both basins to unlock agricultural potential, in accordance with the priorities set forth by the Water Sector Reform Programme (2016-2025), by targeting its activities at different levels, such as, policy making, legal framework, management instruments and financial mechanisms relevant for IWRM. The water component improves the institutional capacities of stakeholders to mainstream IWRM in development plans that are relevant for farmers, producer associations and processing companies at national, regional, district and local levels.
To do so, we incorporate several approaches, such as IWRM, good water governance principles, water security, climate/water resilience and Nexus, among others.
Deadline
Die Frist für den Eingang der Angebote war 2022-09-15.
Die Ausschreibung wurde veröffentlicht am 2022-08-15.
Anbieter
Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:
Objekt Umfang der Beschaffung
Titel: 81287282-Water Resources Management
81287282
Produkte/Dienstleistungen: Beratungsdienste📦
Kurze Beschreibung:
“IRDP/TRIGGER aims to boost added value of agricultural production in Tajikistan. It has five outputs through which it will i) improve the business enabling...”
Kurze Beschreibung
IRDP/TRIGGER aims to boost added value of agricultural production in Tajikistan. It has five outputs through which it will i) improve the business enabling environment and policy dialogue; ii) increase productivity of agricultural value chains; iii) promote the access to export markets; iv) support business start-ups and promote entrepreneurship and v) improve the enabling environment in the Integrated Water Resource Management (IWRM). The strategy of IRDP is designed to increase the income of value chain actors through a market-oriented value chain approach. At the core of the strategy is the support of community-based extension services (village advisors) and the matchmaking between smallholder producer groups and lead companies with business relationships to domestic and export markets.
IRDP/TRIGGER, through its water component, supports the Ministry of Energy and Water Resources in the implementation of the Water Sector Reform Program (2016-2025). This Program was adopted based on the decision of the Government of the Republic of Tajikistan under No. 791 as of 30 December 2015 to achieve the objectives and principles of the Water Sector Reform. Basin management and IWRM are the main principles of the reform programme. The programme reflects matters in all water-related subsectors and includes an action plan for the implementation. The implementation plan consists of the following sections: "Legislative development and regulation", "Institutional development", "Infrastructural rehabilitation", "Auxiliary means of water sector reform" and includes 35 activities in these spheres. The reform assumes a transfer of water resources management functions from administrative boundaries to hydrological basins applying the principle of IWRM including the separation of functions between water policy and regulation and economic and operational water management aspects
GIZ supports the Water Sector Reform Programme under the Integrated Rural Development Project (IRDP) financed by the German Federal Ministry for Economic Cooperation and Development (BMZ) and co-financed by the European Union. Particularly, the water component of IRDP/TRIGGER aims to improve the enabling environment in the water sector in Tajikistan and introducing IWRM as an integral part of development planning. The water component support efforts at river basin level in the Zarafshon and Upper Vakhsh river basin to formulate, implement, monitor and evaluate two river basin management plans following IWRM and good water governance principles. To this purpose the role and institutional strengthening of corresponding River Basin Organizations and River Basin Councils is of utmost importance.
In this regard, the Project strengthens the enabling environment for the implementation of IWRM in both basins to unlock agricultural potential, in accordance with the priorities set forth by the Water Sector Reform Programme (2016-2025), by targeting its activities at different levels, such as, policy making, legal framework, management instruments and financial mechanisms relevant for IWRM. The water component improves the institutional capacities of stakeholders to mainstream IWRM in development plans that are relevant for farmers, producer associations and processing companies at national, regional, district and local levels.
To do so, we incorporate several approaches, such as IWRM, good water governance principles, water security, climate/water resilience and Nexus, among others.
The strategy of the Water Component of the IRDP/TRIGGER Project is to implement Integrated Water Resources Management principles (IWRM) as a critical path towards improving water security and resilience in the geographical areas where it operates: the Zarafshon and Upper Vakhsh river basins. In this sense, the critical path starts with facilitating basin-wide dialogue across relevant stakeholders (i.e., public institutions, NGOs, farmers, companies), sectors and administration levels and institutionalize their cooperation and commitment through water governance structures, such as River Basin Organizations (RBO) and River Basin Councils (RBC).
Then, managing information and knowledge to assist these institutions in jointly formulating River Basin Management Plans, which articulate a basin-wide common vision where nobody is left behind. The ultimate goal of the strategy is to improve water security and resilience to unlock the agricultural potential in both river basins. Therefore, the implementation of pilot small-scale interventions aimed at improving water productivity and climate-resilience of farmers is key to demonstrate the benefits of river basin coordination and science-based, inclusive decision-making.
The sustainability of the strategy relies on various approaches that characterize our engagement with our local partners. Firstly, we strengthen the capacity of the Ministry of Energy and Water Resources and other relevant stakeholders for efficient and effective participation in water-related decision-making processes at national and basin levels. Secondly, we support an enabling environment that allows the MEWR to harness future multisectoral water security investment opportunities to ensure a climate-resilient socio-economic development in both river basins. Finally, we strive towards ensuring the financial sustainability of IWRM coordination efforts in Tajikistan based on existing best practices and lessons learned in the process of implementing this project.
Work and interventions are structured in four interconnected work streams.
Water Governance: Supports national policy integration, development of laws and management instruments and tools to facilitate intersectoral, multilevel, inclusive and gender-responsive river basin planning; explores economic incentives to optimize IWRM implementation on the ground and to improve its financial sustainability. Links key elements of water governance, such as RBOs, RBCs and river basin management plans with existing development and investment planning processes relevant for the management and use of basin water resources.
Information Management and Knowledge Sharing: Assists the National Water Information System (NWIS) to foster knowledge management around water, climate, land, ecosystems and other water-related relevant information. Facilitates the setup of a digital basin information system, established at the Zarafshon RBO and linked to the NWIS, as basis for evidence-based decision-making and integrated management of basin water resources. Fosters methodologies and modelling tools that target robust and flexible water security investments under future climate uncertainties.
Capacity Building: Strengthens capacities of the MEWR, at national and basin levels, as well as those of River Basin Council member institutions to enhance their ability to implement IWRM. Facilitates long and short-term training and environmental education initiatives together with local academic institutions. Focuses on the development of hard as well as soft skills of public officials, with an emphasis on younger water champions to foster intergenerational equity as one of the main drivers for sustainable water resources management in Tajikistan.
Water Security for Food Resilience: Supports farmers to improve their adaptive capacity and resilience against climate change impacts through small-scale pilot interventions aimed at disaster risk preparedness, improved water access and increased water efficiency and productivity of farmers. Together with relevant stakeholders at national and grass-roots levels (i.e. relevant Ministries, Water User Associations and producer associations or companies) assesses potential water-related risks affecting agricultural supply chains and overall food systems.
The contractor is expected to deliver its services across all four work streams.
Mehr anzeigen Vergabekriterien
Der Preis ist nicht das einzige Zuschlagskriterium, und alle Kriterien werden nur in den Auftragsunterlagen genannt
Laufzeit des Vertrags, der Rahmenvereinbarung oder des dynamischen Beschaffungssystems
Der nachstehende Zeitrahmen ist in Monaten ausgedrückt.
Beschreibung
Dauer: 24
Laufzeit des Vertrags, der Rahmenvereinbarung oder des dynamischen Beschaffungssystems
Dieser Vertrag ist verlängerbar ✅ Beschreibung
Beschreibung der Verlängerungen:
“GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender....”
Beschreibung der Verlängerungen
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Mehr anzeigen Informationen über Optionen
Optionen ✅
Beschreibung der Optionen:
“GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender....”
Beschreibung der Optionen
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Mehr anzeigen Umfang der Beschaffung
Informationen über die Fonds der Europäischen Union: CRIS:ACA/2019/416818
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Liste und kurze Beschreibung der Bedingungen:
“1) Trading name and address, beneficial owner(s), commercial register number, bank account, tax number, VAT identification number, brief company profile and...”
Liste und kurze Beschreibung der Bedingungen
1) Trading name and address, beneficial owner(s), commercial register number, bank account, tax number, VAT identification number, brief company profile and contact in event of queries.
2) Extract from the commercial register or equivalent evidence/proof (not older than six months).
3) Self-declaration that no grounds for exclusion in Section 123, 124 of the German Act Against Restraints of Competition (GWB) and EU-Russian sanctions apply.
4) If a candidate/tenderer wishes to use the capacities of another company for the execution of the contract, he must prove by submitting a declaration of commitment that the corresponding capacities are available to him for the execution of the contract and a declaration that no grounds for exclusion pursuant to Section 123 GWB and/or Section 124 GWB apply to them must be submitted.
5) If subcontractors are to be used, a declaration of commitment and a declaration that no grounds for exclusion pursuant to Section 123 GWB and/or Section 124 GWB apply to them must be submitted.
6) In the case of participation as a bidding consortium: tenderers must appoint a leading member and authorise this member to represent the group and to receive payments with discharging effect also for the other members. A corresponding agreement, signed by all members, must be attached to the application for participation. For this purpose, the form provided by GIZ must be used.
Mehr anzeigen Wirtschaftliche und finanzielle Leistungsfähigkeit
Liste und kurze Beschreibung der Auswahlkriterien:
“1) Declaration on the average annual turnover for the last 3 financial years (last-but-4 financial year can be included in case of invitation to tender held...”
Liste und kurze Beschreibung der Auswahlkriterien
1) Declaration on the average annual turnover for the last 3 financial years (last-but-4 financial year can be included in case of invitation to tender held within 6 months of end of last financial year).
2) Declaration on the average number of employees and managers for the past three calendar years.
“1) Average annual turnover for the last 3 financial years: at least 2,400,000 (two million fourhundred thousand) EUR
2) Average number of employees and...”
1) Average annual turnover for the last 3 financial years: at least 2,400,000 (two million fourhundred thousand) EUR
2) Average number of employees and managers for the past three calendar years: at least 15 (fifteen) persons.
Mehr anzeigen Technische und berufliche Fähigkeiten
Liste und kurze Beschreibung der Auswahlkriterien:
“It is necessary to provide minimum 2 (two) reference projects in the technical field "Water Resources Management" and at least 1 (one) reference project in...”
Liste und kurze Beschreibung der Auswahlkriterien
It is necessary to provide minimum 2 (two) reference projects in the technical field "Water Resources Management" and at least 1 (one) reference project in Tajikistan in the technical field "Water Resources Management ", each in the last three years with a minimum commission value of at least 400,000 (fourhundred thousand) EUR.
Mehr anzeigen Bedingungen für die Teilnahme
Bedingungen für die Teilnahme (technische und berufliche Fähigkeiten):
“1) The technical assessment is only based on reference projects with a minimum commission value of 400,000 (fourhundred thousand) EUR in the last three...”
Bedingungen für die Teilnahme (technische und berufliche Fähigkeiten)
1) The technical assessment is only based on reference projects with a minimum commission value of 400,000 (fourhundred thousand) EUR in the last three years.
2) The minimum requirements forsee at least 2 (two) reference projects in the technical field "Water Resources Management" and at least 1 (one) reference project in Tajikistan in the technical field "Water Resources Management ", each in the last three years with a minimum commission value of at least 400,000 (fourhundred thousand) EUR.
Mehr anzeigen Informationen über das für die Ausführung des Auftrags zuständige Personal
Verpflichtung zur Angabe der Namen und beruflichen Qualifikationen der mit der Ausführung des Auftrags betrauten Mitarbeiter
Verfahren Art des Verfahrens
Offenes Verfahren
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2022-09-15
12:00 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Das Angebot muss gültig sein bis: 2022-12-31 📅
Bedingungen für die Öffnung der Angebote: 2022-09-15
12:05 📅
Ergänzende Informationen Informationen über elektronische Arbeitsabläufe
Die elektronische Bestellung wird verwendet
Zusätzliche Informationen
“The communication takes place exclusively via the project area of the portal.
Bekanntmachungs-ID: CXTRYY6Y3NE” Körper überprüfen
Name: Die Vergabekammern des Bundes
Postanschrift: Villemombler Straße 76
Postort: Bonn
Postleitzahl: 53123
Land: Deutschland 🇩🇪
Telefon: +49 2289499-0📞
E-Mail: vk@bundeskartellamt.bund.de📧
Fax: +49 2289499-163 📠
URL: https://www.bundeskartellamt.de🌏 Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
“According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the...”
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Mehr anzeigen
Quelle: OJS 2022/S 159-453900 (2022-08-15)
Bekanntmachung über vergebene Aufträge (2023-01-02) Objekt Umfang der Beschaffung
Gesamtwert der Beschaffung (ohne MwSt.): EUR 2 448 700 💰
Vergabekriterien
Qualitätskriterium (Bezeichnung): Technical Assessment
Qualitätskriterium (Gewichtung): 70
Preis (Gewichtung): 30.00
Verfahren Administrative Informationen
Frühere Veröffentlichungen zu diesem Verfahren: 2022/S 159-453900
Auftragsvergabe
1️⃣
Vertragsnummer: 01
Titel: Contract award GFA Consulting Group GmbH HELVETAS Intercooperation gGmbH
Datum des Vertragsabschlusses: 2022-12-05 📅
Informationen über Ausschreibungen
Anzahl der eingegangenen Angebote: 3
Anzahl der eingegangenen Angebote von KMU: 2
Anzahl der eingegangenen Angebote von Bietern aus anderen EU-Mitgliedstaaten: 1
Anzahl der eingegangenen Angebote von Bietern aus Nicht-EU-Mitgliedstaaten: 0
Anzahl der auf elektronischem Wege eingegangenen Angebote: 3
Der Auftrag wurde an eine Gruppe von Wirtschaftsteilnehmern vergeben ✅ Name und Anschrift des Auftragnehmers
Name: GFA Consulting Group GmbH
Postanschrift: Eulenkrugstr. 82
Postort: Hamburg
Postleitzahl: 22359
Land: Deutschland 🇩🇪
Region: Hamburg🏙️
Der Auftragnehmer ist ein KMU
Name: HELVETAS Intercooperation gGmbH
Postanschrift: Charles-de-Gaulle-Str. 5
Postort: Bonn
Postleitzahl: 53113
Region: Bonn, Kreisfreie Stadt🏙️
Der Auftragnehmer ist ein KMU ✅ Angaben zum Wert des Auftrags/der Partie (ohne MwSt.)
Gesamtwert des Auftrags/Loses: EUR 2 448 700 💰