The "Sustainable Energy Programme in Senegal" (PED II) is technical cooperation project of the Senegalese Ministry of Petroleum and Energies (MPE), financed by BMZ and implemented by GIZ. The amount of the project is to EUR 11,600,000 and is running from 01/2022 until 12/2025. The main implementation partners are the Agency for the Economy and Energy Management (AEME), the National Renewable Energy Agency (ANER), the Senegalese Rural Electrification Agency (ASER), the Electricity Sector Regulatory Commission (CRSE) and the National Electricity Company (SENELEC). The objective of the Module is to "strengthen the Senegal's Ministry of Energy"s capacity to reform in order to promote sustainable and climate-friendly energy sources". The project contributes to Senegal's roadmap for the implementation of the 2030 Agenda SDGs, in particular SDG 7 (access to energy), 9 (industrialisation) and 13 (combating climate change) and the German support to reach the objectives of the Just Energy Transition Partnership (JET-P) signed between Senegal and the G7 in June 2023. The target groups of the project are the households and businesses in Senegal not yet supplied with electricity (55% of the country's 16 million inhabitants), public and private players in the Senegalese energy sector acting as intermediaries. The project" approach lies on strengthening at national level the capacities of the Ministry of Energy and other stakeholders to steer the implementation of an energy policy aimed at decarbonisation. In addition, the profitability of renewable energies in rural electrification and in the electricity mix is promoted, among other things, by the productive use of Renewable Energies (RE). Promotion of energy efficiency will also be supported. The expected results of the project are: 1. The instruments for steering the implementation of the national energy strategy aimed at low-carbon socio-economic development that is resilient to climate change - decarbonization - are increasingly available. 2. The capacities of public and private players to promote the sustainability of rural electrification are strengthened. 3. Economically and employment-oriented solutions for the productive use of renewable energies are increasingly available. 4. The capacity of public players to promote energy efficiency is strengthened as part of a sustainable, climate-friendly energy policy. 5. Instruments are available to public and private players to leverage the policy framework to accelerate the expansion of grid-connected renewable energies as part of the Just Energy Transition.
Deadline
Die Frist für den Eingang der Angebote war 2024-05-13.
Die Ausschreibung wurde veröffentlicht am 2024-04-10.
Auftragsbekanntmachung (2024-04-10) Objekt Umfang der Beschaffung
Titel: 81306325-Assistance technique au Programme Energies Durables II (PED II) au Senegal
Referenznummer: 81306325
Kurze Beschreibung:
The "Sustainable Energy Programme in Senegal" (PED II) is technical cooperation project of the Senegalese Ministry of Petroleum and Energies (MPE), financed by BMZ and implemented by GIZ. The amount of the project is to EUR 11,600,000 and is running from 01/2022 until 12/2025. The main implementation partners are the Agency for the Economy and Energy Management (AEME), the National Renewable Energy Agency (ANER), the Senegalese Rural Electrification Agency (ASER), the Electricity Sector Regulatory Commission (CRSE) and the National Electricity Company (SENELEC).
The objective of the Module is to "strengthen the Senegal's Ministry of Energy"s capacity to reform in order to promote sustainable and climate-friendly energy sources". The project contributes to Senegal's roadmap for the implementation of the 2030 Agenda SDGs, in particular SDG 7 (access to energy), 9 (industrialisation) and 13 (combating climate change) and the German support to reach the objectives of the Just Energy Transition Partnership (JET-P) signed between Senegal and the G7 in June 2023.
The target groups of the project are the households and businesses in Senegal not yet supplied with electricity (55% of the country's 16 million inhabitants), public and private players in the Senegalese energy sector acting as intermediaries.
The project" approach lies on strengthening at national level the capacities of the Ministry of Energy and other stakeholders to steer the implementation of an energy policy aimed at decarbonisation. In addition, the profitability of renewable energies in rural electrification and in the electricity mix is promoted, among other things, by the productive use of Renewable Energies (RE). Promotion of energy efficiency will also be supported.
The expected results of the project are:
1. The instruments for steering the implementation of the national energy strategy aimed at low-carbon socio-economic development that is resilient to climate change - decarbonization - are increasingly available.
2. The capacities of public and private players to promote the sustainability of rural electrification are strengthened.
3. Economically and employment-oriented solutions for the productive use of renewable energies are increasingly available.
4. The capacity of public players to promote energy efficiency is strengthened as part of a sustainable, climate-friendly energy policy.
5. Instruments are available to public and private players to leverage the policy framework to accelerate the expansion of grid-connected renewable energies as part of the Just Energy Transition.
The "Sustainable Energy Programme in Senegal" (PED II) is technical cooperation project of the Senegalese Ministry of Petroleum and Energies (MPE), financed by BMZ and implemented by GIZ. The amount of the project is to EUR 11,600,000 and is running from 01/2022 until 12/2025. The main implementation partners are the Agency for the Economy and Energy Management (AEME), the National Renewable Energy Agency (ANER), the Senegalese Rural Electrification Agency (ASER), the Electricity Sector Regulatory Commission (CRSE) and the National Electricity Company (SENELEC).
The objective of the Module is to "strengthen the Senegal's Ministry of Energy"s capacity to reform in order to promote sustainable and climate-friendly energy sources". The project contributes to Senegal's roadmap for the implementation of the 2030 Agenda SDGs, in particular SDG 7 (access to energy), 9 (industrialisation) and 13 (combating climate change) and the German support to reach the objectives of the Just Energy Transition Partnership (JET-P) signed between Senegal and the G7 in June 2023.
The target groups of the project are the households and businesses in Senegal not yet supplied with electricity (55% of the country's 16 million inhabitants), public and private players in the Senegalese energy sector acting as intermediaries.
The project" approach lies on strengthening at national level the capacities of the Ministry of Energy and other stakeholders to steer the implementation of an energy policy aimed at decarbonisation. In addition, the profitability of renewable energies in rural electrification and in the electricity mix is promoted, among other things, by the productive use of Renewable Energies (RE). Promotion of energy efficiency will also be supported.
The expected results of the project are:
1. The instruments for steering the implementation of the national energy strategy aimed at low-carbon socio-economic development that is resilient to climate change - decarbonization - are increasingly available.
2. The capacities of public and private players to promote the sustainability of rural electrification are strengthened.
3. Economically and employment-oriented solutions for the productive use of renewable energies are increasingly available.
4. The capacity of public players to promote energy efficiency is strengthened as part of a sustainable, climate-friendly energy policy.
5. Instruments are available to public and private players to leverage the policy framework to accelerate the expansion of grid-connected renewable energies as part of the Just Energy Transition.
Art des Vertrags: Dienstleistungen
Produkte/Dienstleistungen: Dienstleistungen im Energiebereich📦
Sonstige Beschränkungen am Erfüllungsort: Ort im betreffenden Land
Beschreibung
Interne Kennung: 81306325
Beschreibung der Beschaffung:
In order to support the "Sustainable Energy Programme in Senegal" (PED II) of the Senegalese Ministry of Petroleum and Energies (MPE), financed by BMZ and implemented by GIZ, contractor will be hired for supporting the achievement the objectives and indicators of the project.
The objective of PED II is to "strengthen the Senegal's Ministry of Energy"s capacity to reform in order to promote sustainable and climate-friendly energy sources". The project contributes to Senegal's roadmap for the implementation of the 2030 Agenda SDGs, in particular SDG 7 (access to energy), 9 (industrialisation) and 13 (combating climate change) and the German support to reach the objectives of the Just Energy Transition Partnership (JET-P) signed between Senegal and the G7 in June 2023.
The expected results of the project are:
1. The instruments for steering the implementation of the national energy strategy aimed at low-carbon socio-economic development that is resilient to climate change - decarbonization - are increasingly available.
2. The capacities of public and private players to promote the sustainability of rural electrification are strengthened.
3. Economically and employment-oriented solutions for the productive use of renewable energies are increasingly available.
4. The capacity of public players to promote energy efficiency is strengthened as part of a sustainable, climate-friendly energy policy.
5. Instruments are available to public and private players to leverage the policy framework to accelerate the expansion of grid-connected renewable energies as part of the Just Energy Transition
In order to reach these results, the contractor will be supporting the achievements of the objectives and indicators of the project by:
- Provision and management of long term experts that contribute to the achievement of the above defined indicators and ouputs.
- Provision and management of a short-term experts (STEC) pools which provide for national and international experts for assignments that contribute to the achievement of the above defined indicators and ouputs.
- Provide high quality technical, methodological expertise and strategic advice strengthening the Ministry of Oil and Energy, its Executive Agencies, its Coordination and Monitoring Unit of the JET-P and key stakeholders of the sector in the areas of:
o Renewable energies governance, framework and regulations
o Rural electrification and off-grid energy provision
o Productive uses of renewable energies in off-grid rural areas
o Energy efficiency measures in strategic sectors (transport, public lightening, etc.)
o Development and integration of renewable energies into the grid
The Contractor plays a role in the below specified work packages, thereby contributing to the attainment of the corresponding milestones:
- Work Package 1: Promoting a sustainable rural electrification and capacity strengthening of public and private sectors (module output 2, 20%)
- Work Package 2: Supporting the productive use of renewable energies (module output 3, 10%)
- Work Package 3: Promoting Energy Efficiency and strategic capacity strengthening of MPE and AEME (module output 4, 30%)
- Work Package 4: Supporting the development of instruments for the expansion of grid-connected renewable energies as part of the Just Energy Transition (module output 5, 40%).
In order to support the "Sustainable Energy Programme in Senegal" (PED II) of the Senegalese Ministry of Petroleum and Energies (MPE), financed by BMZ and implemented by GIZ, contractor will be hired for supporting the achievement the objectives and indicators of the project.
The objective of PED II is to "strengthen the Senegal's Ministry of Energy"s capacity to reform in order to promote sustainable and climate-friendly energy sources". The project contributes to Senegal's roadmap for the implementation of the 2030 Agenda SDGs, in particular SDG 7 (access to energy), 9 (industrialisation) and 13 (combating climate change) and the German support to reach the objectives of the Just Energy Transition Partnership (JET-P) signed between Senegal and the G7 in June 2023.
The expected results of the project are:
1. The instruments for steering the implementation of the national energy strategy aimed at low-carbon socio-economic development that is resilient to climate change - decarbonization - are increasingly available.
2. The capacities of public and private players to promote the sustainability of rural electrification are strengthened.
3. Economically and employment-oriented solutions for the productive use of renewable energies are increasingly available.
4. The capacity of public players to promote energy efficiency is strengthened as part of a sustainable, climate-friendly energy policy.
5. Instruments are available to public and private players to leverage the policy framework to accelerate the expansion of grid-connected renewable energies as part of the Just Energy Transition
In order to reach these results, the contractor will be supporting the achievements of the objectives and indicators of the project by:
- Provision and management of long term experts that contribute to the achievement of the above defined indicators and ouputs.
- Provision and management of a short-term experts (STEC) pools which provide for national and international experts for assignments that contribute to the achievement of the above defined indicators and ouputs.
- Provide high quality technical, methodological expertise and strategic advice strengthening the Ministry of Oil and Energy, its Executive Agencies, its Coordination and Monitoring Unit of the JET-P and key stakeholders of the sector in the areas of:
o Renewable energies governance, framework and regulations
o Rural electrification and off-grid energy provision
o Productive uses of renewable energies in off-grid rural areas
o Energy efficiency measures in strategic sectors (transport, public lightening, etc.)
o Development and integration of renewable energies into the grid
The Contractor plays a role in the below specified work packages, thereby contributing to the attainment of the corresponding milestones:
- Work Package 1: Promoting a sustainable rural electrification and capacity strengthening of public and private sectors (module output 2, 20%)
- Work Package 2: Supporting the productive use of renewable energies (module output 3, 10%)
- Work Package 3: Promoting Energy Efficiency and strategic capacity strengthening of MPE and AEME (module output 4, 30%)
- Work Package 4: Supporting the development of instruments for the expansion of grid-connected renewable energies as part of the Just Energy Transition (module output 5, 40%).
Zusätzliche Informationen:
This order is suited for small and medium-sized enterprises (SMEs). Due to a technical error, this information cannot be entered in the form.
Postleitzahl: 00000
Stadt: Senegal
Land: Senegal 🇸🇳
Maximale Verlängerungen: 3
Weitere Informationen zur Verlängerung:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Informationen über Optionen
Optionen ✅
Beschreibung der Optionen:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Titel
Los-Identifikationsnummer: LOT-0001
Verfahren Art des Verfahrens
Offenes Verfahren ✅
Rechtsgrundlage: Richtlinie 2014/24/EU
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2024-05-13 12:00:00 📅
Bedingungen für die Öffnung der Angebote: 2024-05-13 12:00:00 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Französisch 🗣️
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 140 Bedingungen für die Einreichung eines Angebots
Die Bieter können mehrere Angebote einreichen
Eröffnungstermin: 2024-05-13 12:00:00 📅
Elektronische Rechnungsstellung: Erforderlich
Die elektronische Bestellung wird verwendet ✅
Elektronische Zahlung wird verwendet ✅
Frist für die Anforderung zusätzlicher Informationen: 2024-05-06 23:59:00 📅
Zusätzliche Informationen:
GIZ asks the applicant or bidder to submit, complete or correct documents, within the framework laid down by law.
Der Vertrag enthält Bedingungen zur Vertragsausführung ✅
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Wirtschaftliche und finanzielle Leistungsfähigkeit
Liste und kurze Beschreibung der Auswahlkriterien:
Wirtschaftliche und finanzielle Leistungsfähigkeit: 1. Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 500.000,00 EUR
2. Average number of employees and managers in the last three calendar years, at least 5 persons
Wirtschaftliche und finanzielle Leistungsfähigkeit: 1. Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 500.000,00 EUR
2. Average number of employees and managers in the last three calendar years, at least 5 persons
Bedingungen für die Teilnahme
Liste und kurze Beschreibung der Bedingungen:
Eignung zur Berufsausübung: 1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin.
2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG
3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Eignung zur Berufsausübung: 1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin.
2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG
3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Technische und berufliche Fähigkeiten
Liste und kurze Beschreibung der Auswahlkriterien:
Technische und berufliche Leistungsfähigkeit: 1. The technical assessment is only based on reference projects with a minimum commission value of 100.000,00 EUR.
2. At least 5 reference projects in the technical field Advisory work for the development of national or regional institutional frameworks (roadmaps, strategies, policy documents) on renewable energies, rural electrification or energy efficiency in the last three years
3. At least 3 reference projects in the technical field Support towards operationalization of national strategies in the fields of renewable energies, rural electrification or energy efficiency in the last three years
4. In the above-mentioned technical fields, at least 3 reference projects must have been carried out in the regions Eastern/Middle/Western/Southern Africa in the last three years
Technische und berufliche Leistungsfähigkeit: 1. The technical assessment is only based on reference projects with a minimum commission value of 100.000,00 EUR.
2. At least 5 reference projects in the technical field Advisory work for the development of national or regional institutional frameworks (roadmaps, strategies, policy documents) on renewable energies, rural electrification or energy efficiency in the last three years
3. At least 3 reference projects in the technical field Support towards operationalization of national strategies in the fields of renewable energies, rural electrification or energy efficiency in the last three years
4. In the above-mentioned technical fields, at least 3 reference projects must have been carried out in the regions Eastern/Middle/Western/Southern Africa in the last three years
Bedingungen für den Vertrag
Bedingungen für die Vertragserfüllung:
The execution conditions result from the information given in the contract notice and the tender documents.
Bedingungen für die Teilnahme
Ausschlussgrund:
Beteiligung an einer kriminellen Vereinigung
Betrugsbekämpfung
Der Zahlungsunfähigkeit vergleichbare Lage gemäß nationaler Rechtsvorschriften
+ 20 weitere
Direkte oder indirekte Beteiligung an der Vorbereitung des Vergabeverfahrens
Einstellung der gewerblichen Tätigkeit
Entrichtung von Steuern
Falsche Angaben, verweigerte Informationen, die nicht in der Lage sind, die erforderlichen Unterlagen vorzulegen, und haben vertrauliche Informationen über dieses Verfahren erhalten.
Geldwäsche oder Terrorismusfinanzierung
Interessenkonflikt aufgrund seiner Teilnahme an dem Vergabeverfahren
Kinderarbeit und andere Formen des Menschenhandels
Konkurs
Korruption
Schwere Verfehlung im Rahmen der beruflichen Tätigkeit
Terroristische Straftaten oder Straftaten im Zusammenhang mit terroristischen Aktivitäten
Vereinbarungen mit anderen Wirtschaftsteilnehmern zur Verzerrung des Wettbewerbs
Vergleichsverfahren
Verstoß gegen arbeitsrechtliche Verpflichtungen
Verstoß gegen sozialrechtliche Verpflichtungen
Verstoß gegen umweltrechtliche Verpflichtungen
Verwaltung der Vermögenswerte durch einen Insolvenzverwalter
Vorzeitige Beendigung, Schadensersatz oder andere vergleichbare Sanktionen
Zahlung der Sozialversicherungsbeiträge
Zahlungsunfähigkeit
Beschreibung der Ausschlussgründe: Zwingende bzw. fakultative Ausschlussgründe nach §§ 123 bis 126 GWB
Bekanntmachungs-ID: CXTRYY6Y1J3NTDTP
All communication takes place in English via communication tool in the project area of the procurement portal.
Körper überprüfen
Name: Vergabekammern des Bundes
Nationale Registrierungsnummer: 022894990
Postanschrift: Kaiser-Friedrich-Straße 16
Postleitzahl: 53113
Postort: Bonn
Region: Bonn, Kreisfreie Stadt
🏙️
Land: Deutschland 🇩🇪
E-Mail: vk@bundeskartellamt.bund.de📧
Telefon: +49 2289499-0📞
Fax: +49 2289499-163 📠 Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Informationen über elektronische Arbeitsabläufe
Die elektronische Rechnungsstellung wird akzeptiert
Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2024-04-10+02:00 📅
Quelle: OJS 2024/S 073-218074 (2024-04-10)
Auftragsbekanntmachung (2024-04-29) Verfahren Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2024-05-21 12:00:00 📅
Bedingungen für die Öffnung der Angebote: 2024-05-21 12:00:00 📅
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 132 Bedingungen für die Einreichung eines Angebots
Eröffnungstermin: 2024-05-21 12:00:00 📅
Frist für die Anforderung zusätzlicher Informationen: 2024-05-14 23:59:00 📅
Öffentlicher Auftraggeber Kommunikation
Gültigkeitsdauer des Angebots: 132
Ergänzende Informationen Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2024-04-29+02:00 📅
Änderungen Neuer Wert
Text: Extension of the submission deadline until 21.05.2024 (noon, German time).
Zu berichtigender Text in der ursprünglichen Bekanntmachung
Änderung der Auftragsunterlagen am ✅
Datum der Änderung der Auftragsunterlagen: 2024-04-29 📅
Andere zusätzliche Informationen
Hauptgrund für die Änderung: Aktualisierte Informationen
Angaben zu Änderungen
Fassung der zu ändernden vorigen Bekanntmachung: 5a60b115-430d-4d94-82b1-eb031914bf4e-01
Quelle: OJS 2024/S 085-256321 (2024-04-29)