81319388 - Elaboration of 4 Integrated Catchment Management and Development Plans for the Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare Catchment Management Areas in Lesotho
The Government of Lesotho, with support from the EU and the BMZ, has embarked on an ambitious "National Programme for ICM (ReNoka)" ("re noka" in Sesotho means "we are a river"). Its aim is to rehabilitate degraded watersheds across the country and to put in place prevention measures that will halt the further degradation of Lesotho"s catchment areas. The sustainable management of Lesotho"s catchments are of critical importance for water, land, energy and food security not only in Lesotho itself but in the entire Orange-Senqu Basin and Gauteng Province, one of Southern Africa"s economic centres. The GIZ has been commissioned by the EU and the BMZ as part of its transboundary water management (TWM) programme for Southern African Development Community (SADC) to implement a technical cooperation project (Action) to support ICM / ReNoka in Lesotho. The overall objective of the Action is that "ICM facilitates socio-economic development and adaptation to climate change in Lesotho", while the specific objective is "ICM is institutionalised and under full implementation in Lesotho, based on gender equality and climate adaptation principles". To achieve this objective, the Action work concurrently on five interlinked outputs: - Output 1: Effective and efficient, gender sensitive and climate-resilient policy framework for ICM is developed and applied. - Output 2: Effective and efficient institutions for ICM are established, with equitable representation of women and youth. - Output 3: Capacity, skills and knowledge of public, private sector and civil society for sustainable ICM is facilitated. - Output 4: ICM measures are implemented. - Output 5: Capacity strengthened for coordination, monitoring, supervision and general programme management. Lesotho is sub-divided into six Catchment Management Areas of (CMAs) to facilitate the planning and management of its three river basins (Senqu river basin, Mohokare river basin and Makhaleng river basin). The six CMAs are Upper Senqu, Lower Senqu, Upper Mohokare, Central Mohokare, Lower Mohokare and Makhaleng. Lesotho"s Long-term Water and Sanitation Strategy (2014) calls for the preparation of Integrated Catchment Management and Development Plans (ICMDPs) in consultation with stakeholders and guidelines for their elaboration as key components to support Integrated Catchment Management in Lesotho. So far two of the six ICMDPs have been elaborated, these are two ICMDPs for Upper Mohokare and Makhaleng CMAs. The objective of this assignment is therefore to elaborate four ICMDPs for the following CMAs: Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare.
Deadline
Die Frist für den Eingang der Angebote war 2025-09-30.
Die Ausschreibung wurde veröffentlicht am 2025-08-29.
Auftragsbekanntmachung (2025-08-29) Objekt Umfang der Beschaffung
Titel: 81319388 - Elaboration of 4 Integrated Catchment Management and Development Plans for the Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare Catchment Management Areas in Lesotho
Referenznummer: 81319388
Kurze Beschreibung:
The Government of Lesotho, with support from the EU and the BMZ, has embarked on an ambitious "National Programme for ICM (ReNoka)" ("re noka" in Sesotho means "we are a river"). Its aim is to rehabilitate degraded watersheds across the country and to put in place prevention measures that will halt the further degradation of Lesotho"s catchment areas. The sustainable management of Lesotho"s catchments are of critical importance for water, land, energy and food security not only in Lesotho itself but in the entire Orange-Senqu Basin and Gauteng Province, one of Southern Africa"s economic centres.
The GIZ has been commissioned by the EU and the BMZ as part of its transboundary water management (TWM) programme for Southern African Development Community (SADC) to implement a technical cooperation project (Action) to support ICM / ReNoka in Lesotho. The overall objective of the Action is that "ICM facilitates socio-economic development and adaptation to climate change in Lesotho", while the specific objective is "ICM is institutionalised and under full implementation in Lesotho, based on gender equality and climate adaptation principles". To achieve this objective, the Action work concurrently on five interlinked outputs:
- Output 1: Effective and efficient, gender sensitive and climate-resilient policy framework for ICM is developed and applied.
- Output 2: Effective and efficient institutions for ICM are established, with equitable representation of women and youth.
- Output 3: Capacity, skills and knowledge of public, private sector and civil society for sustainable ICM is facilitated.
- Output 4: ICM measures are implemented.
- Output 5: Capacity strengthened for coordination, monitoring, supervision and general programme management.
Lesotho is sub-divided into six Catchment Management Areas of (CMAs) to facilitate the planning and management of its three river basins (Senqu river basin, Mohokare river basin and Makhaleng river basin). The six CMAs are Upper Senqu, Lower Senqu, Upper Mohokare, Central Mohokare, Lower Mohokare and Makhaleng. Lesotho"s Long-term Water and Sanitation Strategy (2014) calls for the preparation of Integrated Catchment Management and Development Plans (ICMDPs) in consultation with stakeholders and guidelines for their elaboration as key components to support Integrated Catchment Management in Lesotho.
So far two of the six ICMDPs have been elaborated, these are two ICMDPs for Upper Mohokare and Makhaleng CMAs. The objective of this assignment is therefore to elaborate four ICMDPs for the following CMAs: Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare.
The Government of Lesotho, with support from the EU and the BMZ, has embarked on an ambitious "National Programme for ICM (ReNoka)" ("re noka" in Sesotho means "we are a river"). Its aim is to rehabilitate degraded watersheds across the country and to put in place prevention measures that will halt the further degradation of Lesotho"s catchment areas. The sustainable management of Lesotho"s catchments are of critical importance for water, land, energy and food security not only in Lesotho itself but in the entire Orange-Senqu Basin and Gauteng Province, one of Southern Africa"s economic centres.
The GIZ has been commissioned by the EU and the BMZ as part of its transboundary water management (TWM) programme for Southern African Development Community (SADC) to implement a technical cooperation project (Action) to support ICM / ReNoka in Lesotho. The overall objective of the Action is that "ICM facilitates socio-economic development and adaptation to climate change in Lesotho", while the specific objective is "ICM is institutionalised and under full implementation in Lesotho, based on gender equality and climate adaptation principles". To achieve this objective, the Action work concurrently on five interlinked outputs:
- Output 1: Effective and efficient, gender sensitive and climate-resilient policy framework for ICM is developed and applied.
- Output 2: Effective and efficient institutions for ICM are established, with equitable representation of women and youth.
- Output 3: Capacity, skills and knowledge of public, private sector and civil society for sustainable ICM is facilitated.
- Output 4: ICM measures are implemented.
- Output 5: Capacity strengthened for coordination, monitoring, supervision and general programme management.
Lesotho is sub-divided into six Catchment Management Areas of (CMAs) to facilitate the planning and management of its three river basins (Senqu river basin, Mohokare river basin and Makhaleng river basin). The six CMAs are Upper Senqu, Lower Senqu, Upper Mohokare, Central Mohokare, Lower Mohokare and Makhaleng. Lesotho"s Long-term Water and Sanitation Strategy (2014) calls for the preparation of Integrated Catchment Management and Development Plans (ICMDPs) in consultation with stakeholders and guidelines for their elaboration as key components to support Integrated Catchment Management in Lesotho.
So far two of the six ICMDPs have been elaborated, these are two ICMDPs for Upper Mohokare and Makhaleng CMAs. The objective of this assignment is therefore to elaborate four ICMDPs for the following CMAs: Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare.
Art des Vertrags: Dienstleistungen
Produkte/Dienstleistungen: Beratung in Umweltfragen📦
Geschätzter Wert ohne MwSt: 390 720 EUR 💰
Beschreibung
Interne Kennung: 81319388
Diese Auftragsvergabe ist auch für kleine und mittlere Unternehmen (KMU) geeignet ✅
Beschreibung der Beschaffung:
The objective of the assignment is to elaborate 4 Integrated Catchment Management and Development Plans (ICMDPs) for the 4 Catchment Management Areas (CMAs) of Lesotho namely: Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare. The elaboration of these four (4) ICMDPs in Lesotho will contribute to the programme objectives of "Action", "Support to Integrated Catchment Management in Lesotho (ICM)" which is part of the Transboundary Water Management in the SADC (TWM). Relevant specific objective of the action is "to ensure ICM is institutionalized and under full implementation in Lesotho, based on gender equality and climate adaptation principles and relevant indicator being "Number of climate resilient and gender sensitive Integrated Catchment Management and Development Plans (ICMDPs) at Catchment Management Area level based on national guidelines developed and approved by respective structures." This objective aligns with overall TWM module objectives:
The contractor is responsible for providing the following work packages and for achieving the corresponding deliverables below.
WP 1: Project planning and stakeholder engagement
Tasks
1.1: Thoroughly familiarizes with the ICM landscape in Lesotho, the goals of the national ICM program (ReNOKA) and carry out the kick-off meeting,
1.2: Development of methodology for stakeholder consultation and the desktop review.
1.3: Planning of activities and preparation of inception report
Deliverable WP 1: Inception report with detailed activity plan
WP 2: Situation analysis and diagnostic (problem) analysis
Tasks
2.1: Carry out a desktop data review according to the guidelines of annexes 2.
2.2: Conduct stakeholder consultations to collect additional relevant information and data about the 4 CMAs.
2.3: Elaboration of the situational analysis for the 4 CMAs according to annexes 1&2.
2.4: Elaboration of the diagnostic (problem) analysis for the 4 CMAs according to annexes 1&2
The consultant shall develop the situational analysis for the 4 CMAs according to the attached annexes 1&2 and perform a diagnostic (problem) analysis based on the findings of the situational analysis in the following sequence:
- Identification of the main ICM related problems for each CMA.
- Elaboration of cause - impact chains for each of the identified problems.
- Development of criteria to establish a ranking of Sub-Catchments where identified problems are most prominent (PSC listing).
Deliverable WP 2: Draft situation analysis and diagnostic analysis for the 4 CMAs
WP 3: Strategic Action Plan (SAP) and finalization of four (4) ICMDPs)
Tasks
3.1: Presentation of situational and diagnostic (problem) analysis and development of the SAP for the 4 ICMDPs during workshops.
3.2: Finalization of four (4) ICMDPs. The SAP must:
- Define the vision and strategic objectives for CMAs and define its strategic actions and interventions based on the diagnostic (problem) analysis and its causes - impact chains.
- Ensure that all strategic activities include climate change adaptation components.
- Design a medium term (5-year) strategic framework to guide the development of integrated sub-catchment management plans (ISCMPs) and local council action plans.
- Consider upstream and downstream linkages with other catchments.
- Identify multi-year integrated water resource management (IWRM) and development interventions.
- Elaborate on financing options and suggest a management and reporting structure for the implementation of SAP according to existing legal framework of Lesotho.
Deliverable WP 3: Strategic Action Plans for the 4 CMAs
The delivery of the assignment is planned for a duration of 7 months after award of the contract. The contractor will be responsible for steering the consultants, reporting, cost management, supplies and equipment, ensuring backstopping and data protection.
The objective of the assignment is to elaborate 4 Integrated Catchment Management and Development Plans (ICMDPs) for the 4 Catchment Management Areas (CMAs) of Lesotho namely: Upper Senqu, Lower Senqu, Central Mohokare and Lower Mohokare. The elaboration of these four (4) ICMDPs in Lesotho will contribute to the programme objectives of "Action", "Support to Integrated Catchment Management in Lesotho (ICM)" which is part of the Transboundary Water Management in the SADC (TWM). Relevant specific objective of the action is "to ensure ICM is institutionalized and under full implementation in Lesotho, based on gender equality and climate adaptation principles and relevant indicator being "Number of climate resilient and gender sensitive Integrated Catchment Management and Development Plans (ICMDPs) at Catchment Management Area level based on national guidelines developed and approved by respective structures." This objective aligns with overall TWM module objectives:
The contractor is responsible for providing the following work packages and for achieving the corresponding deliverables below.
WP 1: Project planning and stakeholder engagement
Tasks
1.1: Thoroughly familiarizes with the ICM landscape in Lesotho, the goals of the national ICM program (ReNOKA) and carry out the kick-off meeting,
1.2: Development of methodology for stakeholder consultation and the desktop review.
1.3: Planning of activities and preparation of inception report
Deliverable WP 1: Inception report with detailed activity plan
WP 2: Situation analysis and diagnostic (problem) analysis
Tasks
2.1: Carry out a desktop data review according to the guidelines of annexes 2.
2.2: Conduct stakeholder consultations to collect additional relevant information and data about the 4 CMAs.
2.3: Elaboration of the situational analysis for the 4 CMAs according to annexes 1&2.
2.4: Elaboration of the diagnostic (problem) analysis for the 4 CMAs according to annexes 1&2
The consultant shall develop the situational analysis for the 4 CMAs according to the attached annexes 1&2 and perform a diagnostic (problem) analysis based on the findings of the situational analysis in the following sequence:
- Identification of the main ICM related problems for each CMA.
- Elaboration of cause - impact chains for each of the identified problems.
- Development of criteria to establish a ranking of Sub-Catchments where identified problems are most prominent (PSC listing).
Deliverable WP 2: Draft situation analysis and diagnostic analysis for the 4 CMAs
WP 3: Strategic Action Plan (SAP) and finalization of four (4) ICMDPs)
Tasks
3.1: Presentation of situational and diagnostic (problem) analysis and development of the SAP for the 4 ICMDPs during workshops.
3.2: Finalization of four (4) ICMDPs. The SAP must:
- Define the vision and strategic objectives for CMAs and define its strategic actions and interventions based on the diagnostic (problem) analysis and its causes - impact chains.
- Ensure that all strategic activities include climate change adaptation components.
- Design a medium term (5-year) strategic framework to guide the development of integrated sub-catchment management plans (ISCMPs) and local council action plans.
- Consider upstream and downstream linkages with other catchments.
- Identify multi-year integrated water resource management (IWRM) and development interventions.
- Elaborate on financing options and suggest a management and reporting structure for the implementation of SAP according to existing legal framework of Lesotho.
Deliverable WP 3: Strategic Action Plans for the 4 CMAs
The delivery of the assignment is planned for a duration of 7 months after award of the contract. The contractor will be responsible for steering the consultants, reporting, cost management, supplies and equipment, ensuring backstopping and data protection.
Zusätzliche Informationen: #Besonders auch geeignet für:selbst#, #Besonders auch geeignet für:other-sme#
Zusätzliche Produkte/Dienstleistungen:
Ziel der strategischen Auftragsvergabe: Verringerung der Auswirkungen auf die Umwelt
See Terms of Reference
Konzept zur Verringerung der Umweltauswirkungen: Anpassung an den Klimawandel
Gefördertes soziales Ziel: Gleichstellung der Geschlechter
Stadt: Lesotho
Land: Lesotho 🇱🇸 Dauer
Datum des Beginns: 2025-12-15 📅
Datum des Endes: 2026-06-30 📅
Beschreibung
Maximale Verlängerungen: 2
Weitere Informationen zur Verlängerung:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Informationen über Optionen
Optionen ✅
Beschreibung der Optionen:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Titel
Los-Identifikationsnummer: LOT-0001
Verfahren Art des Verfahrens
Offenes Verfahren ✅
Rechtsgrundlage: Richtlinie 2014/24/EU
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2025-09-30 12:00:00 📅
Bedingungen für die Öffnung der Angebote: 2025-09-30 12:00:00 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 182 Tage Bedingungen für die Einreichung eines Angebots
Die Bieter können mehrere Angebote einreichen
Eröffnungstermin: 2025-09-30 12:00:00 📅
Elektronische Rechnungsstellung: Erforderlich
Die elektronische Bestellung wird verwendet ✅
Elektronische Zahlung wird verwendet ✅
Frist für die Anforderung zusätzlicher Informationen: 2025-09-22 23:59:59 📅
Zusätzliche Informationen:
GIZ asks the applicant or bidder to submit, complete or correct documents, within the framework laid down by law.
Der Vertrag enthält Bedingungen zur Vertragsausführung ✅
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Eignungskriterium: Andere wirtschaftliche oder finanzielle Anforderungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligbility criteria are not from the same category as stipulated above, as there is no suitable category.
1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin.
2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG, EU-Russia sanctions
3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Liste und kurze Beschreibung der Regeln und Kriterien
EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligbility criteria are not from the same category as stipulated above, as there is no suitable category.
1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin.
2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG, EU-Russia sanctions
3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Eignungskriterium: Referenzen zu bestimmten Dienstleistungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-B1: Technical and professional ability (Mit dem Angebot; Mittels Eigenerklärung): 1. The technical assessment is only based on reference projects with a minimum commission value of 50000 EUR.
2. At least 3 reference projects in the technical field Integrated Catchment Management and/or Integrated Water Resources Management and thereof at least 1 reference project in the Southern Africa Region in the last 36 months (deadline: date of publication of invitation to tender).
Liste und kurze Beschreibung der Regeln und Kriterien
EN-B1: Technical and professional ability (Mit dem Angebot; Mittels Eigenerklärung): 1. The technical assessment is only based on reference projects with a minimum commission value of 50000 EUR.
2. At least 3 reference projects in the technical field Integrated Catchment Management and/or Integrated Water Resources Management and thereof at least 1 reference project in the Southern Africa Region in the last 36 months (deadline: date of publication of invitation to tender).
Eignungskriterium: Durchschnittlicher Jahresumsatz
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-C1: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 500000 EUR.
Liste und kurze Beschreibung der Regeln und Kriterien
EN-C1: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 500000 EUR.
EN-C2: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average number of employees and managers in the last three calendar years, at least 10 persons.
Bedingungen für den Vertrag
Bedingungen für die Vertragserfüllung:
The execution conditions result from the information given in the contract notice and the tender documents.
Bedingungen für die Teilnahme
Ausschlussgrund:
Beteiligung an einer kriminellen Vereinigung
Betrug
Der Zahlungsunfähigkeit vergleichbare Lage gemäß nationaler Rechtsvorschriften
+ 19 weitere
Direkte oder indirekte Beteiligung an der Vorbereitung des Vergabeverfahrens
Einstellung der gewerblichen Tätigkeit
Geldwäsche oder Terrorismusfinanzierung
Interessenkonflikt aufgrund seiner Teilnahme an dem Vergabeverfahren
Kinderarbeit und andere Formen des Menschenhandels
Korruption
Schwerwiegendes berufliches Fehlverhalten
Terroristische Straftaten oder Straftaten im Zusammenhang mit terroristischen Aktivitäten
Täuschung, Zurückhaltung von Informationen, Unfähigkeit zur Vorlage erforderlicher Unterlagen oder Erlangung vertraulicher Informationen zu dem Verfahren
Vereinbarungen mit anderen Wirtschaftsteilnehmern zur Verzerrung des Wettbewerbs
Verstoß gegen arbeitsrechtliche Verpflichtungen
Verstoß gegen die in den rein innerstaatlichen Ausschlussgründen verankerten Verpflichtungen
Verstoß gegen die Verpflichtung zur Entrichtung von Sozialversicherungsbeiträgen
Verstoß gegen die Verpflichtung zur Entrichtung von Steuern
Verstoß gegen sozialrechtliche Verpflichtungen
Verstoß gegen umweltrechtliche Verpflichtungen
Verwaltung der Vermögenswerte durch einen Insolvenzverwalter
Vorzeitige Beendigung, Schadensersatz oder andere vergleichbare Sanktionen
Bekanntmachungs-ID: CXTRYY6YTF57NQK7
All communication takes place in English via communication tool in the project area of the procurement portal.
Körper überprüfen
Name: Vergabekammern des Bundes
Nationale Registrierungsnummer: 022894990
Postanschrift: Kaiser-Friedrich-Straße 16
Postleitzahl: 53113
Postort: Bonn
Region: Bonn, Kreisfreie Stadt
🏙️
Land: Deutschland 🇩🇪
E-Mail: vk@bundeskartellamt.bund.de📧
Telefon: +49 2289499-0📞 Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Informationen über elektronische Arbeitsabläufe
Die elektronische Rechnungsstellung wird akzeptiert
Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2025-08-29+02:00 📅
Quelle: OJS 2025/S 166-566953 (2025-08-29)
Auftragsbekanntmachung (2025-09-03) Objekt Umfang der Beschaffung
Geschätzter Wert ohne MwSt: 390 720 EUR 💰
Verfahren Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2025-10-10 12:00:00 📅
Bedingungen für die Öffnung der Angebote: 2025-10-10 12:00:00 📅
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 172 Tage Bedingungen für die Einreichung eines Angebots
Eröffnungstermin: 2025-10-10 12:00:00 📅
Frist für die Anforderung zusätzlicher Informationen: 2025-09-29 23:59:59 📅
Ergänzende Informationen Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2025-09-03+02:00 📅
Änderungen Zu berichtigender Text in der ursprünglichen Bekanntmachung
Nummer des Abschnitts: PROCEDURE Neuer Wert
Text:
The deadline for submitting of bids has been extended to 10 October 2025, 12:00 noon (Berlin, Germany time zone)
Andere zusätzliche Informationen
The deadline for submitting of bids has been extended to 10 October 2025, 12:00 noon (Berlin, Germany time zone)
Hauptgrund für die Änderung: Aktualisierte Informationen
Angaben zu Änderungen
Fassung der zu ändernden vorigen Bekanntmachung: 6fc1f8bc-d9a5-48ed-b714-f5cfb2e42f75-01
Quelle: OJS 2025/S 169-578914 (2025-09-03)
Auftragsbekanntmachung (2025-09-22) Objekt Umfang der Beschaffung
Geschätzter Wert ohne MwSt: 390 720 EUR 💰
#Bekanntmachungs-ID: CXTRYY6YTF57NQK7#
All communication takes place in English via communication tool in the project area of the procurement portal.
Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2025-09-22+02:00 📅
Änderungen Zu berichtigender Text in der ursprünglichen Bekanntmachung
Nummer des Abschnitts: PROCEDURE Neuer Wert
Text:
Due to a bidder question, the template for CV in EU format has been added to the tender documents.
Andere zusätzliche Informationen
Due to a bidder question, the template for CV in EU format has been added to the tender documents.
Hauptgrund für die Änderung: Aktualisierte Informationen
Angaben zu Änderungen
Fassung der zu ändernden vorigen Bekanntmachung: f744c00d-7ace-4c5c-a4aa-f1ce6932911f-01
Quelle: OJS 2025/S 182-619520 (2025-09-22)