81319783 - Technical assistance on resources mobilisation for integrated water catchment management and landscape protection in Zambia

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

The Integrated Water Catchment Management and Landscape Protection (AWARE 2.0) project is co-financed by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ) and implemented by GIZ. It is part of the broader Green Partnership and Investment Programme under the GREEN NEXUS initiative, which promotes sustainable development and green recovery across the Zambian part of the Greater Kavango Zambezi (KAZA) Trans-Frontier Conservation Area (TFCA). The project covers a diverse ecological landscape from the Greater Kafue ecosystem in the southwest to the Luangwa-Nyika corridors in central and eastern Zambia. AWARE 2.0 aims to improve integrated water catchment management and landscape protection, with a focus on agriculture, forestry, biodiversity, water, and climate. In Zambia, its lead government partners are the Ministry of Water Development and Sanitation (MWDS), the Ministry of Green Economy and Environment (MGEE), and the Water Resources Management Authority (WARMA). The project works at both national and sub-national levels, with a geographic focus on the Lower Kafue Sub-Catchment (LKSC). It addresses four key outputs: (1) Improved capacities of the central government to execute its mandate for the integrated management of water catchments, including landscape protection with a focus on climate adaptation; (2) Improved capacities of decentralised authorities to plan, protect and sustainably manage water catchment ecosystems with focus on climate adaptation in the selected landscape; (3) Improved capacities of Water Resources Management (WRM) governance structures to sustainably manage water resource disputes in the LKSC; and (4) Scaled-up measures for water catchment management, landscape restoration and protection and climate adaptation Despite growing environmental challenges, IWCM and landscape restoration in Zambia remain severely underfunded. Key barriers include limited economic data on the benefits of restoration, fragmented resource mobilization efforts, and minimal private sector engagement beyond CSR. In response, AWARE 2.0 is supporting a set of interlinked activities to enable sustainable resource mobilization for restoration in the LKSC and beyond. To this end, AWARE 2.0 seeks consultancy support in three critical areas: (1) conducting an economic modelling analysis to quantify the benefits of watershed restoration and NbS interventions, particularly to inform the Ministry of Finance and National Planning; (2) supporting the development and validation of an implementation-oriented financing strategy for IWCM and landscape protection; and (3) facilitating multi-stakeholder partnerships to mobilize long-term investments.

Deadline

Die Frist für den Eingang der Angebote war 2025-10-27. Die Ausschreibung wurde veröffentlicht am 2025-09-24.

Wer? Wie? Wo?
Geschichte der Beschaffung
Datum Dokument
2025-09-24 Auftragsbekanntmachung
Auftragsbekanntmachung (2025-09-24)
Objekt
Umfang der Beschaffung
Titel: 81319783 - Technical assistance on resources mobilisation for integrated water catchment management and landscape protection in Zambia
Referenznummer: 81319783
Kurze Beschreibung:
The Integrated Water Catchment Management and Landscape Protection (AWARE 2.0) project is co-financed by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ) and implemented by GIZ. It is part of the broader Green Partnership and Investment Programme under the GREEN NEXUS initiative, which promotes sustainable development and green recovery across the Zambian part of the Greater Kavango Zambezi (KAZA) Trans-Frontier Conservation Area (TFCA). The project covers a diverse ecological landscape from the Greater Kafue ecosystem in the southwest to the Luangwa-Nyika corridors in central and eastern Zambia. AWARE 2.0 aims to improve integrated water catchment management and landscape protection, with a focus on agriculture, forestry, biodiversity, water, and climate. In Zambia, its lead government partners are the Ministry of Water Development and Sanitation (MWDS), the Ministry of Green Economy and Environment (MGEE), and the Water Resources Management Authority (WARMA). The project works at both national and sub-national levels, with a geographic focus on the Lower Kafue Sub-Catchment (LKSC). It addresses four key outputs: (1) Improved capacities of the central government to execute its mandate for the integrated management of water catchments, including landscape protection with a focus on climate adaptation; (2) Improved capacities of decentralised authorities to plan, protect and sustainably manage water catchment ecosystems with focus on climate adaptation in the selected landscape; (3) Improved capacities of Water Resources Management (WRM) governance structures to sustainably manage water resource disputes in the LKSC; and (4) Scaled-up measures for water catchment management, landscape restoration and protection and climate adaptation Despite growing environmental challenges, IWCM and landscape restoration in Zambia remain severely underfunded. Key barriers include limited economic data on the benefits of restoration, fragmented resource mobilization efforts, and minimal private sector engagement beyond CSR. In response, AWARE 2.0 is supporting a set of interlinked activities to enable sustainable resource mobilization for restoration in the LKSC and beyond. To this end, AWARE 2.0 seeks consultancy support in three critical areas: (1) conducting an economic modelling analysis to quantify the benefits of watershed restoration and NbS interventions, particularly to inform the Ministry of Finance and National Planning; (2) supporting the development and validation of an implementation-oriented financing strategy for IWCM and landscape protection; and (3) facilitating multi-stakeholder partnerships to mobilize long-term investments.
Mehr anzeigen
Art des Vertrags: Dienstleistungen
Produkte/Dienstleistungen: Umweltschutz 📦
Beschreibung
Interne Kennung: 81319783
Diese Auftragsvergabe ist auch für kleine und mittlere Unternehmen (KMU) geeignet
Beschreibung der Beschaffung:
The Integrated Water Catchment Management and Landscape Protection (AWARE 2.0) project is co-financed by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ) and is being implemented by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH. AWARE 2.0 forms a strategic component of the broader Green Partnership and Investment Programme under the GREEN NEXUS framework. This overarching programme promotes sustainable development and green recovery across sectors-agriculture, forestry, biodiversity, water, and climate-in the Zambian portion of the Greater Kavango Zambezi Trans-Frontier Conservation Area (KAZA TFCA). The geographic focus of the AWARE 2.0 project spans ecologically significant landscapes, including the Greater Kafue ecosystem in the southwest and the Luangwa-Nyika corridors in central and eastern Zambia. Together, these areas form a diverse and interconnected "landscape" targeted for integrated and sustainable management. The project is aligned with Zambia"s policy commitments on climate resilience, water governance, and ecosystem restoration. AWARE 2.0 aims to strengthen integrated water catchment management (IWCM) and landscape protection in Zambia. The project works with key national counterparts including the Ministry of Water Development and Sanitation (MWDS), the Ministry of Green Economy and Environment (MGEE), and the Water Resources Management Authority (WARMA). The intervention targets both national-level institutions and sub-national actors, with a particular focus on the Lower Kafue Sub-Catchment (LKSC). The project is structured around four interlinked outputs: i. Strengthened capacities of central government institutions to execute their mandates related to IWCM, landscape protection, and climate adaptation. ii. Improved institutional and technical capacity of decentralized authorities to plan, protect, and sustainably manage water catchments and ecosystems within a changing climate. iii. Enhanced functionality of water governance structures in managing water-related disputes in the LKSC. iv. Scaled-up implementation of on-the-ground measures for water catchment management, ecosystem restoration, and climate adaptation. While policy frameworks exist, Zambia continues to face severe underfunding in the areas of catchment management and landscape restoration. Several challenges impede resource mobilization: a lack of robust economic valuation of NbS and restoration benefits, weak intersectoral coordination in financing, and limited private sector engagement beyond corporate social responsibility (CSR) approaches. To address these constraints and unlock sustainable financing, AWARE 2.0 Project will implement a strategic intervention across three interconnected thematic areas. Accordingly, GIZ seeks consultancy services to support the following work packages: - Economic Modelling Analysis (WP 1): Conduct an in-depth economic modelling analysis to quantify the environmental and socio-economic benefits of watershed restoration and nature-based solutions (NbS). The analysis will primarily inform the Ministry of Finance and National Planning (MoFNP) and provide evidence for future investment cases. - Financing Strategy Development (WP 2): Support the co-creation and validation of an implementation-oriented national financing strategy for IWCM and landscape protection. The strategy should be informed by WP 1 and reflect the needs and capacities of national and sub-national stakeholders. - Partnership Facilitation (WP 3): Facilitate the establishment of multi-stakeholder partnerships, including those with development partners, private sector actors, and civil society organizations, to scale up resource mobilization for restoration and climate adaptation efforts. These three work packages are designed to function as an integrated whole. WP 1 serves as the analytical foundation for both WP 2 and WP 3. The economic insights generated will directly inform the design of the financing strategy and identify high-impact areas for investment and collaboration. WP 2 builds on this evidence to shape feasible, context-specific financing pathways, while WP 3 translates this groundwork into practical partnerships that can mobilize both financial and technical resources. The interdependence of the work packages is not only conceptual but operational. Attempting to divide them into separate lots risks undermining the internal logic of the intervention. It would lead to fragmentation, misalignment between outputs, increased coordination burdens, and ultimately diminished effectiveness. Managing each component in isolation would also introduce accountability challenges and raise transaction costs, especially in a context requiring cross-sectoral collaboration. The integrated implementation of these work packages reflects a systems-thinking approach, one that acknowledges the complexity of water governance and the necessity of synchronizing technical, financial, and institutional interventions. Delivering these work streams as a cohesive package will ensure consistent flow of information, operational efficiency, better value for money, and stronger long-term impact. Therefore, GIZ emphasizes that the three work packages must be implemented jointly under a single contract. The selected consultancy or consortium must demonstrate the technical capacity to deliver across all three thematic areas while maintaining alignment with stakeholder expectations and national priorities. This tender represents a key opportunity to support Zambia"s ambitions in building a resilient, well-financed, and sustainably managed water and landscape system.
Mehr anzeigen
Zusätzliche Informationen: #Besonders auch geeignet für:selbst#, #Besonders auch geeignet für:other-sme#
Zusätzliche Produkte/Dienstleistungen: Veranstaltung von Seminaren 📦
Ziel der strategischen Auftragsvergabe: Verringerung der Auswirkungen auf die Umwelt
Please see the Terms of Reference
Konzept zur Verringerung der Umweltauswirkungen: Klimaschutz
Gefördertes soziales Ziel: Gleichstellung der Geschlechter
Stadt: Sambia
Land: Sambia 🇿🇲
Dauer
Datum des Beginns: 2026-01-26 📅
Datum des Endes: 2028-01-31 📅
Beschreibung
Maximale Verlängerungen: 2
Weitere Informationen zur Verlängerung:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Informationen über Optionen
Optionen
Beschreibung der Optionen:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Titel
Los-Identifikationsnummer: LOT-0001

Verfahren
Art des Verfahrens
Offenes Verfahren
Rechtsgrundlage: Richtlinie 2014/24/EU
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2025-10-27 12:00:00 📅
Bedingungen für die Öffnung der Angebote: 2025-10-27 12:00:00 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 185 Tage
Bedingungen für die Einreichung eines Angebots
Die Bieter können mehrere Angebote einreichen
Eröffnungstermin: 2025-10-27 12:00:00 📅
Elektronische Rechnungsstellung: Erforderlich
Die elektronische Bestellung wird verwendet
Elektronische Zahlung wird verwendet
Frist für die Anforderung zusätzlicher Informationen: 2025-10-17 23:59:59 📅
Zusätzliche Informationen:
GIZ asks the applicant or bidder to submit, complete or correct documents, within the framework laid down by law.
Der Vertrag enthält Bedingungen zur Vertragsausführung

Rechtliche, wirtschaftliche, finanzielle und technische Informationen
Bedingungen für die Teilnahme
Eignungskriterium: Andere wirtschaftliche oder finanzielle Anforderungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligbility criteria are not from the same category as stipulated above, as there is no suitable category. 1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin. 2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG, EU-Russia sanctions 3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Mehr anzeigen
Eignungskriterium: Referenzen zu bestimmten Dienstleistungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-B1: Technical and professional ability (Mit dem Angebot; Mittels Eigenerklärung): 1. The technical assessment is only based on reference projects with a minimum commission value of 200000 EUR. 2. At least 3 reference projects in the technical field strategy development and/or mobilization of financial resources for natural resources management focussing on nature based solutions and/or water catchment management and/or climate adaptation and at least 2 reference projects in the region in Southern and/or Eastern Africa in the last 36 months (deadline: date of publication of invitation to tender).
Mehr anzeigen
Eignungskriterium: Durchschnittlicher Jahresumsatz
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-C1: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 900000 EUR.
Mehr anzeigen
EN-C2: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average number of employees and managers in the last three calendar years, at least 10 persons.
Bedingungen für den Vertrag
Bedingungen für die Vertragserfüllung:
The execution conditions result from the information given in the contract notice and the tender documents.
Bedingungen für die Teilnahme
Ausschlussgrund:
Beteiligung an einer kriminellen Vereinigung
Betrug
Der Zahlungsunfähigkeit vergleichbare Lage gemäß nationaler Rechtsvorschriften
+ 19 weitere
Direkte oder indirekte Beteiligung an der Vorbereitung des Vergabeverfahrens
Einstellung der gewerblichen Tätigkeit
Geldwäsche oder Terrorismusfinanzierung
Interessenkonflikt aufgrund seiner Teilnahme an dem Vergabeverfahren
Kinderarbeit und andere Formen des Menschenhandels
Korruption
Schwerwiegendes berufliches Fehlverhalten
Terroristische Straftaten oder Straftaten im Zusammenhang mit terroristischen Aktivitäten
Täuschung, Zurückhaltung von Informationen, Unfähigkeit zur Vorlage erforderlicher Unterlagen oder Erlangung vertraulicher Informationen zu dem Verfahren
Vereinbarungen mit anderen Wirtschaftsteilnehmern zur Verzerrung des Wettbewerbs
Verstoß gegen arbeitsrechtliche Verpflichtungen
Verstoß gegen die in den rein innerstaatlichen Ausschlussgründen verankerten Verpflichtungen
Verstoß gegen die Verpflichtung zur Entrichtung von Sozialversicherungsbeiträgen
Verstoß gegen die Verpflichtung zur Entrichtung von Steuern
Verstoß gegen sozialrechtliche Verpflichtungen
Verstoß gegen umweltrechtliche Verpflichtungen
Verwaltung der Vermögenswerte durch einen Insolvenzverwalter
Vorzeitige Beendigung, Schadensersatz oder andere vergleichbare Sanktionen
Zahlungsunfähigkeit
Beschreibung der Ausschlussgründe:
In accordance with §§ 123,124 GWB, § 22 LkSG
In accordance with §§ 123,124 GWB

Öffentlicher Auftraggeber
Name und Adressen
Name: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Nationale Registrierungsnummer: 993-80072-52
Postanschrift: Dag-Hammarskjöld-Weg 1 - 5
Postleitzahl: 65760
Postort: Eschborn
Region: Main-Taunus-Kreis 🏙️
Land: Deutschland 🇩🇪
E-Mail: zuhal.uysal@giz.de 📧
Telefon: +49 6196791481 📞
Fax: +49 6196791115 📠
URL: https://www.giz.de 🌏
Art des öffentlichen Auftraggebers
Einrichtung des öffentlichen Rechts
Haupttätigkeit
Allgemeine öffentliche Verwaltung
Kommunikation
Dokumente URL: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTAMDFHA5/documents 🌏
Teilnahme-URL: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTAMDFHA5 🌏
URL des Beschaffungsinstruments: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTAMDFHA5 🌏
Elektronische Einreichung: Erforderlich

Ergänzende Informationen
Zusätzliche Informationen
#Bekanntmachungs-ID: CXTRYY6YTAMDFHA5# All communication takes place in English via communication tool in the project area of the procurement portal.
Körper überprüfen
Name: Vergabekammern des Bundes
Nationale Registrierungsnummer: 02284990
Postanschrift: Kaiser-Friedrich-Straße 16
Postleitzahl: 53113
Postort: Bonn
Region: Bonn, Kreisfreie Stadt 🏙️
Land: Deutschland 🇩🇪
E-Mail: vk@bundeskartellamt.bund.de 📧
Telefon: +49 228 9499-0 📞
Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as 1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected, 2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice. 3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids, 4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint. Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Mehr anzeigen
Informationen über elektronische Arbeitsabläufe
Die elektronische Rechnungsstellung wird akzeptiert
Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2025-09-24+02:00 📅
Quelle: OJS 2025/S 184-629145 (2025-09-24)