LOT 1: Combined Property Damage and Business Interruption (optional) All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 1, consisting of 21 offshore wind turbines (total capacity of 48.3 MW) including foundations, inter-array cables and offshore substation . Sum Insured (PD): 150,831,000 EUR Sum Insured (BI - 18 months - optional): 22,418,929 EUR Single Loss Limit PD+BI incl. additional limits (any Occurrence): 107,340,000 EUR . Option a) Offer / Placement - "Stand-alone" for Baltic 1 Option b) Combined Offer / Placement with Baltic 2 & Hohe See ("Kopplungsangebot") . LOT 2: Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 2, consisting of 80 offshore wind turbines (total capacity of 288 MW) including foundations, inter-array cables and offshore substation. . Sum Insured (PD): 1,190,000,000 EUR Sum Insured (BI - 18 months): 238,598,354 EUR Single Loss Limit PD+BI incl. additional limits (any Occurrence): 460,520,000 EUR . Option a) Offer / Placement - "Stand-alone" for Baltic 2 Option b) Combined Offer / Placement with Baltic 1 & Hohe See ("Kopplungsangebot") . LOT 3: Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Hohe See, consisting of 71 offshore wind turbines (total capacity of 497 MW) including foundations, inter-array cables and offshore substation. . Sum Insured (PD): 1,599,138,000 EUR Sum Insured (BI - 18 months): 518,919,985 EUR Single Loss Limit PD+BI incl. additional limits (any Occurrence): 790,305,000 EUR . Option a) Offer / Placement - "Stand-alone" for Hohe See Option b) Combined Offer / Placement with Baltic 1 & Baltic 2 ("Kopplungsangebot") .
Deadline
Die Frist für den Eingang der Angebote war 2023-07-07.
Die Ausschreibung wurde veröffentlicht am 2023-06-19.
Auftragsbekanntmachung (2023-06-19) Objekt Umfang der Beschaffung
Titel: Maschinenbetriebsversicherungen
Kurze Beschreibung:
LOT 1:
Combined Property Damage and Business Interruption (optional) All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 1, consisting of 21 offshore wind turbines (total capacity of 48.3 MW) including foundations, inter-array cables and offshore substation
.
Sum Insured (PD): 150,831,000 EUR
Sum Insured (BI - 18 months - optional): 22,418,929 EUR
Single Loss Limit PD+BI incl. additional limits (any Occurrence): 107,340,000 EUR
.
Option a) Offer / Placement - "Stand-alone" for Baltic 1
Option b) Combined Offer / Placement with Baltic 2 & Hohe See ("Kopplungsangebot")
.
LOT 2:
Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 2, consisting of 80 offshore wind turbines (total capacity of 288 MW) including foundations, inter-array cables and offshore substation.
.
Sum Insured (PD): 1,190,000,000 EUR
Sum Insured (BI - 18 months): 238,598,354 EUR
Single Loss Limit PD+BI incl. additional limits (any Occurrence): 460,520,000 EUR
.
Option a) Offer / Placement - "Stand-alone" for Baltic 2
Option b) Combined Offer / Placement with Baltic 1 & Hohe See ("Kopplungsangebot")
.
LOT 3:
Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Hohe See, consisting of 71 offshore wind turbines (total capacity of 497 MW) including foundations, inter-array cables and offshore substation.
.
Sum Insured (PD): 1,599,138,000 EUR
Sum Insured (BI - 18 months): 518,919,985 EUR
Single Loss Limit PD+BI incl. additional limits (any Occurrence): 790,305,000 EUR
.
Option a) Offer / Placement - "Stand-alone" for Hohe See
Option b) Combined Offer / Placement with Baltic 1 & Baltic 2 ("Kopplungsangebot")
.
Combined Property Damage and Business Interruption (optional) All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 1, consisting of 21 offshore wind turbines (total capacity of 48.3 MW) including foundations, inter-array cables and offshore substation
.
Sum Insured (PD): 150,831,000 EUR
Sum Insured (BI - 18 months - optional): 22,418,929 EUR
Single Loss Limit PD+BI incl. additional limits (any Occurrence): 107,340,000 EUR
.
Option a) Offer / Placement - "Stand-alone" for Baltic 1
Option b) Combined Offer / Placement with Baltic 2 & Hohe See ("Kopplungsangebot")
.
LOT 2:
Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 2, consisting of 80 offshore wind turbines (total capacity of 288 MW) including foundations, inter-array cables and offshore substation.
.
Sum Insured (PD): 1,190,000,000 EUR
Sum Insured (BI - 18 months): 238,598,354 EUR
Single Loss Limit PD+BI incl. additional limits (any Occurrence): 460,520,000 EUR
.
Option a) Offer / Placement - "Stand-alone" for Baltic 2
Option b) Combined Offer / Placement with Baltic 1 & Hohe See ("Kopplungsangebot")
.
LOT 3:
Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Hohe See, consisting of 71 offshore wind turbines (total capacity of 497 MW) including foundations, inter-array cables and offshore substation.
.
Sum Insured (PD): 1,599,138,000 EUR
Sum Insured (BI - 18 months): 518,919,985 EUR
Single Loss Limit PD+BI incl. additional limits (any Occurrence): 790,305,000 EUR
.
Option a) Offer / Placement - "Stand-alone" for Hohe See
Option b) Combined Offer / Placement with Baltic 1 & Baltic 2 ("Kopplungsangebot")
.
Metadaten der Bekanntmachung
Originalsprache: Englisch 🗣️
Dokumenttyp: Auftragsbekanntmachung
Art des Auftrags: Dienstleistungen
Verordnung: Europäische Union
Gemeinsames Vokabular für öffentliche Aufträge (CPV)
Code: Maschinenbetriebsversicherungen📦
Zusätzlicher CPV-Code: Maschinenbetriebsversicherungen📦 Ort der Leistung
NUTS-Region: Biberach
🏙️
Verfahren
Verfahrensart: Verhandlungsverfahren
Angebotsart: Angebot für alle Lose
Vergabekriterien
Wirtschaftlichstes Angebot
Referenz Daten
Absendedatum: 2023-06-19 📅
Einreichungsfrist: 2023-07-07 📅
Veröffentlichungsdatum: 2023-06-22 📅
Datum des Beginns: 2024-01-01 📅
Datum des Endes: 2026-12-31 📅
Kennungen
Bekanntmachungsnummer: 2023/S 119-375502
ABl. S-Ausgabe: 119
Objekt Umfang der Beschaffung
Kurze Beschreibung:
LOT 1:
Combined Property Damage and Business Interruption (optional) All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 1, consisting of 21 offshore wind turbines (total capacity of 48.3 MW) including foundations, inter-array cables and offshore substation
Combined Property Damage and Business Interruption (optional) All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 1, consisting of 21 offshore wind turbines (total capacity of 48.3 MW) including foundations, inter-array cables and offshore substation
Sum Insured (PD): 150,831,000 EUR
Sum Insured (BI - 18 months - optional): 22,418,929 EUR
Single Loss Limit PD+BI incl. additional limits (any Occurrence): 107,340,000 EUR
Option a) Offer / Placement - "Stand-alone" for Baltic 1
Option b) Combined Offer / Placement with Baltic 2 & Hohe See ("Kopplungsangebot")
LOT 2:
Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 2, consisting of 80 offshore wind turbines (total capacity of 288 MW) including foundations, inter-array cables and offshore substation.
Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Baltic 2, consisting of 80 offshore wind turbines (total capacity of 288 MW) including foundations, inter-array cables and offshore substation.
Sum Insured (PD): 1,190,000,000 EUR
Sum Insured (BI - 18 months): 238,598,354 EUR
Single Loss Limit PD+BI incl. additional limits (any Occurrence): 460,520,000 EUR
Option a) Offer / Placement - "Stand-alone" for Baltic 2
Option b) Combined Offer / Placement with Baltic 1 & Hohe See ("Kopplungsangebot")
LOT 3:
Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Hohe See, consisting of 71 offshore wind turbines (total capacity of 497 MW) including foundations, inter-array cables and offshore substation.
Combined Property Damage and Business Interruption All Risks Insurance for the operational phase of the offshore wind farm EnBW Hohe See, consisting of 71 offshore wind turbines (total capacity of 497 MW) including foundations, inter-array cables and offshore substation.
Sum Insured (PD): 1,599,138,000 EUR
Sum Insured (BI - 18 months): 518,919,985 EUR
Single Loss Limit PD+BI incl. additional limits (any Occurrence): 790,305,000 EUR
Option a) Offer / Placement - "Stand-alone" for Hohe See
Option b) Combined Offer / Placement with Baltic 1 & Baltic 2 ("Kopplungsangebot")
Bezeichnung des Loses: EnBW Baltic 1 - Operational All Risk Insurance
Losnummer: 1
Beschreibung der Verlängerungen:
Prolongation of another 12 months by tacit renewal.
Further information on options will be deliverered with the explanation to tender.
Beschreibung der Optionen:
Option a) Offer / Placement - "Stand-alone" for Baltic 1
Option b) Combined Offer / Placement with Baltic 2 & Hohe See ("Kopplungsangebot")
Bezeichnung des Loses: EnBW Baltic 2 - Operational All Risk Insurance
Losnummer: 2
Beschreibung der Optionen:
Option a) Offer / Placement - "Stand-alone" for Baltic 2
Option b) Combined Offer / Placement with Baltic 1 & Hohe See ("Kopplungsangebot")
Bezeichnung des Loses: EnBW Hohe See - Operational All Risk Insurance
Losnummer: 3
Kurze Beschreibung: Sum Insured (BI - 18 months): 518,919,985 EUR
Beschreibung der Optionen:
Option a) Offer / Placement - "Stand-alone" for Hohe See
Option b) Combined Offer / Placement with Baltic 1 & Baltic 2 ("Kopplungsangebot")
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Befähigung zur Berufsausübung:
1. Permission for the business concern as insurers in accordance with §§ 8 ff., 61 ff. VAG or equal under foreign law. (see No 1. of the "GENERAL REQUIREMENTS" of the "Participation Application Document").
2. Signed Non-Disclosure Agreements (NDAs - one for each LOT) (see No 2. of the "GENERAL REQUIREMENTS" of the "Participation Application Document").
Please submit this information via the attached "Partcipation Application Document". Please note that these criteria need to be proofed by supporting documents.
Wirtschaftliche und finanzielle Leistungsfähigkeit:
3. Confirmation is required that a minimum rating of A- according to Standard & Poor´s or equivalent exists.
(see No 3. of the "GENERAL REQUIREMENTS" of the "Participation Application Document").
Please submit this information via the attached "Partcipation Application Document". Please note that this criteria needs to be proofed by supporting documents.
Technische und berufliche Fähigkeiten:
In addition to the "GENERAL REQUIREMENTS", bidders for a LEADING QUOTE need to provide the following references (see "Information for Leading Insurer" of the "Participation Application Document"):
a. Experienced Offshore underwriting capabilities (key personnel) in a leading role.
b. The minimum subscription quote for a leading quote is 15%.
c. The claims service with in-house offshore risk engineer(s) and/or claims manager(s) must be always available at short notice.
Please submit this information via the attached "Partcipation Application Document". Supporting documents on references need to be provided on request only.
In addition to the "GENERAL REQUIREMENTS", bidders for a CO-INSURANCE QUOTE need to provide the following information (see "Information for Co-Insurer" of the "Participation Application Document"):
a. Regarding the offer for a co-insurance quote only bidders are accepted which generally confirm their readiness to accept the Full Following Form without reservations.
b. Expected participating share - non-binding -
Please submit this information via the attached "Partcipation Application Document".
Liste und kurze Beschreibung der Regeln und Kriterien:
In order to participate in this procedure, it is necessary to register at subreport ELViS and download the information after registration. Please note that unregistered participants cannot be considered. This contract notice as well as the download of information is available under https://www.subreport.de/E18553959.
Liste und kurze Beschreibung der Regeln und Kriterien
In order to participate in this procedure, it is necessary to register at subreport ELViS and download the information after registration. Please note that unregistered participants cannot be considered. This contract notice as well as the download of information is available under https://www.subreport.de/E18553959.
In case of any technical issues, please contact subreport ELViS via phone (+49 221 98578-0) or via email (info@subreport.de ).
Verfahren
Rechtsgrundlage: 32014L0025
Zeitpunkt des Eingangs der Angebote: 12:00
Datum der Absendung der Aufforderungen: 2023-07-17 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Gültigkeitsdauer des Angebots: 2023-12-31 📅
Öffentlicher Auftraggeber Identität
Name des öffentlichen Auftraggebers: EnBW Baltic 2 GmbH & Co. KG
Land: Biberach
🏙️
Name des öffentlichen Auftraggebers: EnBW Hohe See GmbH & Co. KG
Kontakt
Kontaktperson: Dorothee Barth / EnBW Versicherungsvermittlung GmbH
Dokumente URL: https://www.subreport.de/E51341422🌏