2024-06-24   FAIR SIS100 auxiliary ultra-high vacuum chambers and components (FAIR - Facility for Antiproton and Ion Research in Europe GmbH)
For the heavy-ion superconducting synchrotron SIS100, the main accelerator of the future particle accelerator complex FAIR, currently under construction at Darmstadt, Germany, a multitude of various ultra-high vacuum chambers and components are being designed and have to be procured. In the straight sections of sector 2 and sector 3 of SIS100, straight ultra-high vacuum tubes, corresponding adapter flanges as well as corrugated bellows are positioned between already procured accelerator components. All … Ansicht der Beschaffung »
2021-03-09   Rahmenvertragsschließung über die Belieferung von Flanschadapter und Rohrkupplungen (Hamburger Wasserwerke GmbH)
Europaweite Ausschreibung als offenes Verfahren zum Zwecke einer Rahmenvertragsschließung über die Belieferung von Flanschadapter und Rohrkupplungen. Ansicht der Beschaffung »