The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the Island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2.7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW. N1 wants to enter into a contract for services and works for the exchange of major components on 47 WTGs, starting from 1 March 2022 until the last MCR is completed. The main tasks of the scope will be the replacement of major components (i.e. rotor shaft-bearings of the WTGs), documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the WTGs running safe and sustainable, full logistics (including e.g. provision of heavy lift vessels) and base infrastructure.
Deadline
Die Frist für den Eingang der Angebote war 2021-07-05.
Die Ausschreibung wurde veröffentlicht am 2021-06-18.
Auftragsbekanntmachung (2021-06-18) Objekt Umfang der Beschaffung
Titel: Bauinstallationsarbeiten
Referenznummer: MCR 2022/2023
Kurze Beschreibung:
The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the Island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2.7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW.
N1 wants to enter into a contract for services and works for the exchange of major components on 47 WTGs, starting from 1 March 2022 until the last MCR is completed. The main tasks of the scope will be the replacement of major components (i.e. rotor shaft-bearings of the WTGs), documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the WTGs running safe and sustainable, full logistics (including e.g. provision of heavy lift vessels) and base infrastructure.
The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the Island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2.7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW.
N1 wants to enter into a contract for services and works for the exchange of major components on 47 WTGs, starting from 1 March 2022 until the last MCR is completed. The main tasks of the scope will be the replacement of major components (i.e. rotor shaft-bearings of the WTGs), documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the WTGs running safe and sustainable, full logistics (including e.g. provision of heavy lift vessels) and base infrastructure.
Metadaten der Bekanntmachung
Originalsprache: Englisch 🗣️
Dokumenttyp: Auftragsbekanntmachung
Art des Auftrags: Bauleistung
Verordnung: Europäische Union
Gemeinsames Vokabular für öffentliche Aufträge (CPV)
Code: Bauinstallationsarbeiten📦
Zusätzlicher CPV-Code: Reparatur und Wartung von Generatoren📦 Ort der Leistung
NUTS-Region: Stormarn
🏙️
Verfahren
Verfahrensart: Verhandlungsverfahren
Angebotsart: Angebot für alle Lose
Vergabekriterien
Wirtschaftlichstes Angebot
The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the Island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2.7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW.
The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the Island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2.7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW.
N1 wants to enter into a contract for services and works for the exchange of major components on 47 WTGs, starting from 1 March 2022 until the last MCR is completed. The main tasks of the scope will be the replacement of major components (i.e. rotor shaft-bearings of the WTGs), documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the WTGs running safe and sustainable, full logistics (including e.g. provision of heavy lift vessels) and base infrastructure.
N1 wants to enter into a contract for services and works for the exchange of major components on 47 WTGs, starting from 1 March 2022 until the last MCR is completed. The main tasks of the scope will be the replacement of major components (i.e. rotor shaft-bearings of the WTGs), documentation and reporting of the tasks and the WTGs and all tasks which are necessary to keep the WTGs running safe and sustainable, full logistics (including e.g. provision of heavy lift vessels) and base infrastructure.
See Call for Competition (CfC) for further detail.
Bezeichnung des von der EU finanzierten Projekts oder Programms: NER 300.
Ort der Leistung
Hauptstandort oder Erfüllungsort: Offshore Wind Farm Nordsee One.
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Befähigung zur Berufsausübung:
Extract from the commercial register (or comparable document) if registration in such a register is required by law according to the candidate's or the members of the consortium's country of origin.
Wirtschaftliche und finanzielle Leistungsfähigkeit:
Description of the candidate's or the members' of the consortium's legal structure and liability.
Candidate's or members' of the consortium turnover during the last 3 financial years.
Annual financial statement, financial reports or balance sheet of the last 3 financial years.
Description of the possibility to provide parental company guarantees and/bank guarantees during the bidding phase or comparable collateral.
Proof of sufficient insurance at set out in Para 15.2 of the Agreement (third party liability insurance - EUR 10 m by occurrence, hull and machinery insurance, P&I or marine liability insurance - EUR 25 m by event, Marine cargo and goods in transit insurance) or declaration that the candidate will arrange and maintain such insurance if being awarded with the contract.
Wirtschaftliche und finanzielle Leistungsfähigkeit
Proof of sufficient insurance at set out in Para 15.2 of the Agreement (third party liability insurance - EUR 10 m by occurrence, hull and machinery insurance, P&I or marine liability insurance - EUR 25 m by event, Marine cargo and goods in transit insurance) or declaration that the candidate will arrange and maintain such insurance if being awarded with the contract.
Technische und berufliche Fähigkeiten:
Company presentation (qualified personnel, relevant technical equipment etc.).
Presentation of references for comparable services.
HSE statistics for the last 3 years including LTI (Lost Time Injuries, in relation to the total number of hours worked).
Information on the Management Systems for QHSE, together with proof for the relevant certification. If no certification might be available, the candidate shall provide a presentation and / or general information on the status of the management systems and (if planned) a milestone schedule for the certification process.
Information on the Management Systems for QHSE, together with proof for the relevant certification. If no certification might be available, the candidate shall provide a presentation and / or general information on the status of the management systems and (if planned) a milestone schedule for the certification process.
Presentation, that the provided jack-up vessel is technically suitable for the respective works (deck space, suitable jacking conditions (Hmax/hs), dynamic positioning, sufficient main crane capacities, suitable leg length/spud cans suitable for the side).
Presentation, that the provided jack-up vessel is technically suitable for the respective works (deck space, suitable jacking conditions (Hmax/hs), dynamic positioning, sufficient main crane capacities, suitable leg length/spud cans suitable for the side).
Liste und kurze Beschreibung der Regeln und Kriterien: See CfC for further detail.
Auftragsausführung
Geforderte Kautionen und Garantien: See CfC for further detail.
Wichtigste Finanzierungsbedingungen und Zahlungsmodalitäten und/oder Verweis auf die einschlägigen Bestimmungen, die sie regeln: See CfC for further detail.
Rechtsform der Gruppe von Wirtschaftsteilnehmern, an die der Auftrag vergeben werden soll: See CfC for further detail.
Bedingungen für die Vertragserfüllung: See CfC for further detail.
Verfahren
Rechtsgrundlage: 32014L0025
Zeitpunkt des Eingangs der Angebote: 11:00
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Deutsch 🗣️
Englisch 🗣️
Gültigkeitsdauer des Angebots: 2 Monate
Ergänzende Informationen Körper überprüfen
Name: See para 5 CfC
Postort: See para 5 CfC
Land: Deutschland 🇩🇪
Quelle: OJS 2021/S 119-316070 (2021-06-18)