81320174 - International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria - Lot 1

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilization of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. Off-grid progress, particularly in mini-grids, is hindered by barriers such as limited forex access and technical capacity. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component. 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. New or improved laws, regulations or instruments to achieve the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy) 2. Support 5 states on their respective State Electricity Market through the development of policies, laws, or instruments to advance RE investment. The procedure is divided into two lots. This is Lot 1.

Deadline

Die Frist für den Eingang der Angebote war 2026-03-10. Die Ausschreibung wurde veröffentlicht am 2026-02-06.

Wer? Wie? Wo?
Geschichte der Beschaffung
Datum Dokument
2026-02-06 Auftragsbekanntmachung
2026-02-26 Auftragsbekanntmachung
Auftragsbekanntmachung (2026-02-06)
Objekt
Umfang der Beschaffung
Titel: 81320174 - International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria - Lot 1
Referenznummer: 81320174_1
Kurze Beschreibung:
NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilization of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. Off-grid progress, particularly in mini-grids, is hindered by barriers such as limited forex access and technical capacity. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component. 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. New or improved laws, regulations or instruments to achieve the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy) 2. Support 5 states on their respective State Electricity Market through the development of policies, laws, or instruments to advance RE investment. The procedure is divided into two lots. This is Lot 1.
Mehr anzeigen
Art des Vertrags: Dienstleistungen
Produkte/Dienstleistungen: Allgemeine und berufliche Bildung 📦
Beschreibung
Interne Kennung: 81320174_1
Diese Auftragsvergabe ist auch für kleine und mittlere Unternehmen (KMU) geeignet
Beschreibung der Beschaffung:
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.
Mehr anzeigen
Zusätzliche Informationen: #Besonders auch geeignet für:other-sme#
Art des Vertrags: Dienstleistungen
Produkte/Dienstleistungen: Allgemeine und berufliche Bildung 📦
Ziel der strategischen Auftragsvergabe: Verringerung der Auswirkungen auf die Umwelt
See tender documents
Konzept zur Verringerung der Umweltauswirkungen: Klimaschutz
Gefördertes soziales Ziel: Gleichstellung der Geschlechter
Land: Nigeria 🇳🇬
Dauer: 19 Monate
Maximale Verlängerungen: 2
Weitere Informationen zur Verlängerung:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Informationen über Optionen
Optionen
Beschreibung der Optionen:
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Vergabekriterien
Preis
Preis (Gewichtung): 30.00
Qualitätskriterium (Bezeichnung): Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.)
Qualitätskriterium (Gewichtung): 70.0000
500.00000000
Titel
Los-Identifikationsnummer: LOT-0001
Beschreibung
Hauptstandort oder Erfüllungsort: -

Verfahren
Art des Verfahrens
Offenes Verfahren
Rechtsgrundlage: Richtlinie 2014/24/EU
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2026-03-10 12:00:00 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 80 Tage
Bedingungen für die Einreichung eines Angebots
Die Bieter können mehrere Angebote einreichen
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Elektronische Rechnungsstellung: Erforderlich
Die elektronische Bestellung wird verwendet
Elektronische Zahlung wird verwendet
Frist für die Anforderung zusätzlicher Informationen: 2026-03-02 23:59:59 📅
Zusätzliche Informationen:
GIZ asks the applicant or bidder to submit, complete or correct documents, within the framework laid down by law.
Vergabekriterien
Gewichtungsart: Gewichtung (Punkte, genau)
Bedingungen für die Einreichung eines Angebots
Der Vertrag enthält Bedingungen zur Vertragsausführung

Rechtliche, wirtschaftliche, finanzielle und technische Informationen
Bedingungen für die Teilnahme
Eignungskriterium: Andere wirtschaftliche oder finanzielle Anforderungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-A1: Principles for the execution of orders (Mit dem Angebot; Mittels Eigenerklärung): The eligibility criteria are not from the same category as stipulated above, as there is no suitable category. 1. Self-declaration: name of company and address, tax ID, registration and commercial register number or equivalent register in accordance with the legal provisions of the country of origin. 2. No grounds for exclusion pursuant to § 123, § 124 GWB, § 22 LkSG, EU-Russia sanctions 3. Declaration of bidding consortium and/or declaration of subcontractors (if applicable)
Mehr anzeigen
Eignungskriterium: Referenzen zu bestimmten Dienstleistungen
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-B1: Technical and professional ability (Mit dem Angebot; Mittels Eigenerklärung): 1.The technical assessment is only based on reference projects with a minimum commission value of: 250.000 EUR (net). 2. At least 3 references projects in the last 36 months (reference date: date of publication of this tender) in the technical field cumulatively in the power sector, renewable energy and mini grids projects that had a minimum commission value of EUR 250,000.00 (net) (exclusion criterion) and at least 2 reference projects in sub-Saharan Africa in the technical field mentioned above in the last 36 months (reference date: date of publication of this tender) that had a minimum commission value of EUR 250,000.00 (net) (exclusion criterion).
Mehr anzeigen
Eignungskriterium: Durchschnittlicher Jahresumsatz
Liste und kurze Beschreibung der Regeln und Kriterien:
EN-C1: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average annual turnover for the last three years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: 900.000,00 EUR (net).
Mehr anzeigen
EN-C2: Economic and financial standing (Mit dem Angebot; Mittels Eigenerklärung): Average number of employees and managers in the last three calendar years, at least 10 persons.
Bedingungen für den Vertrag
Bedingungen für die Vertragserfüllung:
The execution conditions result from the information given in the contract notice and the tender documents.
Bedingungen für die Teilnahme
Ausschlussgrund: Verstoß gegen die in den rein innerstaatlichen Ausschlussgründen verankerten Verpflichtungen
Beschreibung der Ausschlussgründe: In accordance with §§ 123,124 GWB, § 22 LkSG

Öffentlicher Auftraggeber
Name und Adressen
Name: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Nationale Registrierungsnummer: 993-80072-52
Postanschrift: Dag-Hammarskjöld-Weg 1 - 5
Postleitzahl: 65760
Postort: Eschborn
Region: Main-Taunus-Kreis 🏙️
Land: Deutschland 🇩🇪
E-Mail: lisa-marie.friebel@twobirds.com 📧
Telefon: +49 89 3581 6000 📞
URL: https://www.giz.de 🌏
Art des öffentlichen Auftraggebers
Einrichtung des öffentlichen Rechts
Haupttätigkeit
Allgemeine öffentliche Verwaltung
Kommunikation
Dokumente URL: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTXRR0GRZ/documents 🌏
Teilnahme-URL: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTXRR0GRZ 🌏
URL des Beschaffungsinstruments: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTXRR0GRZ 🌏
Elektronische Einreichung: Erforderlich

Ergänzende Informationen
Zusätzliche Informationen
#Bekanntmachungs-ID: CXTRYY6YTXRR0GRZ# All communication takes place in English via communication tool in the project area of the procurement portal.
Körper überprüfen
Name: Vergabekammern des Bundes
Nationale Registrierungsnummer: 022894990
Postanschrift: Kaiser-Friedrich-Straße 16
Postleitzahl: 53113
Postort: Bonn
Region: Bonn, Kreisfreie Stadt 🏙️
Land: Deutschland 🇩🇪
E-Mail: vk@bundeskartellamt.bund.de 📧
Telefon: +49 2289499-0 📞
Fax: +49 2289499-163 📠
URL: https://www.bundeskartellamt.de 🌏
Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as 1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected, 2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice. 3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids, 4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint. Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected. Textvorlage erstellen/auswählen/bearbeiten
Mehr anzeigen
Informationen über elektronische Arbeitsabläufe
Die elektronische Rechnungsstellung wird akzeptiert
Die elektronische Bestellung wird verwendet
Elektronische Zahlung wird verwendet
Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2026-02-06+01:00 📅
Quelle: OJS 2026/S 027-093057 (2026-02-06)
Auftragsbekanntmachung (2026-02-26)
Verfahren
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2026-03-17 12:00:00 📅
Mindestzeitraum, in dem der Bieter das Angebot aufrechterhalten muss: 73 Tage

Ergänzende Informationen
Bekanntmachungsangaben
Bevorzugtes Datum der Veröffentlichung: 2026-02-26+01:00 📅

Änderungen
Zu berichtigender Text in der ursprünglichen Bekanntmachung
Nummer des Abschnitts: PROCEDURE
Neuer Wert
Text: Extension of Deadline for submitting bids
Zu berichtigender Text in der ursprünglichen Bekanntmachung
Änderung der Auftragsunterlagen am
Datum der Änderung der Auftragsunterlagen: 2026-02-26 📅
Andere zusätzliche Informationen
Extension of Deadline
Hauptgrund für die Änderung: Aktualisierte Informationen
Angaben zu Änderungen
Fassung der zu ändernden vorigen Bekanntmachung: 6d93cbac-b809-41db-b578-dee316fc3289-01
Quelle: OJS 2026/S 041-140003 (2026-02-26)