2016-01-15   Conclusion of a contract on the production, installation, and turnkey installation of the inner park cabling within... (Trianel Windkraftwerk Borkum II GmbH & Co. KG)
The contract concerns the production, installation and turnkey installation of the inner park cabling within the wind farm (between wind turbine locations and to the offshore substation) to connect a minimum of 25 and a maximum of 34 of the offshore wind park's wind turbine generators of TWB II. Ansicht der Beschaffung »
Erwähnte Lieferanten: Siem Offshore Contractors GmbH