Qualification, Manufacturing, Integration, Verification and Test the NEXT On-board Processing Unit for Accommodation on the Geo-stationary Heinrich-Hertz Satellite

Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR)

Work Description
Background
Main objective of the NEXT-OBP-GEOSat project is the development of an on-board processing unit for conducting scientific in-orbit communication experiments. Within the predecessor project 'Network Coding Satellite Experiment (NEXT)' a laboratory demonstration system was developed in hardware and software. The project team consists of the DLR Institute of Communications and Navigation (DLR-KN) in Oberpfaffenhofen and IQ wireless GmbH in Berlin. The former is responsible for experiment software development works and project coordination, the latter is in charge of designing the on-board processing flight hardware.
Platform will be the geostationary Heinrich-Hertz satellite system (H2Sat) and the works are financed by the Federal Ministry of Economics and Technology (supervised by DLR Raumfahrtmanagement - DLR Space Administration).
The preliminary design of the housing is depicted in Figure 1. This figure will be shown to you in a next phase. The overall mass will be maximal 5kg; power consumption will be maximal 25W. Apart from the power supply there will be a qualified RF-interface (Rx/Tx) only. The inner signal processing electronics will be based on COTS components with a design lifetime of three years. A MILBUS (or other satellite bus) interface is not foreseen, but all other satellite interfaces (thermal, power, mechanical, RF) are subject to compliance with the requirements specified by DLR Raumfahrtmanagment and satellite manufacturers.
Further reading (examples):
Hermann Bischl, Hartmut Brandt, Francesco Rossetto, 'An experimental demonstration of Network Coding for satellite networks'. CEAS Space Journal, December 2011, Volume 2, Issue 1-4, pp 75-83. DOI 10.1007/s12567-011-0009-7
Andreas Weiland, 'Network coding satellite experiment - NEXT : Schlussbericht zum Verbundprojekt'. Revision: 1.0. - Berlin : IQ wireless GmbH, 2012. In German. http://edok01.tib.uni-hannover.de/edoks/e01fb13/747601976.pdf
Hermann Bischl,'“Schlussbericht zu NEXT - Network coding satellite experiment'. Version 1, Weßling, 2012. In German. http://edok01.tib.uni-hannover.de/edoks/e01fb13/745995624.pdf
Tasks
Consulting design and development works (mainly in cooperation with IQ wireless GmbH)
Product assurance responsibility for all satellite interfaces (electrical, mechanical, thermal, EMC etc.)
Assembly, integration and test:
— Interface-relevant components will be purchased as space-qualified components
— Experimental electronics will be provided by IQ wireless GmbH
— Environmental testing
— Functional test support to IQ wireless GmbH
General Requirements and Notes
Note: In case of conflicts between the requirements listed hereafter and requirements defined in applicable documents then the description in the applicable documents shall be applied.
The tenderer must join an existing non-disclosure agreement (NDA) with the involved parties OHB System AG, Tesat-Spacecom GmbH & Co. KG, AUDENS Telecommunications Consulting GmbH, DLR-KN, IQ wireless GmbH, and Astro- und Feinwerktechnik Adlershof GmbH i a next phase.
The tenderer must follow the product assurance/management/engineering requirements defined in the applicable documents and must declare his compliance to all project requirements (PA & Safety, IRD, GERD etc.) and verification methods with a signed statement. This is subject to the aforementioned NDA.
The works will have to be conducted in close cooperation with IQ wireless GmbH including regular status meetings (physical and telephone). The tenderer must provide support to IQ wireless/DLR-KN in all questions related to space qualification procedures.
Inspections and audits requested by the project partners DLR-KN/IQ wireless and by the sponsor DLR Raumfahrtmanagement must be possible at any time.
Parts and components to be integrated will be ordered by DLR-KN and/or by IQ wireless (Incoterms DAP or CIP). Delivery address must be defined by the selected tenderer. The tenderer must comply with possible ITAR regulations and has to provide a list of all potential intermediate consignees (freight forwarders, assembly houses, test facilities, integrators etc.). The tenderer is responsible for inspection and documentation based on an incoming inspection procedure.
Applicable Standards and Documents
ECSS standards and the following applicable documents are mandatory for conducting the work:
Available on request (restricted):
Deutsches Zentrum für Luft- und Raumfahrt (DLR). Product - Assurance and Safety - Requirements For Payload Accomodation using Heinrich Hertz Satellite. Doc.No. H2S-RD-QP-DLR-1086/D, 24.09.2010
Deutsches Zentrum für Luft- und Raumfahrt (DLR). Compliance Matrix (CM) Product - Assurance and Safety - Requirements For Payload Accomodation using Heinrich Hertz Satellite. Doc.No. H2S-RD-QP-DLR-1086/D, 24.09.2010
Deutsches Zentrum für Luft- und Raumfahrt (DLR). H2Sat – Technologiebeistellungen. Anzuwendende Management Anforderungen Phase B/C/D. Doc.No. H2Sat-DLR_RD-RS-020, Issue 1, November 2011
Deutsches Zentrum für Luft- und Raumfahrt (DLR). Heinrich-Hertz-Mission – Technologiebeistellungen. Anzuwendende Engineering Standards Phase B/C/D. Doc.No. H2Sat-DLR_RD-RS-021, Issue 1, August 2011
Deutsches Zentrum für Luft- und Raumfahrt (DLR). Document Requirement Definition (DRD) For Payload Accomodation using Heinrich Hertz Satellite. Doc.No. H2S-RD-QP-DLR-1086/D-DRD, 24.9.2010
Subject to a non-disclosure agreement with DLR-Institute of Communications and Navigation, Oberpfaffenhofen and IQ wireless GmbH, Berlin:
NEXT-OBP Product Assurance Plan (PAP), Document No.: H2SAT-WTPL-NEXT-PAP-0000. In preparation (expected for 30.9.2013).
NEXT-OBP Assembly, Integration, Verification & Test Plan (AIVT), Document No.: H2SAT-WTPL-NEXT-AIVT-0000. In preparation (expected for 30.9.2013).
Subject to a non-disclosure agreement with OHB System AG, Bremen, Germany and Tesat-Spacecom GmbH & Co. KG, Backnang, Germany:
OHB. General Equipment Requirements Document (GERD) for the Small GEO Satellite. Doc.No. TC-OHB-RQ-0001, Issue 02, 27.9.2011
OHB. Product Assurance and Safety Requirements for Subcontractors and Suppliers for the German Satellite Communication Mission. Doc. No. H2SAT-SYS-OHB-RQ-0004, Issue 04, 9.4.2013
OHB. Configuration Control and Documentation Management Requirements for Subcontractor and Supplier for the German Satellite Communication Mission. Doc.No. H2SAT-SYS-OHB-RQ-0001, Issue 02, 15.10.2012
OHB. Heinrich Hertz Consolidated DDL for IOV Suppliers. Doc.No. H2SAT-SYS-OHB-LI-0004, Issue 01, 26.10.2012.
OHB. Double Isolation Requirements Specification for the Small GEO Satellite. Doc.No. TC-SYS-OHB-RQ-0002, Issue 1, 21.12.2012
Tesat. Interface Requirements Document (IRD) for NextOBP. Doc.No. H2S-IOV-NEXTOBP-TE-IRD-0146_B_IRD, Issue B, 2013-06-27.

Deadline
Die Frist für den Eingang der Angebote war 2013-11-11. Die Ausschreibung wurde veröffentlicht am 2013-10-04.