81271123-Developing Accelerated PV Grid Integration Strategy for State of Gujarat

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

India's sustained growth, which is projected to be around 7 per cent per annum over the next few years, poses enormous challenges with regards to energy and climate policy. With emissions of 2.3 billion tones (t) of CO2 per year (2014), electricity generation accounts for the bulk of the emissions equalling to around 30 per cent of the total. There is an urgency to improve the climate balance while meeting the increased energy demand and providing access to electricity to India's population.
In order to curb the climate imbalance and provide uninterrupted power supply to all; the Government of India has increased the renewable energy generation target to 175 gigawatts (GW) by 2022, of which 40 GW will be generated by decentralised rooftop photovoltaic (PV) systems. The annual rate of expansion is not sufficient to achieve the target set for 2022. Despite policy and regulatory support from central and state governments, many challenges exist that affect the uptake of solar rooftop development on a large scale. Some of these are: lack of awareness among consumers, absence of innovative and attractive business and incapability of power distribution companies to promote rooftop solar PV and accommodate the business environment. Thus, the current annual rate of growth is not sufficient to achieve the target envisaged for 2022 by the Government.
The project is developing market forces while introducing enabling mechanisms and facilitating investments in rooftop PV systems. The core focus of the project is to develop the market through competition and to work systematically in selected project areas in association with the four core actors namely:
1) State Nodal Agencies (SNAs);
2) Distribution Licensees (DISCOMs);
3) Municipal Corporations, licensing authorities and local enterprises in selected municipal areas (e.g. in the smart cities of Bhubaneshwar, Coimbatore, and Kochi, or in other cities); and
4) Market participants (project developer, investors, etc.).
In the multipronged approach, the project is working on the market forces to accelerate the expansion of rooftop PV systems while designing enabling mechanisms and thus facilitating investments in rooftop PV systems. The project operates in five different activities, to achieve the objective:
1) Ensuring a long-term commitment on the part of DISCOMs;
2) Creating conducive local (municipal) conditions;
3) Promoting and implementing successful business models;
4) Disseminating information and upscaling;
5) Capacity Building.
The Indo-German Solar energy Partnership (IGSEP) project is commissioned by the German Government under its German Climate Technology Initiative (DKTI) is being implemented by GIZ in cooperation with the Ministry of New and Renewable Energy (MNRE), the Government of India, to facilitate and expedite the rooftop sector development in India.

Deadline

Die Frist für den Eingang der Angebote war 2021-07-05. Die Ausschreibung wurde veröffentlicht am 2021-06-02.

Anbieter

Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:

Wer? Wie? Wo?
Geschichte der Beschaffung
Datum Dokument
2021-06-02 Auftragsbekanntmachung
2021-10-05 Bekanntmachung über vergebene Aufträge
Auftragsbekanntmachung (2021-06-02)
Objekt
Umfang der Beschaffung
Titel: Forschungs- und Entwicklungsdienste und zugehörige Beratung
Referenznummer: 81271123
Kurze Beschreibung:
India's sustained growth, which is projected to be around 7 per cent per annum over the next few years, poses enormous challenges with regards to energy and climate policy. With emissions of 2.3 billion tones (t) of CO2 per year (2014), electricity generation accounts for the bulk of the emissions equalling to around 30 per cent of the total. There is an urgency to improve the climate balance while meeting the increased energy demand and providing access to electricity to India's population. In order to curb the climate imbalance and provide uninterrupted power supply to all; the Government of India has increased the renewable energy generation target to 175 gigawatts (GW) by 2022, of which 40 GW will be generated by decentralised rooftop photovoltaic (PV) systems. The annual rate of expansion is not sufficient to achieve the target set for 2022. Despite policy and regulatory support from central and state governments, many challenges exist that affect the uptake of solar rooftop development on a large scale. Some of these are: lack of awareness among consumers, absence of innovative and attractive business and incapability of power distribution companies to promote rooftop solar PV and accommodate the business environment. Thus, the current annual rate of growth is not sufficient to achieve the target envisaged for 2022 by the Government. The project is developing market forces while introducing enabling mechanisms and facilitating investments in rooftop PV systems. The core focus of the project is to develop the market through competition and to work systematically in selected project areas in association with the four core actors namely: 1) State Nodal Agencies (SNAs); 2) Distribution Licensees (DISCOMs); 3) Municipal Corporations, licensing authorities and local enterprises in selected municipal areas (e.g. in the smart cities of Bhubaneshwar, Coimbatore, and Kochi, or in other cities); and 4) Market participants (project developer, investors, etc.). In the multipronged approach, the project is working on the market forces to accelerate the expansion of rooftop PV systems while designing enabling mechanisms and thus facilitating investments in rooftop PV systems. The project operates in five different activities, to achieve the objective: 1) Ensuring a long-term commitment on the part of DISCOMs; 2) Creating conducive local (municipal) conditions; 3) Promoting and implementing successful business models; 4) Disseminating information and upscaling; 5) Capacity Building. The Indo-German Solar energy Partnership (IGSEP) project is commissioned by the German Government under its German Climate Technology Initiative (DKTI) is being implemented by GIZ in cooperation with the Ministry of New and Renewable Energy (MNRE), the Government of India, to facilitate and expedite the rooftop sector development in India.
Mehr anzeigen
Metadaten der Bekanntmachung
Originalsprache: Englisch 🗣️
Dokumenttyp: Auftragsbekanntmachung
Art des Auftrags: Dienstleistungen
Verordnung: Europäische Union, mit GPA-Beteiligung
Gemeinsames Vokabular für öffentliche Aufträge (CPV)
Code: Forschungs- und Entwicklungsdienste und zugehörige Beratung 📦
Zusätzlicher CPV-Code: Stromversorgungsunternehmen und zugehörige Dienste 📦
Ort der Leistung
NUTS-Region: in 🏙️

Verfahren
Verfahrensart: Offenes Verfahren
Angebotsart: Angebot für alle Lose
Vergabekriterien
Wirtschaftlichstes Angebot

Öffentlicher Auftraggeber
Identität
Land: Deutschland 🇩🇪
Art des öffentlichen Auftraggebers: Sonstiges
Name des öffentlichen Auftraggebers: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Postanschrift: Dag-Hammarskjöld-Weg 1 - 5
Postleitzahl: 65760
Postort: Eschborn
Kontakt
Internetadresse: https://www.giz.de 🌏
E-Mail: giz@imtb.de 📧
Telefon: +49 619679 📞
Fax: +49 61967980 📠
URL der Dokumente: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YLFZ/documents 🌏
URL der Teilnahme: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YLFZ 🌏

Referenz
Daten
Absendedatum: 2021-06-02 📅
Einreichungsfrist: 2021-07-05 📅
Veröffentlichungsdatum: 2021-06-07 📅
Kennungen
Bekanntmachungsnummer: 2021/S 108-285078
ABl. S-Ausgabe: 108
Zusätzliche Informationen
Communication/questions can only be submitted using GIZ's eProcurement Tender Platform for the award of contracts. Notice-ID: CXTRYY6YLFZ

Objekt
Umfang der Beschaffung
Kurze Beschreibung:
India's sustained growth, which is projected to be around 7 per cent per annum over the next few years, poses enormous challenges with regards to energy and climate policy. With emissions of 2.3 billion tones (t) of CO2 per year (2014), electricity generation accounts for the bulk of the emissions equalling to around 30 per cent of the total. There is an urgency to improve the climate balance while meeting the increased energy demand and providing access to electricity to India's population.
Mehr anzeigen
In order to curb the climate imbalance and provide uninterrupted power supply to all; the Government of India has increased the renewable energy generation target to 175 gigawatts (GW) by 2022, of which 40 GW will be generated by decentralised rooftop photovoltaic (PV) systems. The annual rate of expansion is not sufficient to achieve the target set for 2022. Despite policy and regulatory support from central and state governments, many challenges exist that affect the uptake of solar rooftop development on a large scale. Some of these are: lack of awareness among consumers, absence of innovative and attractive business and incapability of power distribution companies to promote rooftop solar PV and accommodate the business environment. Thus, the current annual rate of growth is not sufficient to achieve the target envisaged for 2022 by the Government.
Mehr anzeigen
The project is developing market forces while introducing enabling mechanisms and facilitating investments in rooftop PV systems. The core focus of the project is to develop the market through competition and to work systematically in selected project areas in association with the four core actors namely:
Mehr anzeigen
1) State Nodal Agencies (SNAs);
2) Distribution Licensees (DISCOMs);
3) Municipal Corporations, licensing authorities and local enterprises in selected municipal areas (e.g. in the smart cities of Bhubaneshwar, Coimbatore, and Kochi, or in other cities); and
4) Market participants (project developer, investors, etc.).
In the multipronged approach, the project is working on the market forces to accelerate the expansion of rooftop PV systems while designing enabling mechanisms and thus facilitating investments in rooftop PV systems. The project operates in five different activities, to achieve the objective:
Mehr anzeigen
1) Ensuring a long-term commitment on the part of DISCOMs;
2) Creating conducive local (municipal) conditions;
3) Promoting and implementing successful business models;
4) Disseminating information and upscaling;
5) Capacity Building.
The Indo-German Solar energy Partnership (IGSEP) project is commissioned by the German Government under its German Climate Technology Initiative (DKTI) is being implemented by GIZ in cooperation with the Ministry of New and Renewable Energy (MNRE), the Government of India, to facilitate and expedite the rooftop sector development in India.
Mehr anzeigen
The government of India is aiming for an exponential increase in the installation of Renewable Energy (RE) systems in the country including 100 GW capacity of solar power by 2022. Out of this 100 GW, 40 GW shall be capacitated by rooftop photovoltaic (PV) systems and primarily connected to the electricity distribution network (33 kV and below).
Mehr anzeigen
The increasing share of RE systems in the distribution grid leads to challenges for the distribution companies (Discoms). Particularly with the stringent grid codes that apply in India to operate the grid safely, it becomes even more challenging for the Discoms to handle the increasing shares of RE in the distribution systems.
Mehr anzeigen
Under I-RE (Integration of renewable energies in India) project, we had conducted a study ‘Analysis of Indian Electricity Distribution Systems for the Integration of High shares of rooftop PV.’ The objective of this study was to provide an overview of the characteristics of the Indian power system and its problems with regards to a large-scale rooftop PV rollout as well as to develop a template for Discoms on how to deal with rising PV shares, which studies to conduct and which technology options to select.
Mehr anzeigen
The State of Gujarat has four State Owned Discoms under the leadership of GUVNL which is nodal agency for implementation of solar rooftop scheme Surya Gujarat in State. The State also has 2 private Discoms operating in the city of Ahmedabad and Surat.
Mehr anzeigen
The State of Gujarat through it's Surya Gujarat Scheme is heavily promoting the adoption of Distributed solar rooftop PV systems in the residential category. Gujarat Urja Vikas Nigam Limited (GUVNL) is the nodal agency responsible for implementation of this scheme. The State has a target of 3 GW of distributed solar PV by the end of 2022 with current installed capacity close to 900 MWp. The State has set relaxed regulations and allowed penetration of solar rooftop PV systems up to 100 % capacity of the distribution transformers. With this massive adoption of solar rooftop PV systems and relaxed regulations, the distributed companies are challenged with maintaining the distribution grid while ensuring the safe and reliable supply of electricity. Under this project, we intend to develop an Accelerated PV Grid Integration Strategy for the State of Gujarat. There are following technical questions faced by Discoms:
Mehr anzeigen
1) Are penetration levels up to 100 % RE of Distribution Transformer (DT) capacity technically possible? What is the hosting capacity of the distribution grid?
2) How can the quality of supply be ensured with penetration levels up to 100 % RE with regards to e.g. overvoltage issues, harmonics, line tripping?
3) What are the impacts at the 11 kV and 66 kV level with the increased penetration of RE?
4) What is the best way to forecast solar generation and how to analyse and make use of this data to ensure grid stability?
The strategy shall verify the technical issues coming with a large penetration of distributed solar PV systems and provide technical and economic solutions to these challenges. With this tender under Indo-German Energy Programme — Indo-German Solar Energy Partnership (IGEN-IGSEP), this study will essentially be a case-by-case investigative analysis of the impacts of rooftop solar PV systems on distribution feeders. A representative sample of distribution feeders serving different types of areas in the licensee zone with different scenarios of loading patterns pertaining to various consumer categories is to be taken and modelled as part of the study. The detailed modelling of such feeders will be followed by power system simulation studies (supported by on-site measurements). The contractor shall develop an ‘Accelerated PV Grid Integration Strategy’ based on this detailed study.
Mehr anzeigen
Dauer: 16 Monate
Ort der Leistung
Hauptstandort oder Erfüllungsort: 00000 India.

Rechtliche, wirtschaftliche, finanzielle und technische Informationen
Bedingungen für die Teilnahme
Befähigung zur Berufsausübung:
1) Trading name and address, commercial register number.
2) Eligibility declaration that no grounds for exclusion in Section 123, 124 of the German Act against Restraints of Competition (GWB) apply.
3) Eligibility declaration subcontractors if applicable.
4) Association clause if applicable.
Wirtschaftliche und finanzielle Leistungsfähigkeit:
1) Average annual turnover for the last 3 years at least EUR 650 000.00.
2) Number of employees as at 31.12. of the previous year at least 20 persons.
Technische und berufliche Fähigkeiten:
1) At least 3 reference projects in the technical field ‘grid integration studies of large scale RE in India’ and at least 3 reference projects ‘outside of India (grid integration studies of large scale RE)’ in the last 3 years.
2) The technical assessment is only based on reference projects with a minimum commission value of EUR 100 000.00.

Verfahren
Rechtsgrundlage: 32014L0024
Zeitpunkt des Eingangs der Angebote: 12:00
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Gültigkeitsdauer des Angebots: 2021-09-30 📅
Datum der Angebotseröffnung: 2021-07-05 📅
Zeitpunkt der Angebotseröffnung: 12:00

Öffentlicher Auftraggeber
Identität
Andere Art des öffentlichen Auftraggebers: Legal person governed by private law (gemeinnützige GmbH) wholly owned by the Federal Republic of Germany
Kontakt
Dokumente URL: https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YLFZ/documents 🌏

Referenz
Zusätzliche Informationen
Communication/questions can only be submitted using GIZ's eProcurement Tender Platform for the award of contracts.
Notice-ID: CXTRYY6YLFZ

Ergänzende Informationen
Körper überprüfen
Name: Die Vergabekammern des Bundes
Postanschrift: Villemombler Straße 76
Postort: Bonn
Postleitzahl: 53123
Land: Deutschland 🇩🇪
Telefon: +49 2289499-0 📞
E-Mail: vk@bundeskartellamt.bund.de 📧
Fax: +49 2289499-163 📠
Internetadresse: https://www.bundeskartellamt.de 🌏
Informationen zu Fristen für Nachprüfungsverfahren:
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as:
1) The applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected;
Mehr anzeigen
2) Complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice;
Mehr anzeigen
3) Complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
Mehr anzeigen
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Quelle: OJS 2021/S 108-285078 (2021-06-02)
Bekanntmachung über vergebene Aufträge (2021-10-05)
Objekt
Umfang der Beschaffung
Kurze Beschreibung:
India"s sustained growth, which is projected to be around 7 per cent per annum over the next few years, poses enormous challenges with regards to energy and climate policy. With emissions of 2.3 billion tones (t) of CO2 per year (2014), electricity generation accounts for the bulk of the emissions equalling to around 30 per cent of the total. There is an urgency to improve the climate balance while meeting the increased energy demand and providing access to electricity to India"s population. In order to curb the climate imbalance and provide uninterrupted power supply to all; the Government of India has increased the renewable energy generation target to 175 gigawatts (GW) by 2022, of which 40 GW will be generated by decentralised rooftop photovoltaic (PV) systems. The annual rate of expansion is not sufficient to achieve the target set for 2022. Despite policy and regulatory support from central and state governments, many challenges exist that affect the uptake of solar rooftop development on a large scale. Some of these are: lack of awareness among consumers, absence of innovative and attractive business and incapability of power distribution companies to promote rooftop solar PV and accommodate the business environment. Thus, the current annual rate of growth is not sufficient to achieve the target envisaged for 2022 by the Government. The project is developing market forces while introducing enabling mechanisms and facilitating investments in rooftop PV systems. The core focus of the project is to develop the market through competition and to work systematically in selected project areas in association with the four core actors namely: 1. State Nodal Agencies (SNAs) 2. Distribution Licensees (DISCOMs) 3. Municipal Corporations, licensing authorities and local enterprises in selected municipal areas (e.g. in the smart cities of Bhubaneshwar, Coimbatore, and Kochi, or in other cities) and 4. Market participants (project developer, investors, etc.) In the multipronged approach, the project is working on the market forces to accelerate the expansion of rooftop PV systems while designing enabling mechanisms and thus facilitating investments in rooftop PV systems. The project operates in five different activities, to achieve the objective: 1. Ensuring a long-term commitment on the part of DISCOMs 2. Creating conducive local (municipal) conditions 3. Promoting and implementing successful business models 4. Disseminating information and upscaling 5. Capacity Building The Indo-German Solar energy Partnership (IGSEP) project is commissioned by the German Government under its German Climate Technology Initiative (DKTI) is being implemented by GIZ in cooperation with the Ministry of New and Renewable Energy (MNRE), the Government of India, to facilitate and expedite the rooftop sector development in India.
Mehr anzeigen
Gesamtwert des Auftrags: 634 190 EUR 💰
Metadaten der Bekanntmachung
Dokumenttyp: Bekanntmachung über vergebene Aufträge

Verfahren
Angebotsart: Entfällt

Referenz
Daten
Absendedatum: 2021-10-05 📅
Veröffentlichungsdatum: 2021-10-08 📅
Kennungen
Bekanntmachungsnummer: 2021/S 196-510937
Verweist auf Bekanntmachung: 2021/S 108-285078
ABl. S-Ausgabe: 196
Zusätzliche Informationen
Bekanntmachungs-ID: CXTRYY6YNLB

Objekt
Umfang der Beschaffung
Kurze Beschreibung:
India"s sustained growth, which is projected to be around 7 per cent per annum over the next few years, poses enormous challenges with regards to energy and climate policy. With emissions of 2.3 billion tones (t) of CO2 per year (2014), electricity generation accounts for the bulk of the emissions equalling to around 30 per cent of the total. There is an urgency to improve the climate balance while meeting the increased energy demand and providing access to electricity to India"s population.
Mehr anzeigen
1. State Nodal Agencies (SNAs)
2. Distribution Licensees (DISCOMs)
3. Municipal Corporations, licensing authorities and local enterprises in selected municipal areas (e.g. in the smart cities of Bhubaneshwar, Coimbatore, and Kochi, or in other cities) and
4. Market participants (project developer, investors, etc.)
1. Ensuring a long-term commitment on the part of DISCOMs
2. Creating conducive local (municipal) conditions
3. Promoting and implementing successful business models
4. Disseminating information and upscaling
5. Capacity Building
Under I-RE (Integration of renewable energies in India) project, we had conducted a study "Analysis of Indian Electricity Distribution Systems for the Integration of High shares of rooftop PV." The objective of this study was to provide an overview of the characteristics of the Indian power system and its problems with regards to a large-scale rooftop PV rollout as well as to develop a template for Discoms on how to deal with rising PV shares, which studies to conduct and which technology options to select.
Mehr anzeigen
The State of Gujarat through it"s Surya Gujarat Scheme is heavily promoting the adoption of Distributed solar rooftop PV systems in the residential category. Gujarat Urja Vikas Nigam Limited (GUVNL) is the nodal agency responsible for implementation of this scheme. The State has a target of 3GW of distributed solar PV by the end of 2022 with current installed capacity close to 900MWp. The State has set relaxed regulations and allowed penetration of solar rooftop PV systems up to 100% capacity of the distribution transformers. With this massive adoption of solar rooftop PV systems and relaxed regulations, the distributed companies are challenged with maintaining the distribution grid while ensuring the safe and reliable supply of electricity. Under this project, we intend to develop an Accelerated PV Grid Integration Strategy for the State of Gujarat. There are following technical questions faced by Discoms:
Mehr anzeigen
1. Are penetration levels up to 100% RE of Distribution Transformer (DT) capacity technically possible? What is the hosting capacity of the distribution grid?
2. How can the quality of supply be ensured with penetration levels up to 100% RE with regards to e.g. overvoltage issues, harmonics, line tripping?
3. What are the impacts at the 11kV and 66kV level with the increased penetration of RE?
4. What is the best way to forecast solar generation and how to analyse and make use of this data to ensure grid stability?
The strategy shall verify the technical issues coming with a large penetration of distributed solar PV systems and provide technical and economic solutions to these challenges. With this tender under Indo-German Energy Programme - Indo-German Solar Energy Partnership (IGEN-IGSEP), this study will essentially be a case-by-case investigative analysis of the impacts of rooftop solar PV systems on distribution feeders. A representative sample of distribution feeders serving different types of areas in the licensee zone with different scenarios of loading patterns pertaining to various consumer categories is to be taken and modelled as part of the study. The detailed modelling of such feeders will be followed by power system simulation studies (supported by on-site measurements). The contractor shall develop an "Accelerated PV Grid Integration Strategy" based on this detailed study.
Mehr anzeigen
Ort der Leistung
Hauptstandort oder Erfüllungsort: 00000 India

Verfahren
Vergabekriterien
Qualitätskriterium (Bezeichnung): Total number of points achieved according to technical assessment
Qualitätskriterium (Gewichtung): 70
Preis (Gewichtung): 30.00

Auftragsvergabe
Datum des Vertragsabschlusses: 2021-09-28 📅
Name: Energynautics GmbH
Postanschrift: Robert-Bosch-Straße 7
Postort: Darmstadt
Postleitzahl: 64293
Land: Deutschland 🇩🇪
Darmstadt 🏙️
Gesamtwert des Auftrags: 634 190 EUR 💰
Informationen über Ausschreibungen
Anzahl der eingegangenen Angebote: 4

Ergänzende Informationen
Körper überprüfen
Informationen zu Fristen für Nachprüfungsverfahren:
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
Mehr anzeigen
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice
Mehr anzeigen
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
Mehr anzeigen
Quelle: OJS 2021/S 196-510937 (2021-10-05)