The City Climate Finance Gap Fund (‘Gap Fund’) supports cities in low and middle income countries in their development and implementation of climate strategies and investment projects. It provides assistance in the early stages of project preparation, from understanding the context to executing plans: from capacity building to strategy development; from collection of technical data to convening stakeholders; from support on investment prioritisation to the early stages of project preparation. By supporting cities in both upstream (supporting strategy development and prioritisation of interventions) and downstream (project identification and pre-feasibility) work, the Gap Fund helps reach the climate impact required for achieving global goals to limit temperature increase to 1.5 degrees above pre-industrial levels.
The Gap Fund is a partnership among donors: the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Ministry of Economic Cooperation and Development (BMZ) and Luxembourg's Ministry of the Environment, Climate and Sustainable Development. Implementors are the European Investment Bank (EIB) in partnership with the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ), and the World Bank (WB).
Deadline
Die Frist für den Eingang der Angebote war 2021-07-27.
Die Ausschreibung wurde veröffentlicht am 2021-06-25.
Anbieter
Die folgenden Lieferanten werden in Vergabeentscheidungen oder anderen Beschaffungsunterlagen erwähnt:
Objekt Umfang der Beschaffung
Titel:
“81271994-Support for Project Preparation for Urban Progress (SuPPUrbP) — City Climate Finance Gap Fund
81271994”
Produkte/Dienstleistungen: Dienstleistungen für Unternehmen: Recht, Marketing, Consulting, Einstellungen, Druck und Sicherheit📦
Kurze Beschreibung:
“The City Climate Finance Gap Fund (‘Gap Fund’) supports cities in low and middle income countries in their development and implementation of climate...”
Kurze Beschreibung
The City Climate Finance Gap Fund (‘Gap Fund’) supports cities in low and middle income countries in their development and implementation of climate strategies and investment projects. It provides assistance in the early stages of project preparation, from understanding the context to executing plans: from capacity building to strategy development; from collection of technical data to convening stakeholders; from support on investment prioritisation to the early stages of project preparation. By supporting cities in both upstream (supporting strategy development and prioritisation of interventions) and downstream (project identification and pre-feasibility) work, the Gap Fund helps reach the climate impact required for achieving global goals to limit temperature increase to 1.5 degrees above pre-industrial levels.
The Gap Fund is a partnership among donors: the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Ministry of Economic Cooperation and Development (BMZ) and Luxembourg's Ministry of the Environment, Climate and Sustainable Development. Implementors are the European Investment Bank (EIB) in partnership with the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ), and the World Bank (WB).
1️⃣
Zusätzliche Produkte/Dienstleistungen: Dienstleistungen im Energiebereich📦
Zusätzliche Produkte/Dienstleistungen: Beratung im Bereich Energieeinsparung📦
Ort der Leistung: Deutschland🏙️
Hauptstandort oder Erfüllungsort: 00000 Global.
Beschreibung der Beschaffung:
“The Gap Fund activities are organised into three main tracks:
1) Support to urban strategy development (WB);
2) Support for low-carbon, climate-resilient...”
Beschreibung der Beschaffung
The Gap Fund activities are organised into three main tracks:
1) Support to urban strategy development (WB);
2) Support for low-carbon, climate-resilient project development (WB and EIB/GIZ);
3) Partnership coordination, knowledge and information sharing among project preparation facilities and standardisation of early project preparation approaches (advocacy, outreach and coordination - WB and EIB/GIZ).
In Track 2 the Gap Fund receives requests for the preparation of climate resilient and low-carbon urban infrastructure projects, in which individual cities apply for technical assistance. EIB-GIZ Gap Fund's Technical Secretariat assesses eligibility of the project ideas and selects the most eligible projects for support. For selected investment projects GIZ in close cooperation with the city administrations prepares Terms of Reference (ToR) in which the support services (so called ‘TA packages’) to the individual cities are described in detail. These TA packages are implemented in the individual cities by an external consulting firm. Every assignment requires an individual approach to design suitable support modality and output.
GIZ is looking for a consulting firm to provide advisory to cities and municipalities worldwide in the preparation of climate mitigation or adaptation infrastructure projects in the energy sector. Until 2025 approximately 12 TA packages are to be implemented within the contract period (approximately 3 - 4 TA packages per year).
The amount and scope of a TA package for the individual city project is not set, but it is assumed that a single assignment will not exceed a period of 1 year with a budget in the range of EUR 50 000 - EUR 200 000.
The tender requires a deployment of short time experts up to 960 expert days. Implementation is scheduled for the period from January 2022 to November 2025.
Mehr anzeigen Vergabekriterien
Der Preis ist nicht das einzige Zuschlagskriterium, und alle Kriterien werden nur in den Auftragsunterlagen genannt
Dauer
Datum des Beginns: 2022-01-01 📅
Datum des Endes: 2025-11-30 📅
Laufzeit des Vertrags, der Rahmenvereinbarung oder des dynamischen Beschaffungssystems
Dieser Vertrag ist verlängerbar ✅ Beschreibung
Beschreibung der Verlängerungen:
“GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender....”
Beschreibung der Verlängerungen
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Mehr anzeigen Informationen über Optionen
Optionen ✅
Beschreibung der Optionen:
“GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender....”
Beschreibung der Optionen
GIZ may optionally commission contract amendments and/or increases based on the criteria in the tender documents to the successful bidder of this tender. For details, please see the terms of reference.
Rechtliche, wirtschaftliche, finanzielle und technische Informationen Bedingungen für die Teilnahme
Liste und kurze Beschreibung der Bedingungen:
“1) Trading name and address, commercial register number;
2) Eligibility declaration that no grounds for exclusion in Section 123, 124 of the German Act...”
Liste und kurze Beschreibung der Bedingungen
1) Trading name and address, commercial register number;
2) Eligibility declaration that no grounds for exclusion in Section 123, 124 of the German Act Against Restraints of Competition (GWB) apply;
3) Eligibility declaration subcontractors if applicable;
4) Association clause if applicable.
Mehr anzeigen Wirtschaftliche und finanzielle Leistungsfähigkeit
Liste und kurze Beschreibung der Auswahlkriterien:
“1) Average annual turnover for the last 3 years (last-but-four financial year can be included in case of tenders held within 6 months of end of last...”
Liste und kurze Beschreibung der Auswahlkriterien
1) Average annual turnover for the last 3 years (last-but-four financial year can be included in case of tenders held within 6 months of end of last financial year), at least: EUR 1 200 000.00;
2) Average number of employees and managers in the last three calendar years, at least 20 persons.
Mehr anzeigen Technische und berufliche Fähigkeiten
Liste und kurze Beschreibung der Auswahlkriterien:
“1) The technical assessment is only based on reference projects with a minimum commission value of EUR 150 000.00;
2) At least 2 reference projects in the...”
Liste und kurze Beschreibung der Auswahlkriterien
1) The technical assessment is only based on reference projects with a minimum commission value of EUR 150 000.00;
2) At least 2 reference projects in the technical field field of energy/climate in the public sector and at least 3 reference projects in the region 2 from following regions: Asia, Africa, Lat. America, Caucasus in the last 3 years.
Verfahren Art des Verfahrens
Wettbewerbliches Verfahren mit Verhandlung
Informationen über eine Rahmenvereinbarung oder ein dynamisches Beschaffungssystem
Rahmenvertrag mit einem einzigen Betreiber
Administrative Informationen
Frist für den Eingang von Angeboten oder Teilnahmeanträgen: 2021-07-27
12:00 📅
Voraussichtliches Datum der Versendung der Aufforderungen zur Angebotsabgabe oder zur Teilnahme an die ausgewählten Bewerber: 2021-08-12 📅
Sprachen, in denen Angebote oder Teilnahmeanträge eingereicht werden können: Englisch 🗣️
Ergänzende Informationen Informationen über elektronische Arbeitsabläufe
Die elektronische Bestellung wird verwendet
Zusätzliche Informationen
“The communication takes place exclusively via the project area of the portal.
Notices-ID: CXTRYY6YL71” Körper überprüfen
Name: Die Vergabekammern des Bundes
Postanschrift: Villemombler Straße 76
Postort: Bonn
Postleitzahl: 53123
Land: Deutschland 🇩🇪
Telefon: +49 2289499-0📞
E-Mail: vk@bundeskartellamt.bund.de📧
Fax: +49 2289499-163 📠
URL: https://www.bundeskartellamt.de🌏 Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
“According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1) The...”
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1) The applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected;
2) Complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice;
3) Complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids;
4) More than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Mehr anzeigen
Quelle: OJS 2021/S 124-328524 (2021-06-25)
Bekanntmachung über vergebene Aufträge (2021-12-27) Öffentlicher Auftraggeber Name und Adressen
Postanschrift: Dag-Hammarskjöld-Weg 1 - 5
Objekt Umfang der Beschaffung
Titel:
“81271994-Support for Project Preparation for Urban Progress (SuPPUrbP) - City Climate Finance Gap Fund
81271994”
Kurze Beschreibung:
“The City Climate Finance Gap Fund ("Gap Fund") supports cities in low and middle income countries in their development and implementation of climate...”
Kurze Beschreibung
The City Climate Finance Gap Fund ("Gap Fund") supports cities in low and middle income countries in their development and implementation of climate strategies and investment projects. It provides assistance in the early stages of project preparation, from understanding the context to executing plans: from capacity building to strategy development; from collection of technical data to convening stakeholders; from support on investment prioritization to the early stages of project preparation. By supporting cities in both upstream (supporting strategy development and prioritization of interventions) and downstream (project identification and pre-feasibility) work, the Gap Fund helps reach the climate impact required for achieving global goals to limit temperature increase to 1.5 degrees above pre-industrial levels.
The Gap Fund is a partnership among donors: the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Ministry of Economic Cooperation and Development (BMZ) and Luxembourg"s Ministry of the Environment, Climate and Sustainable Development. Implementors are the European Investment Bank (EIB) in partnership with the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ), and the World Bank (WB).
Mehr anzeigen
Gesamtwert der Beschaffung (ohne MwSt.): EUR 936 500 💰
Beschreibung
Hauptstandort oder Erfüllungsort: 00000 Global
Beschreibung der Beschaffung:
“The Gap Fund activities are organized into three main tracks:
1. Support to urban strategy development (WB);
2. Support for low-carbon, climate-resilient...”
Beschreibung der Beschaffung
The Gap Fund activities are organized into three main tracks:
1. Support to urban strategy development (WB);
2. Support for low-carbon, climate-resilient project development (WB and EIB/GIZ)
3. Partnership coordination, knowledge and information sharing among project preparation facilities and standardisation of early project preparation approaches (advocacy, outreach and coordination - WB and EIB/GIZ).
In Track 2 the Gap Fund receives requests for the preparation of climate resilient and low-carbon urban infrastructure projects, in which individual cities apply for technical assistance. EIB-GIZ Gap Fund"s Technical Secretariat assesses eligibility of the project ideas and selects the most eligible projects for support. For selected investment projects GIZ in close cooperation with the city administrations prepares Terms of Reference (ToR) in which the support services (so called "TA packages") to the individual cities are described in detail. These TA packages are implemented in the individual cities by an external consulting firm. Every assignment requires an individual approach to design suitable support modality and output.
GIZ is looking for a consulting firm to provide advisory to cities and municipalities worldwide in the preparation of climate mitigation or adaptation infrastructure projects in the energy sector. Until 2025 approximately 12 TA packages are to be implemented within the contract period (approximately 3 - 4 TA packages per year).
The amount and scope of a TA package for the individual city project is not set, but it is assumed that a single assignment will not exceed a period of one year with a budget in the range of 50,000 - 200,000 EUR.
The tender requires a deployment of short time experts up to 960 expert days. Implementation is scheduled for the period from January 2022 to November 2025.
Mehr anzeigen Vergabekriterien
Qualitätskriterium (Bezeichnung): Exclusion if minimum score not reached
Qualitätskriterium (Gewichtung): 0
Qualitätskriterium (Bezeichnung): Achieved total score according to technichal evaluation
Qualitätskriterium (Gewichtung): 70
Preis (Gewichtung): 30.00
Verfahren Informationen zur Rahmenvereinbarung
Die Beschaffung umfasst die Erstellung einer Rahmenvereinbarung
Administrative Informationen
Frühere Veröffentlichungen zu diesem Verfahren: 2021/S 124-328524
Auftragsvergabe
1️⃣
Titel: Auftragsvergabe Gopa Infra GmbH
Datum des Vertragsabschlusses: 2021-12-03 📅
Informationen über Ausschreibungen
Anzahl der eingegangenen Angebote: 4
Anzahl der eingegangenen Angebote von KMU: 1
Anzahl der eingegangenen Angebote von Bietern aus anderen EU-Mitgliedstaaten: 1
Der Auftrag wurde an eine Gruppe von Wirtschaftsteilnehmern vergeben ✅ Name und Anschrift des Auftragnehmers
Name: Gopa Infra GmbH
Postort: Bad Homburg
Postleitzahl: 61348
Land: Deutschland 🇩🇪
Region: Hochtaunuskreis🏙️
Der Auftragnehmer ist ein KMU
Name: GOPA-International Energy Consultants GmbH (intec)
Postleitzahl: 61352
Angaben zum Wert des Auftrags/der Partie (ohne MwSt.)
Gesamtwert des Auftrags/Loses: EUR 936 500 💰
Ergänzende Informationen Zusätzliche Informationen
Bekanntmachungs-ID: CXTRYY6YSR7
Verfahren zur Überprüfung
Genaue Informationen über Fristen für Überprüfungsverfahren:
“According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the...”
Genaue Informationen über Fristen für Überprüfungsverfahren
According to Article 160, Section 3 of the German Act Against Restraint of Competition (GWB), application for review is not permissible insofar as
1. the applicant has identified the claimed infringement of the procurement rules before submitting the application for review and has not submitted a complaint to the contracting authority within a period of 10 calendar days; the expiry of the period pursuant to Article 134, Section 2 remains unaffected,
2. complaints of infringements of procurement rules that are evident in the tender notice are not submitted to the contracting authority at the latest by the expiry of the deadline for the application or by the deadline for the submission of bids, specified in the tender notice.
3. complaints of infringements of procurement rules that first become evident in the tender documents are not submitted to the contracting authority at the latest by the expiry of the deadline for application or by the deadline for the submission of bids,
4. more than 15 calendar days have expired since receipt of notification from the contracting authority that it is unwilling to redress the complaint.
Sentence 1 does not apply in the case of an application to determine the invalidity of the contract in accordance with Article 135, Section 1 (2). Article 134, Section 1, Sentence 2 remains unaffected.
Mehr anzeigen
Quelle: OJS 2021/S 255-675494 (2021-12-27)