Beschaffungen: Dong Energy Renewables Germany GmbH

5 archivierte Beschaffungen

Dong Energy Renewables Germany GmbH war in der Vergangenheit ein Käufer von transport- und Beförderungsdienstleistungen (außer Abfalltransport), bauarbeiten und baureifmachung.
In der Vergangenheit waren die Lieferanten von Dong Energy Renewables Germany GmbH HTM Helicopter Travel Munich GmbH und Johann Bunte Bauunternehmung GmbH & Co. KG.

Jüngste Beschaffungen durch Dong Energy Renewables Germany GmbH

2013-04-11   Gode Wind 02 and Gode Wind 01 Offshore Wind Farms - Transport and Installation of Offshore Substation(s) (Dong Energy Renewables Germany GmbH)
The Contract includes the following lots: Lot 1: Gode Wind 02: Transportation and Installation of one (1) Offshore Substation (jacket, piles and topside). Lot 2: Gode Wind 01: Transportation and Installation of one (1) Offshore Substation (jacket, piles and topside). Ansicht der Beschaffung »
2013-03-05   Gode Wind 02 and Gode Wind 01 Offshore Wind Farms - Transport and Installation of Offshore Substation(s) (Dong Energy Renewables Germany GmbH)
Following Lots: — Lot 1 : Gode Wind 02 - Transportation and installation of one Offshore Substation (jacket, piles and topside), — Lot 2 : Gode Wind 01 - Transportation and installation of one Offshore Substation (jacket, piles and topside), — Lot 3 : Lot 1 + Lot 2. Ansicht der Beschaffung »
2012-07-26   BKR01 - Construction of Operations & Maintenance Facilities (Dong Energy Renewables Germany GmbH)
Turnkey contract covering the construction of a 2 storey office and maintenance/warehouse building in the harbour area of Norddeich, including some civil work in the harbour and in connection with the installation of adjoining berthing facilities and possibly the provision of a crane as part of the berthing facilities. The operation & maintenance building may include an elevated helipad. Work expected to start beginning of 2013. The German VOB/B standard will be used for the contract. Ansicht der Beschaffung »
Erwähnte Lieferanten: Johann Bunte Bauunternehmung GmbH & Co. KG
2012-06-21   BKR01 - Construction of Operations & Maintenance Facilities (Dong Energy Renewables Germany GmbH)
Turnkey contract covering the construction of a 2 storey office and maintenance/warehouse building in the harbour area of Norddeich, including some civil work in the harbour and in connection with the installation of adjoining berthing facilities and possibly the provision of a crane as part of the berthing facilities. The operation & maintenance building may include an elevated helipad. Work expected to start beginning of 2013. Ansicht der Beschaffung »
2012-05-14   Helicopter Transportation Services (Dong Energy Renewables Germany GmbH)
Supply of helicopter transport services for transport of personnel between Norden airport (alternatively Emden airport or another airfield in the area) and the offshore Borkum Riffgrund Windfarm 1 during the installation of the wind-turbines and during the operation and maintenance phase and possibly the same services for the offshore Borkum Riffgrund Windfarm 2. The frame agreement will include offshore/hoisting operations on offshore substation and wind-turbines foundations/transition pieces. The … Ansicht der Beschaffung »
Erwähnte Lieferanten: HTM Helicopter Travel Munich GmbH