Beschaffungen: Innogy Nordsee 1 GmbH

5 archivierte Beschaffungen

Jüngste Beschaffungen durch Innogy Nordsee 1 GmbH

2013-04-12   Design, fabrication, supply, storage and installation of inter-array cables (Innogy Nordsee 1 GmbH)
Preparation of the design, supply, storage and installation of the inter-array cables connecting 54 wind turbine generators and the substation. Ansicht der Beschaffung »
Erwähnte Lieferanten: Siem Offshore Contractors GmbH
2013-03-07   Supply of substructure and foundations WTG, installation of topside and substructure and/ or installation of... (Innogy Nordsee 1 GmbH)
The first part of the tender called “Lot 05: Supply of Substructure & Foundation WTG” concerns the optional fabrication and supply of at least 44 and maximum 54 substructures and foundations. Each substructure and foundation consists of one monopile and a transition piece. The certified design for the 54 standard steelwork monopile substructure and foundation will be delivered by the contracting entity. It is the intention of the contracting entity to involve the contractor during the detailed design … Ansicht der Beschaffung »
2012-02-06   Harbour lease (Innogy Nordsee 1 GmbH)
The contract to be awarded concerns the base harbour lease for the installation works of the turbines as well as for the installation works of the foundations for the wind park Innogy Nordsee 1. The contracting entity reserves the right to place a letter of intent to secure the harbour in the time slot needed before the main contract is signed. Ansicht der Beschaffung »
2012-02-03   Innovative Foundations (Innogy Nordsee 1 GmbH)
The contract(s) to be awarded concerns the design, fabrication, supply and installation of up to ten foundations and substructures for the support of 6MW-class wind turbine generators (WTGs). These WTGs will be provided by the contracting entity and the contractor(s) is obliged to co-operate with the WTG supplier in the execution of this contract. The transition pieces to establish connection between foundation and substructure with the steel tower supporting this turbine shall be provided by the … Ansicht der Beschaffung »
2012-01-23   Design, engineering, construction and supply of inter-array cables (Innogy Nordsee 1 GmbH)
Preparation of the design, fabrication and supply of the inter-array cables connecting 54 wind turbine generators and the substation. Ansicht der Beschaffung »