Beschaffungen: Sandbank Offshore Wind GmbH

15 archivierte Beschaffungen

Jüngste Beschaffungen durch Sandbank Offshore Wind GmbH

2015-11-20   Sandbank TETRA Wind Turbine Tower Repeaters (Sandbank Offshore Wind GmbH)
The Contractor(s) shall engineer, supply, install, configure, commission and service one TETRA repeater system in each of the 72 wind turbine towers at the Sandbank offshore wind-farm. Ansicht der Beschaffung »
2015-10-19   Provision of Client Representatives and Quality Inspectors for wind turbine pre-assembly, installation and... (Sandbank Offshore Wind GmbH)
The contract shall comprise the provision of specialists for quality control and site representation on behalf of the Client (SBOW) for wind turbine pre-assembly (Lot 1), for wind turbine installation (Lot 2) and for wind turbine completion and commissioning works (Lot 3). The specialists shall be required to act as Client Representatives (Reps.) and quality inspectors and ensure that the wind turbine contractor fulfils its obligations with respect to the applicable standards, contractual requirements as … Ansicht der Beschaffung »
2015-05-28   Provision of Offshore Client Representatives for the Sandbank Inter Array Cable works (Sandbank Offshore Wind GmbH)
The contract shall comprise the provision of specialists for the surveillance on behalf of the Client (SBOW) of subsea cable lay/burial and, high voltage (HV) and Fibre Optic (FO) cable termination works. The specialists shall be required to act as Client Representatives (Reps.) and ensure that the installation contractor fulfils its obligations with respect to the agreed work procedures and method statements, and to report back to the Client. Ansicht der Beschaffung »
Erwähnte Lieferanten: Deutsche Windtechnik Offshore und Consulting GmbH eos projekt GmbH
2015-02-17   Rescue Helicopter (Sandbank Offshore Wind GmbH)
Provision a rescue helicopter along with medical crews to medical aid and service. Ansicht der Beschaffung »
2015-01-05   Sandbank — Marine Coordination Function (Sandbank Offshore Wind GmbH)
The contract shall comprise the provision of personnel to perform the ‘Marine Coordination’ function for the construction phase of the Sandbank Offshore Wind Farm (SBOW). ‘Marine Coordination’ will oversee all marine operations in the wind farm, provide advice to vessel Masters and coordinate an emergency response to any incident within the wind farm. The task encompasses traffic control for all vessels at the Offshore Installation Site, as well as people and equipment tracking. Marine Coordination must … Ansicht der Beschaffung »
2014-10-23   Housekeeping services for Dan Tysk offshore accommodation platform (Sandbank Offshore Wind GmbH)
The contract comprises the provision of life-support services including catering, cleaning, laundry, janitorial services, maintenance, managing of recreational facilities and support emergency response whilst adhering to Vattenfall's and industry health and safety policies at all times. The contractor shall provide the service continuously in order to support technicians and personnel operating on a 12h day shift basis while on board, 7 days per week at 365 days per year during the term of the contract. Ansicht der Beschaffung »
2014-09-17   Umweltverträglichkeitsstudie für den OWP Sandbank (Sandbank Offshore Wind GmbH)
Durchführung der Umweltverträglichkeitsstudie für den OWP Sandbank während der Bauphase gemäß aktuellem StUK 4 (BSH) mit geeignetem Referenzgebiet vom 1.6.2015 bis 30.4.2017 (geplanter Zeitraum). Ansicht der Beschaffung »
2014-07-25   Fabrication surveillance/ Client representation for the steelwork fabrication and corrosion protection of an... (Sandbank Offshore Wind GmbH)
Fabrication surveillance on behalf of SBOW including the provision of services and personnel to monitor all aspects of the production of an offshore substation, composed of a topside and jacket construction. Ansicht der Beschaffung »
Erwähnte Lieferanten: Progressive — Ein Geschäftszweig der SThree GmbH
2014-06-10   Foundation surveillance/ Client representation for the fabrication of offshore wind farm foundations (Sandbank Offshore Wind GmbH)
Fabrication surveillance on behalf of SBOW including the provision of services and personnel to monitor all aspects of the production of 72 Monopiles (MP) and Transition Pieces (TP). Ansicht der Beschaffung »
Erwähnte Lieferanten: Progressive — Ein Geschäftszweig der SThree GmbH
2014-05-27   Conditional Monitoring System (Sandbank Offshore Wind GmbH)
Conventional Monitoring with Option: Ambient Vibration Monitoring. Monitoring Scour Protection. Option: Service Contract for 2 years. Ansicht der Beschaffung »
Erwähnte Lieferanten: FORCE Technology
2013-06-03   Project certification of the offshore wind farm Sandbank (Sandbank Offshore Wind GmbH)
a. Sandbank Offshore Wind GmbH, Hamburg, intends to build an offshore wind farm in the North Sea. In the first construction phase it is planned to build 72 wind turbines with a total output of 288 MW, inter array cables and an offshore substation. The project is located in the German Bight area, around 90 km to the west of the Island of Sylt, directly on the border between Germany and Denmark. The water depth is between 24 and 35 m. b. The project is fully permitted and has received the first BSH release … Ansicht der Beschaffung »
Erwähnte Lieferanten: Germanischer Lloyd Industrial Services GmbH TÜV Süd Industrie Service GmbH
2013-02-08   CIV 2: Marine Construction of WTG Foundations Package (Sandbank Offshore Wind GmbH)
The whole project consists of 96 WTGs, WTG Foundations, Inter Array Cables and an Offshore Substation (OSS). The wind farm is located in the German Bight, 90 km west of the island of Sylt, in the German Exclusive Economic Zone (EEZ). The location provides water depths between 25 and 34 meters. The Sandbank project is equipped with an irrevocable permit. In a first construction phase 288 MW will be realized. The scope of work of this tender includes marine construction, installation, transportation … Ansicht der Beschaffung »
2013-02-08   CIV 1: WTG Foundation Manufacturing Package (Sandbank Offshore Wind GmbH)
The whole project consists of 96 WTGs, WTG Foundations, Inter Array Cables and an Offshore Substation (OSS). The wind farm is located in the German Bight, 90 km west of the island of Sylt, in the German Exclusive Economic Zone (EEZ). The location provides water depths between 25 and 34 meters. The Sandbank project is equipped with an irrevocable permit. In a first construction phase 288 MW will be realized. The total scope of work of this tender includes the manufacturing, fabrication, procurement of … Ansicht der Beschaffung »
2013-01-24   Design, engineering, manufacturing, fabrication, procurement, installation and commissioning of the Inter Array Cables (Sandbank Offshore Wind GmbH)
The whole project consists of 96 WTGs, WTG Foundations, Inter Array Cables and an Offshore Substation (OSS). The wind farm is located in the German Bight, 90 km west of the island of Sylt, in the German Exclusive Economic Zone (EEZ). The location provides water depths between 25 and 34 meters. The Sandbank project is equipped with an irrevocable permit. In a first construction phase 288 MW will be realised. Ansicht der Beschaffung »
2012-11-08   Design, engineering, supply, construction, installation and commissioning of an offshore substation (OSS) (Sandbank Offshore Wind GmbH)
The whole project consists of 96 WTGs, WTG foundations, Inter Aray cables and an Offshore Substation (OSS). The windfarm is located in the German Bight, 90 km west of the island of Sylt, in the German Exclusive Economic Zone (EEZ). The location provides water depths between 25 and 34 meters. The Sandbank project is equipped with an irrevocable permit. In a first construction phase 288 MW will be realised. The scope of work of this tender includes the design, engineering, supply, construction, … Ansicht der Beschaffung »