Beschaffungen: Trianel Windkraftwerk Borkum GmbH & Co. KG

12 archivierte Beschaffungen

Trianel Windkraftwerk Borkum GmbH & Co. KG war in der Vergangenheit ein Käufer von mit der Gewinnung von Erdöl und Erdgas verbundene Dienstleistungen, onshore- und Offshore-Dienste und offshore-Dienste.

Jüngste Beschaffungen durch Trianel Windkraftwerk Borkum GmbH & Co. KG

2022-11-18   Maintenance Tripod Foundations_2023-2024 (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Execution of corrosion protection and maintenance works on the steel structure of the offshore tripod foundations above the water line for the years 2023 and 2024 plus optional prolongation for the years 2025 and 2026. Ansicht der Beschaffung »
2022-03-01   Subsea Inspections 2022 - 2025 (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Yearly subsea inspection works comprising ROV inspections on offshore foundations and scour survey of the seabed for the years 2022 and 2023 with an optional prolongation for additional 2 years. Ansicht der Beschaffung »
2021-11-04   Direktvermarktung (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Gegenstand ist die Vergabe der Direktvermarktung des gesamten in den Windenergieanlagen des Offshore-Windparks des Auftraggebers erzeugten Stroms durch den Auftragnehmer nach Maßgabe der Regelungen des EEG. Ansicht der Beschaffung »
2021-01-11   TWB_CPS-Retrofit_DP-Bolt-Exchange_2021 (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Contract for subsea works on cable protection systems and subsea bolt exchanges at diffusor plates (steel plate underneath central column of tripod foundation) in the offshore windfarm Trianel Windpark Borkum. Scope of work 1: Installation of 20 preventive CPS retrofits; Scope of work 2: Installation of 4 corrective CPS retrofits; Scope of work 3: Bolt exchange at 6 steel plates. Installation phase is limited to 30 days with the option of extension by two times 7 days. Ansicht der Beschaffung »
2020-06-12   20200512_Operational All Risk Insurance Policy for an Offshore Wind Farm and a Substation (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Combined property damage and business interruption all risks insurance for the operational phase of the offshore wind farm Trianel Windpark Borkum, consisting of 40 offshore wind turbines including foundations and inner-array cables, and a separate similar policy for the Infrastruktur Windkraftwerk Borkum GmbH & Co. KG covering only property damage for their offshore substation. Ansicht der Beschaffung »
2020-06-08   Marine, Flight and Emergency Response Coordination Services (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Service of execution of marine, flight and emergency response coordination service for the TWBI offshore windfarm, phase 1 and IWB offshore substation including the provision of personnel, equipment, software, establishment of interfaces to OWF [offshore windfarm] data/information as well as the preparation of any necessary documentation. TWBI: Execution of marine, flight and emergency response coordination service, operations monitoring and control of TWBIs offshore windfarm. IWB: Execution of marine, … Ansicht der Beschaffung »
2019-12-20   TWB_CPS-Retrofit_DP-Bolt-Exchange_2020 (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Contract for subsea works on CPS retrofits and subsea bolt exchanges at diffusor plates (steel plate under central column of tripod foundation) in the offshore windfarm Trianel Windpark Borkum. Ansicht der Beschaffung »
2016-09-26   Operational All Risks Policy for an Offshore Wind Farm (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Combined property and Business interruption all risks insurance for the operational phase of the offshore wind farm Borkum West II. This contains 40 offshore wind turbines with 5.0 MW each including foundations, offshore substation and all inter-array cables. Ansicht der Beschaffung »
2014-01-02   BWII General Agreement for the Provision of Offshore Vessels (Trianel Windkraftwerk Borkum GmbH & Co. KG)
The Framework Agreement governs the general conditions concerning the delivery of different types of vessels being able used to accommodate and transfer crew/personnel, as well as to supply goods and materials to, from and in the offshore site of the Project as well as accomodation vessels and other offshore supply and installation vessels .to shore and vice versa. The supply of each such vessel has to be specified by Individual Orders in form of a BIMCO Charter Party (WINDTIME), as amended by the Parties. Ansicht der Beschaffung »
2013-05-10   Diesel bunkering to the BW II offshore substation (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Main service to be provided is the regular supply of batches of 100 cubic metre to 120 cubic metre of Diesel Type EN590 during the WTG installation campaign to the BWII offshore substation. Deliveries are at request by TWB. The supply vessels shall be suitable for bunkering operations and be equipped with redundant fuel pumps. Fuel bunkering shall be combined with the supply of fresh water, the disposal of black water and the transport of other minor cargoes to and from the offshore substation. The BWII … Ansicht der Beschaffung »
2013-05-03   Performance of diving works including provision of a suitable vessel (Trianel Windkraftwerk Borkum GmbH & Co. KG)
During the installation of the foundation tripods onto the pre-installed piles a number of grout seals were ‘ripped out'. The function of the grout seals is to contain the grout within the sleeve annulus. Without a grout seal the sleeve annulus cannot be grouted. There are seven (7) tripod sleeves which are affected. Repair clamps have been designed and fabricated and when installed will close off the bottom of the sleeve annulus to allow it to be grouted. These clamps need to be installed around the … Ansicht der Beschaffung »