Beschaffungen: Trianel Windkraftwerk Borkum GmbH & Co. KG
20 archivierte Beschaffungen
Trianel Windkraftwerk Borkum GmbH & Co. KG war in der Vergangenheit ein Käufer von mit der Gewinnung von Erdöl und Erdgas verbundene Dienstleistungen, onshore- und Offshore-Dienste und offshore-Dienste.
Jüngste Beschaffungen durch Trianel Windkraftwerk Borkum GmbH & Co. KG
2024-01-31
Rotor Blade Inspection 2024 (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Rotor Blade Inspection in Trianel Windpark Borkum (2024-2026) Ansicht der Beschaffung »
Rotor Blade Inspection in Trianel Windpark Borkum (2024-2026) Ansicht der Beschaffung »
2023-12-04
Awarding Maintenance ICCP and Ethernet Network (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Inspection, maintenance and repair services of the TWBI wind energy converter´s (WEC) internal ICCP systems (cabinets) and ethernet network components Ansicht der Beschaffung »
Inspection, maintenance and repair services of the TWBI wind energy converter´s (WEC) internal ICCP systems (cabinets) and ethernet network components Ansicht der Beschaffung »
2022-11-18
Maintenance Tripod Foundations_2023-2024 (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Execution of corrosion protection and maintenance works on the steel structure of the offshore tripod foundations above the water line for the years 2023 and 2024 plus optional prolongation for the years 2025 and 2026. Ansicht der Beschaffung »
Execution of corrosion protection and maintenance works on the steel structure of the offshore tripod foundations above the water line for the years 2023 and 2024 plus optional prolongation for the years 2025 and 2026. Ansicht der Beschaffung »
2022-03-01
Subsea Inspections 2022 - 2025 (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Yearly subsea inspection works comprising ROV inspections on offshore foundations and scour survey of the seabed for the years 2022 and 2023 with an optional prolongation for additional 2 years. Ansicht der Beschaffung »
Yearly subsea inspection works comprising ROV inspections on offshore foundations and scour survey of the seabed for the years 2022 and 2023 with an optional prolongation for additional 2 years. Ansicht der Beschaffung »
2021-11-04
Direktvermarktung (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Gegenstand ist die Vergabe der Direktvermarktung des gesamten in den Windenergieanlagen des Offshore-Windparks des Auftraggebers erzeugten Stroms durch den Auftragnehmer nach Maßgabe der Regelungen des EEG. Ansicht der Beschaffung »
Gegenstand ist die Vergabe der Direktvermarktung des gesamten in den Windenergieanlagen des Offshore-Windparks des Auftraggebers erzeugten Stroms durch den Auftragnehmer nach Maßgabe der Regelungen des EEG. Ansicht der Beschaffung »
2021-01-11
TWB_CPS-Retrofit_DP-Bolt-Exchange_2021 (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Contract for subsea works on cable protection systems and subsea bolt exchanges at diffusor plates (steel plate underneath central column of tripod foundation) in the offshore windfarm Trianel Windpark Borkum. Scope of work 1: Installation of 20 preventive CPS retrofits; Scope of work 2: Installation of 4 corrective CPS retrofits; Scope of work 3: Bolt exchange at 6 steel plates. Installation phase is limited to 30 days with the option of extension by two times 7 days. Ansicht der Beschaffung »
Contract for subsea works on cable protection systems and subsea bolt exchanges at diffusor plates (steel plate underneath central column of tripod foundation) in the offshore windfarm Trianel Windpark Borkum. Scope of work 1: Installation of 20 preventive CPS retrofits; Scope of work 2: Installation of 4 corrective CPS retrofits; Scope of work 3: Bolt exchange at 6 steel plates. Installation phase is limited to 30 days with the option of extension by two times 7 days. Ansicht der Beschaffung »
2020-06-12
20200512_Operational All Risk Insurance Policy for an Offshore Wind Farm and a Substation (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Combined property damage and business interruption all risks insurance for the operational phase of the offshore wind farm Trianel Windpark Borkum, consisting of 40 offshore wind turbines including foundations and inner-array cables, and a separate similar policy for the Infrastruktur Windkraftwerk Borkum GmbH & Co. KG covering only property damage for their offshore substation. Ansicht der Beschaffung »
Combined property damage and business interruption all risks insurance for the operational phase of the offshore wind farm Trianel Windpark Borkum, consisting of 40 offshore wind turbines including foundations and inner-array cables, and a separate similar policy for the Infrastruktur Windkraftwerk Borkum GmbH & Co. KG covering only property damage for their offshore substation. Ansicht der Beschaffung »
2020-06-08
Marine, Flight and Emergency Response Coordination Services (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Service of execution of marine, flight and emergency response coordination service for the TWBI offshore windfarm, phase 1 and IWB offshore substation including the provision of personnel, equipment, software, establishment of interfaces to OWF [offshore windfarm] data/information as well as the preparation of any necessary documentation. TWBI: Execution of marine, flight and emergency response coordination service, operations monitoring and control of TWBIs offshore windfarm. IWB: Execution of marine, … Ansicht der Beschaffung »
Service of execution of marine, flight and emergency response coordination service for the TWBI offshore windfarm, phase 1 and IWB offshore substation including the provision of personnel, equipment, software, establishment of interfaces to OWF [offshore windfarm] data/information as well as the preparation of any necessary documentation. TWBI: Execution of marine, flight and emergency response coordination service, operations monitoring and control of TWBIs offshore windfarm. IWB: Execution of marine, … Ansicht der Beschaffung »
2019-12-20
TWB_CPS-Retrofit_DP-Bolt-Exchange_2020 (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Contract for subsea works on CPS retrofits and subsea bolt exchanges at diffusor plates (steel plate under central column of tripod foundation) in the offshore windfarm Trianel Windpark Borkum. Ansicht der Beschaffung »
Contract for subsea works on CPS retrofits and subsea bolt exchanges at diffusor plates (steel plate under central column of tripod foundation) in the offshore windfarm Trianel Windpark Borkum. Ansicht der Beschaffung »
2019-11-28
TWB1D01STP-037-19_Framework Agreement Recovery and Deployment Sonar Transponder_TWB (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Recovery and Deployment Sonar Transponder. Ansicht der Beschaffung »
Recovery and Deployment Sonar Transponder. Ansicht der Beschaffung »
2016-09-26
Operational All Risks Policy for an Offshore Wind Farm (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Combined property and Business interruption all risks insurance for the operational phase of the offshore wind farm Borkum West II. This contains 40 offshore wind turbines with 5.0 MW each including foundations, offshore substation and all inter-array cables. Ansicht der Beschaffung »
Combined property and Business interruption all risks insurance for the operational phase of the offshore wind farm Borkum West II. This contains 40 offshore wind turbines with 5.0 MW each including foundations, offshore substation and all inter-array cables. Ansicht der Beschaffung »
2014-01-02
BWII General Agreement for the Provision of Offshore Vessels (Trianel Windkraftwerk Borkum GmbH & Co. KG)
The Framework Agreement governs the general conditions concerning the delivery of different types of vessels being able used to accommodate and transfer crew/personnel, as well as to supply goods and materials to, from and in the offshore site of the Project as well as accomodation vessels and other offshore supply and installation vessels .to shore and vice versa. The supply of each such vessel has to be specified by Individual Orders in form of a BIMCO Charter Party (WINDTIME), as amended by the Parties. Ansicht der Beschaffung »
The Framework Agreement governs the general conditions concerning the delivery of different types of vessels being able used to accommodate and transfer crew/personnel, as well as to supply goods and materials to, from and in the offshore site of the Project as well as accomodation vessels and other offshore supply and installation vessels .to shore and vice versa. The supply of each such vessel has to be specified by Individual Orders in form of a BIMCO Charter Party (WINDTIME), as amended by the Parties. Ansicht der Beschaffung »
2013-05-10
Diesel bunkering to the BW II offshore substation (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Main service to be provided is the regular supply of batches of 100 cubic metre to 120 cubic metre of Diesel Type EN590 during the WTG installation campaign to the BWII offshore substation. Deliveries are at request by TWB. The supply vessels shall be suitable for bunkering operations and be equipped with redundant fuel pumps. Fuel bunkering shall be combined with the supply of fresh water, the disposal of black water and the transport of other minor cargoes to and from the offshore substation. The BWII … Ansicht der Beschaffung »
Main service to be provided is the regular supply of batches of 100 cubic metre to 120 cubic metre of Diesel Type EN590 during the WTG installation campaign to the BWII offshore substation. Deliveries are at request by TWB. The supply vessels shall be suitable for bunkering operations and be equipped with redundant fuel pumps. Fuel bunkering shall be combined with the supply of fresh water, the disposal of black water and the transport of other minor cargoes to and from the offshore substation. The BWII … Ansicht der Beschaffung »
2013-05-03
Performance of diving works including provision of a suitable vessel (Trianel Windkraftwerk Borkum GmbH & Co. KG)
During the installation of the foundation tripods onto the pre-installed piles a number of grout seals were ‘ripped out'. The function of the grout seals is to contain the grout within the sleeve annulus. Without a grout seal the sleeve annulus cannot be grouted. There are seven (7) tripod sleeves which are affected. Repair clamps have been designed and fabricated and when installed will close off the bottom of the sleeve annulus to allow it to be grouted. These clamps need to be installed around the … Ansicht der Beschaffung »
During the installation of the foundation tripods onto the pre-installed piles a number of grout seals were ‘ripped out'. The function of the grout seals is to contain the grout within the sleeve annulus. Without a grout seal the sleeve annulus cannot be grouted. There are seven (7) tripod sleeves which are affected. Repair clamps have been designed and fabricated and when installed will close off the bottom of the sleeve annulus to allow it to be grouted. These clamps need to be installed around the … Ansicht der Beschaffung »
2010-07-07
Schaden- oder Verlustversicherungen (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Schaden- oder Verlustversicherungen. Haftpflichtversicherungen. Ansicht der Beschaffung »
Schaden- oder Verlustversicherungen. Haftpflichtversicherungen. Ansicht der Beschaffung »
2009-09-23
Rechnungslegung und -prüfung (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Bezeichnung des Auftrags durch den Auftraggeber: Windkraftwerk Borkum West II 1. Teil - Kaufmännische Betriebsführung eines Offshore Windparks mit 40 Windenergieanlagen(WEA) und Umspannwerk. Der Auftraggeber beabsichtigt die Errichtung eines Offshore Windparks mit 40 WEA mit je 5 MWel in der AWZ in der Nordsee. Der Auftrag umfasst die kaufmännische Betriebsführung des Windparks nebst Infrastruktur (insbesondere Umspannwerk) in der Bau- und Betriebsphase nach Maßgabe des Handelsgesetzbuchs (HGB), des … Ansicht der Beschaffung »
Bezeichnung des Auftrags durch den Auftraggeber: Windkraftwerk Borkum West II 1. Teil - Kaufmännische Betriebsführung eines Offshore Windparks mit 40 Windenergieanlagen(WEA) und Umspannwerk. Der Auftraggeber beabsichtigt die Errichtung eines Offshore Windparks mit 40 WEA mit je 5 MWel in der AWZ in der Nordsee. Der Auftrag umfasst die kaufmännische Betriebsführung des Windparks nebst Infrastruktur (insbesondere Umspannwerk) in der Bau- und Betriebsphase nach Maßgabe des Handelsgesetzbuchs (HGB), des … Ansicht der Beschaffung »
2009-07-01
Betrieb von elektrischen Anlagen (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Bezeichnung des Auftrags durch den Auftraggeber: Windkraftwerk Borkum West II 1. Teil – Technische Betriebsführung eines Offshore Windparks mit 40 Windenergieanlagen (WEA). Der Auftraggeber beabsichtigt die Errichtung eines Offshore Windparks mit 40 WEA (je 5 MWel) mit Gründungsstrukturen, Innerverkabelung und Umspannwerk in der AWZ in der Nordsee. Der Auftrag umfasst den Betrieb des Windparks, einschließlich aller Komponenten, nach Maßgabe der Betriebsvorschriften der Anlagenlieferanten, etwa … Ansicht der Beschaffung »
Bezeichnung des Auftrags durch den Auftraggeber: Windkraftwerk Borkum West II 1. Teil – Technische Betriebsführung eines Offshore Windparks mit 40 Windenergieanlagen (WEA). Der Auftraggeber beabsichtigt die Errichtung eines Offshore Windparks mit 40 WEA (je 5 MWel) mit Gründungsstrukturen, Innerverkabelung und Umspannwerk in der AWZ in der Nordsee. Der Auftrag umfasst den Betrieb des Windparks, einschließlich aller Komponenten, nach Maßgabe der Betriebsvorschriften der Anlagenlieferanten, etwa … Ansicht der Beschaffung »
2009-06-16
Seekabel (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Bezeichnung des Auftrags durch den Auftraggeber: Windkraft Borkum West II 1. Teil - Lieferung und Verlegung Innerparkverkabelung für einen Offshore Windpark. Lieferung und Verlegung von Seekabeln geeignet zur Stromübertragung bis zu 200 MW in einer Wassertiefe von bis zu 40 m und einer Küstenentfernung bis zu 55 km. Gesamtlänge der Kabel ca. Die endgültige Beauftragung erfolgt nach Erteilung des Baubeschlusses durch die Gesellschafter des Auftraggebers. Der Auftraggeber behält sich vor, in den … Ansicht der Beschaffung »
Bezeichnung des Auftrags durch den Auftraggeber: Windkraft Borkum West II 1. Teil - Lieferung und Verlegung Innerparkverkabelung für einen Offshore Windpark. Lieferung und Verlegung von Seekabeln geeignet zur Stromübertragung bis zu 200 MW in einer Wassertiefe von bis zu 40 m und einer Küstenentfernung bis zu 55 km. Gesamtlänge der Kabel ca. Die endgültige Beauftragung erfolgt nach Erteilung des Baubeschlusses durch die Gesellschafter des Auftraggebers. Der Auftraggeber behält sich vor, in den … Ansicht der Beschaffung »
2009-06-16
Herstellung von Offshore-Modulen (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Bezeichnung des Auftrags durch den Auftraggeber: Windkraftwerk Borkum West II 1. Teil – Lieferung der Plattform (Top Side) und der Gründungsstruktur für das bereitgestellte Umspannwerk Borkum West II. Zusammenbau Top Side und Umspannwerk Onshore inkl aller Hebearbeiten, exkl. elektrische Anschlussarbeiten. Herstellung und Lieferung der Top Side für ein bereitgestelltes Umspannwerk mit 400 MW elektrischer Leistung, inkl 2 Transformatoren und sämtlicher dazugehörigen Nebenkomponenten und Schaltanlagen. … Ansicht der Beschaffung »
Bezeichnung des Auftrags durch den Auftraggeber: Windkraftwerk Borkum West II 1. Teil – Lieferung der Plattform (Top Side) und der Gründungsstruktur für das bereitgestellte Umspannwerk Borkum West II. Zusammenbau Top Side und Umspannwerk Onshore inkl aller Hebearbeiten, exkl. elektrische Anschlussarbeiten. Herstellung und Lieferung der Top Side für ein bereitgestelltes Umspannwerk mit 400 MW elektrischer Leistung, inkl 2 Transformatoren und sämtlicher dazugehörigen Nebenkomponenten und Schaltanlagen. … Ansicht der Beschaffung »
2009-06-16
Windenergieanlagen (Trianel Windkraftwerk Borkum GmbH & Co. KG)
Bezeichnung des Auftrags durch den Auftraggeber: Windkraftwerk Borkum West II 1. Teil – Errichtung eines Offshore Windparks mit bereitgestellten 40 Windenergieanlagen inkl. Gründung und Umspannwerk. Transport und Errichtung von betriebsfertigen technologischen Ausrüstungen (40 Stk. Windenergieanlagen (je 5 MWel) mit Gründungsstrukturen, Türmen und Gondeln) zur Stromerzeugung inkl. Beschaffung der notwendigen Transport, Logistik- und Errichtereinheiten in der deutschen AWZ. Transport und Errichtung eines … Ansicht der Beschaffung »
Bezeichnung des Auftrags durch den Auftraggeber: Windkraftwerk Borkum West II 1. Teil – Errichtung eines Offshore Windparks mit bereitgestellten 40 Windenergieanlagen inkl. Gründung und Umspannwerk. Transport und Errichtung von betriebsfertigen technologischen Ausrüstungen (40 Stk. Windenergieanlagen (je 5 MWel) mit Gründungsstrukturen, Türmen und Gondeln) zur Stromerzeugung inkl. Beschaffung der notwendigen Transport, Logistik- und Errichtereinheiten in der deutschen AWZ. Transport und Errichtung eines … Ansicht der Beschaffung »