2019-11-22   Nordsee One GmbH — SMA WTGs (Nordsee One GmbH)
The wind farm Nordsee One (N1) is located in the German Bight, approximately 32 km north of the island Juist. The water depth ranges roughly between 26 m and 34 m (LAT) with 2,7 m tidal range. Under operation are 54 Senvion wind turbine generators (WTG) of 6.2M126 type with a nominal output of 6.15 MW. N1 wants to enter into a Service- and maintenance agreement (SMA) with a long-term full-scope service for the 54 WTGs, starting from 7.12.2020 until 6.12.2027. The main tasks of the scope will be … Ansicht der Beschaffung »
2018-02-27   Wiederkehrende prüfung WTG nacelle und blades (Nordsee One GmbH)
Wiederkehrende prüfung WTG nacelle und blades bei dem offshore wind park Nordsee One Ansicht der Beschaffung »
2016-06-22   Supply of Electricity to Nordsee One for own power consumption (Nordsee One GmbH)
We are looking to purchase electricity for the wind-farms own consumption in case we can not cover it ourselves due to a lack of wind. Ansicht der Beschaffung »
2015-11-19   Balance of Plant — Subsea (Nordsee One GmbH)
The contract to be awarded concerns the provision of maintenance and inspections of all Subsea systems and equipment for an initial period of five years, commencing 1.4.2017. Earlier commencement (1.11.2016) and extension for a further term of 5 years are optional. The Subsea Services will include the provision of all required tools, equipment and personnel with the required qualifications. Onshore facilities and access logistics (i.e. crew vessel) will be provided by the contracting entity in / out off … Ansicht der Beschaffung »
Erwähnte Lieferanten: NDE Offshore A/B
2015-11-19   Balance of Plant — LV / Auxiliary (Nordsee One GmbH)
The contract to be awarded concerns the provision of maintenance and inspections of the LV and Auxiliary equipment on the offshore substation (OSS) for an initial period of five years, commencing 1.11.2017. Earlier commencement (1.11.2016) and extension for a further term of five years are optional. The LV/Auxiliary Services will include the provision of all required tools, equipment and personnel with the required qualifications. Onshore facilities and access logistics (i.e. crew vessel) will be … Ansicht der Beschaffung »
Erwähnte Lieferanten: Semco Maritime
2015-11-19   Balance of Plant — HV / MV (Nordsee One GmbH)
The contract to be awarded concerns the provision of maintenance and inspections of the HV and MV equipment on the offshore substation (OSS) for an initial period of five years, commencing 1.11.2017. Earlier commencement (1.11.2016) and extension for a further term of five years are optional. The HV/MV Services will include the provision of all required tools, equipment and personnel with the required qualifications. Onshore facilities and access logistics (i.e. crew vessel) will be provided by the … Ansicht der Beschaffung »
Erwähnte Lieferanten: Semco Maritime
2015-11-19   Balance of Plant — Structural (Nordsee One GmbH)
Provision of maintenance and inspections of all structural works on the offshore substation, its jacket foundation, and the wind turbine generators' monopile foundations in offshore wind farm Nordsee One. The initial contract period shall be five years, commencing 01.11.2017. Earlier commencement (01.11.2016) and extension for another five years term are optional. The Structural Services will include the provision of all required tools, equipment and personnel with the required qualifications. Onshore … Ansicht der Beschaffung »
Erwähnte Lieferanten: Semco Maritime
2015-08-24   Crew Transfer Vessel (Nordsee One GmbH)
The contract is for the charter of a Crew Transfer Vessel capable of daily transfers of staff and equipment from Norddeich or alternative harbours to the N1 site and in between the individual locations and vice versa and the vessel shall be equipped such that refuelling diesel generators on the foundation and diesel tanks of substation is possible. Ansicht der Beschaffung »
Erwähnte Lieferanten: EMS Maritime Offshore GmbH
2015-06-02   Marine coordination center staffing (Nordsee One GmbH)
Provision of personnel for marine coordination. Ansicht der Beschaffung »
Erwähnte Lieferanten: EMS Maritime Offshore GmbH
2015-06-01   Guard vessel services for monitoring and safeguarding the wind farm construction area (Nordsee One GmbH)
The Guard Vessel Services of monitoring and safeguarding the wind farm construction area shall be provided continuously over the entire installation phase on a 24/7 basis. The vessel shall be able to observe the surrounding, not project related traffic, evaluate if any risk of collision or unauthorised entrance is likely to occur and take measures accordingly. Ansicht der Beschaffung »
Erwähnte Lieferanten: EMS Maritime Offshore GmbH
2015-05-20   Efficiency monitoring noise mitigation (Nordsee One GmbH)
Services are required for the environmental efficiency monitoring and reporting during the construction phase of the Offshore Windfarm Nordsee One (N1) with regards to offshore underwater sound monitoring, marine mammal monitoring and acoustic deterrence in accordance to BSH Standard ‘Investigation of the Impact of Offshore Wind Turbines on the Marine Environment (StUK4)’ and Nordsee One Permit conditions. The scope will be split into separate lots, with marine mammal monitoring and reporting … Ansicht der Beschaffung »
Erwähnte Lieferanten: Bioconsult/Itap, C/O Bioconsult SH GmbH & Co KG
2015-01-05   Marine warranty surveyor (Nordsee One GmbH)
Marine Warranty Surveyor services for the Nordsee One Offshore Wind Farm. These services include the approval and issuance of certificates for relevant documents, procedures and activities in relation to the construction of the wind farm. Those documents and activities may include e.g. Load-outs and barge movements; positioning and orientation procedures; piling procedures; cable route surveys; cable designs and cable installation procedures and activities. Ansicht der Beschaffung »
Erwähnte Lieferanten: Con4Mare GmbH & Cie. KG
2014-12-12   Manufacturing surveillance, transport and installation surveillance and commissioning surveillance including As build reports (Nordsee One GmbH)
The contract to be awarded concerns the services regarding the Manufacturing Surveillance, Transport and Installation Surveillance and Commissioning Surveillance including As Build Reports for project certification according the BSH Standard, relevant Offshore Rules and Standards as well as the Nordsee One Permit conditions. Employees for Installation Surveillance and Commissioning Surveillance have to fulfil the requirements for offshore works under German labour legislation. Ansicht der Beschaffung »
Erwähnte Lieferanten: TÜV Süd Industrie Service GmbH
2014-09-10   Construction Insurance including Third Party Liability and Delay in Start-Up for the Nordsee One GmbH offshore wind... (Nordsee One GmbH)
Construction Insurance including Third Party Liability and Delay in Start-Up for the Nordsee One GmbH offshore wind project. Nordsee One GmbH offshore wind project will be a 332 MW wind farm in the German North Sea. After the pre-qualification of Tenderers, it is expected that the Tender submission material will be available electronically between October 2014 — December, 2015. The exact date and activity plan will be available in the Tender Submission material. The evaluation of tenders will be made … Ansicht der Beschaffung »
2014-04-16   Quality - Surveillance activities (Nordsee One GmbH)
Services regarding the certification for the wind farm Nordsee One. These quality services shall contain service regarding the surveillance activities for the wind farm Nordsee One during production of the components, long term storage, harbour works and installation. Ansicht der Beschaffung »
Erwähnte Lieferanten: ABS Group SGS Germany GmbH
2014-04-10   EPCI & SMA Wind Turbine Generators (Nordsee One GmbH)
Design, certify, supply, installation, commission and test (full EPCI) of 54 WTGs (rotor-nacelle-tower-assembly) with a nominal power from 5.0 MW up to 6.15 MW, rotor diameter 126 m up to 154 m, 54 x Towers (Tower starting from interface level with transition piece) 54 x Medium voltage switchgears, 54 x Platform Cranes, 1 x SCADA System incl. Park Controller. EPCI to include: design of the foundation and substructure for the WTG. The design shall include the certifiable basic and detail design of both … Ansicht der Beschaffung »
Erwähnte Lieferanten: Senvion SE
2013-12-13   Construction Insurance including Third Party Liability and Delay in Start-Up for the Nordsee One GmbH offshore wind... (Nordsee One GmbH)
Construction Insurance including Third Party Liability and Delay in Start-Up for the Nordsee One GmbH offshore wind project. Nordsee One GmbH offshore wind project will be a 332 MW wind farm in the German North Sea. After the prequalification of Tenderers, it is expected that the Tender submission material will be available electronically between December 2013 - January, 2014. According to schedule the quotes should be submitted February, 2014. The exact date and activity plan will be available in the … Ansicht der Beschaffung »
2013-09-25   Service Base for Offshore Windfarm Nordsee One (Nordsee One GmbH)
The contract to be awarded concerns the services regarding the provision of onshore facilities and 2 berths for 2 crew transfer vessel for N1. The onshore facilities should consist of an administration area, social rooms, a kitchen, sanitary facilities, a heated room and ventilated (for drying clothes and lifesaving equipment), a storage area with suitable environmental conditions, workshop room, electrical storage area, hazardous material area as well as a waste and disposal area required for the … Ansicht der Beschaffung »
Erwähnte Lieferanten: Norddeicher Schiffswerft GmbH