Jüngste Beschaffungen durch Trianel Windkraftwerk Borkum II GmbH & Co. KG
2023-01-19Charter CTV 2023 (Trianel Windkraftwerk Borkum II GmbH & Co. KG)
Charter of a crew transfer vessel (CTV) for the transportation of personnel as well as material, components and spare parts to the offshore wind farm Trianel Windpark Borkum II as well as possibly other wind farms in the vicinity of the Trianel Windpark Borkum II.
Ansicht der Beschaffung »
2022-12-02ICCP_Exchange_2023 (Trianel Windkraftwerk Borkum II GmbH & Co. KG)
TWB II is going to tender a ICCP system for 2023. The scope of work consists of an as found survey on 32 WTGs, an exchange of all damaged anodes and cables on approx. 12 - 30 anodes and cables (amount will be quantified more precisely before the start of operation) and the installation of a cable protection retrofit on 32 WTGs of the wind farm Trianel Windpark Borkum Phase II. The campaign is expected to start between May 2023 and July 2023 and end of execution is planned for August 2023.
Ansicht der Beschaffung »
2022-09-19Main Bearing LCC 2023 (Trianel Windkraftwerk Borkum II GmbH & Co. KG)
Trianel Windpark Borkum II consists of 32 offshore wind turbines of type "Senvion 6.2M152 Power Upgrade". Due to damage, the main bearing units have to be replaced.
The subsequent contractual partner is responsible for all tasks associated onshore with the refitting and reuse of offshore main bearing units (MBU) as well as offshore with the provision of a suitable vessel, equipment and personnel for the exchange of MBU.
Ansicht der Beschaffung »
2022-08-01OAR_BI_2023 (Trianel Windkraftwerk Borkum II GmbH & Co. KG)
Combined Physical Damage and Business Interruption All Risks Insurance for the operational phase of Phase II of the offshore wind farm Trianel Windpark Borkum, consisting of 32 offshore wind turbines including foundations and inner-array cables.
Reference is made to the procedure letter for the submission of tender - call for competition.
Ansicht der Beschaffung »
2021-05-19TWBII-21-06_Repair Campaign Transition Piece 2021 (Trianel Windkraftwerk Borkum II GmbH & Co. KG)
Correction of defects on the transition piece of all TWB2 wind turbines:
SOW 1: Exchange of 17 ventilator fan drives on the Transition Pieces (TP);
SOW 2: Mechanical retrofits on handrails, swinggate stoppers, as well as WTG tower door bumpers and holders on main access platforms of 31 TPs;
SOW 3:Testing and re-setting of Draeger H2 / Cl sensors on 31 TPs.
Ansicht der Beschaffung »