Die jüngsten Beschaffungen von tiefseekabel in Deutschland
2022-12-23Longterm EPCI Contracts for HVDC Cables on Off- and Onshore Projects (50Hertz Transmission GmbH)
This tender contains a binding scope of seven on- and offshore connections with 525 kV HVDC power cables on basis of EPCI-contracts. The four offshore and three onshore projects are divided into three lots (1 - 3) containing an overall binding volume of 3.536 km core cable length. Additionally the contracting Entity is awarding a lot (Lot 7) with optional volume for future projects with an expected volume of 900 km core cable length and a maximum volume of 2.700 km core cable length.
The complete scope …
Ansicht der Beschaffung »
2021-12-22HVDC Cable link for the electrical interconnection between Sweden and Germany (Hansa Power Bridge Project) (50Hertz Transmission GmbH)
The project intends to procure a turnkey solution for an HVDC cable (300kV) between Hurva (Sweden) and Güstrow (Germany) comprised of:
• Engineering
• Testing
• Manufacturing
• Storage
• Installation
• Commissioning
This includes, but is not limited to:
• the Underground Cable System in Germany and Sweden
• the Submarine Cable System
• the Underground Fibre Optic Cable System in Germany
• the Submarine Fibre Optic Cable System
• the Optical Shed in Sweden
• Service Agreement
Ansicht der Beschaffung »
2021-09-03BorWin5 Überwachung der Kabelfertigung (Tennet TSO GmbH)
Gegenstand dieser Ausschreibung ist die Überwachung als unabhängiger Dritter im Auftrag des Auftraggebers der TenneT Offshore GmbH, zur Qualitätssicherung der HGÜ-Kabelsysteme am Produktionsstandort der NKT HV Cables AB in Karlskrona, Schweden während und nach der Produktion der HGÜ-Land- und Seekabel im Rahmen des Projektes BorWin5.
Der Auftrag für das Gleichstromkabel wurde an NKT im August 2020 erteilt. Gemäß dem Vertrag mit NKT umfasst der Arbeitsumfang für das Gleichstromkabel und das LWL-Kabel …
Ansicht der Beschaffung » Erwähnte Lieferanten:Primo Marine The Netherlands B.V.
2021-05-28BorWin 6 – HVDC Kabelsystem (TenneT Offshore GmbH)
BorWin6: Schlüsselfertige Neuerrichtung eines HVDC-Kabelsystems als Teil des Netzanschlusssystems BorWin6 zur Übertragung elektrischer Energie zwischen den Kabelendverschlüssen der HGÜ-Seestation BorWin kappa und den DC-Kabelendverschlüssen der HGÜ-Landstation einschließlich aller land- und seeseitigen erforderlichen Anlagen, Nebenanlagen und Komponenten.
Die Errichtung und betriebsbereite Installation der HGÜ-See- und Landstation sind nicht Gegenstand dieser, sondern einer separaten Ausschreibung.
Ansicht der Beschaffung »
2020-02-09Construction of AC Grid Connection Systems for Projects Kaskasi II and Gode Wind 3: (TenneT Offshore GmbH)
Turnkey construction of 2 AC grid connection systems to connect the offshore wind farms Kaskasi II (approx. 342 MW) and Gode Wind 3 (approx. 242 MW) to the associated HVDC sea stations. The scope comprises all works from design to manufacturing, delivery and installation up to operational commissioning of a secure and high availability transmission of electrical energy from the grid connection points at the HVDC offshore station to the AC grid connection points on the OWF (Offshore Wind Farm) station. …
Ansicht der Beschaffung »
2018-09-05Rock Placement in the North Sea (Germany and/or Netherlands) (TenneT Offshore GmbH)
Scope of this tender are "Rock Placement Activities" in the North Sea (Germany and/or Netherlands) for the grid connection systems operated by TenneT. "Rock Placement Activities" are usually, but not limited to, ordered for standard crossing constructions, for scour protection in the vicinity of offshore platforms or for remedial burial works to ensure the respective depth of burial of the energy transmission cable.
Ansicht der Beschaffung »
2016-06-15Offshore Windpark (OWP) „Albatros“ – Los Innerparkverkabelung (IAG) (EnBW Energie Baden-Württemberg AG)
Schlüsselfertige Planung (inkl. Projektzertifizierung), Beschaffung, Herstellung, Lieferung und Installation der Innerparkverkabelung für einen OWP mit bis zu 19 Windenergieanlagen auf Monopfählen (auf den vom AG definierten Standortvarianten) ggf. inklusive Anbindung an OWP „Hohe See“.
Die finale Auftragsvergabe ist u. a. abhängig von gesetzlichen Rahmenbedingungen, Genehmigungen und der Netzanbindung. Der Vertragsabschluss ist für 2016 vorgesehen.
Installation offshore und Inbetriebnahme muss in Q2 …
Ansicht der Beschaffung »
2014-07-21Offshore Windpark (OWP) EnBW Hohe See – Los Innerparkverkabelung (IAG) (EnBW Energie Baden Württemberg AG)
Planung, Beschaffung, Herstellung, Lieferung und Installation der Innerparkverkabelung für einen OWP von bis zu 80 Anlagen eines Windturbinentyps zwischen 3,6 MW und der 6-MW Klasse.
Die finale Auftragsvergabe ist u. a. abhängig von gesetzlichen Rahmenbedingungen, Genehmigungen und der Netzanbindung. Der Vertragsabschluss ist für 2015 vorgesehen. Die Fertigstellung soll bis spätestens 2019 erfolgen.
Ansicht der Beschaffung »
2011-05-06Fertigung und Verlegung von Seekabeln für den Anschluss von Offshore-Windparks sowie Herstellung und Lieferung von... (Tennet TSO GmbH)
Aufteilung in 2 Lose:
1. Fertigung, Lieferung und Verlegung von AC-Seekabeln, inkl. Lichtwellenleiter, im Bereich des Clusters DolWin, ausgelegt für eine Übertragungsleistung von bis zu 400 MW je anzuschließendem Windpark und eine Spannungsebene von ca. 155kV; Kabeleinzug auf der Plattform der/des Offshorewindparkbetreiber(s); Erstellung von Kreuzungsbauwerken;
2. Fertigung und Lieferung (an Werft) von ca. 2-4 seetauglichen Kompensationsspulen mit einer Blindleistung von bis zu 20 MVar; Verwendung auf …
Ansicht der Beschaffung »